Ccil quiz - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Ccil quiz? On this page you'll find 9 study documents about Ccil quiz.
All 9 results
Sort by
-
CCIL Quiz with Complete Solutions 100% Verified Rated A+
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
CCIL Quiz with Complete Solutions 100% Verified Rated A+ 
Between what percentages must you sample a concrete truck? - Correct Answer 10% and 90% 
 
What is grab sampling? - Correct Answer Securing at one point of the discharge as fast as possible. 
 
Tamping rod size for 100 x 200mm cylinders - Correct Answer 10 +/- 1mm in diameter, between 450 mm and 600 mm 
 
Minimum sample required for 150 x 300mm cylinder? - Correct Answer 30L 
 
How long do you have to obtain, transport and remix sample? -...
-
CCIL Quiz Questions with 100% Correct Answers | Latest Update 2024 | Verified
- Exam (elaborations) • 6 pages • 2024
-
- $9.99
- + learn more
CCIL Quiz Questions with 100% Correct Answers | Latest Update 2024 | Verified
-
CCIL Quiz | Questions with 100% Correct Answers | Latest Update 2024 | Verified
- Exam (elaborations) • 6 pages • 2023
-
- $11.99
- + learn more
CCIL Quiz | Questions with 100% Correct Answers | Latest Update 2024 | Verified
-
CCIL Quiz With Correct Questions and Answers
- Exam (elaborations) • 5 pages • 2024
-
- $12.99
- + learn more
CCIL Quiz With Correct Questions and Answers
-
CCIL Quiz | 50 Questions with 100% Correct Answers | Updated & Verified
- Exam (elaborations) • 6 pages • 2023
-
- $8.49
- + learn more
Between what percentages must you sample a concrete truck? - 10% and 90% 
What is grab sampling? - Securing at one point of the discharge as fast as possible. 
Tamping rod size for 100 x 200mm cylinders - 10 +/- 1mm in diameter, between 450 mm 
and 600 mm 
Minimum sample required for 150 x 300mm cylinder? - 30L 
How long do you have to obtain, transport and remix sample? - 10 mins 
Vibration Frequency of internal vibrator - 120Hz 
Size of internal vibrator. - 20 to40mm in diameter, minimum 50mm ...
Too much month left at the end of the money?
-
CCIL TEST Questions & Answers 2024(A+GRADED 100%VERIFIED)
- Exam (elaborations) • 9 pages • 2024
-
- $8.99
- + learn more
CCIL TEST Questions & Answers 2024(A+GRADED 100%VERIFIED)
-
CCIL Quiz with Complete Solutions 100% Verified
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $7.59
- + learn more
Measuring Bowl - Answer 
Sufficiently rigid to limit expansion to 0.1% of scale reading at operating pressure. 7L bowl maximum aggregate size of 40mm, 15L bowl maximum aggregate size of 56mm. 
 
Moisture Room - Answer 
Temperature must be read every 15 mins by a recorder- Must be accurate to 1 degree C. 
 
Movable Portion of Bearing Block - Answer 
Must be able to rotate freely and tilt 4 degrees in any direction. 
 
Perpendicularity - Answer 
 No specimen shall depart from perpendicularity to t...
-
CCIL Quiz with Complete Solutions 100% Verified Rated A+
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $7.69
- + learn more
A sample contains aggregate larger than that appropriate for the size of the moulds or equipment. - Answer 
 It must be wet-sieved prior to testing 
 
Air Content - Answer 
The volume of air voids of plastic concrete, exclusive of pore space in aggregate particles, determined through observations of the change of air volume in concrete with a change in pressure. 
 
Air Guage Dial - Answer 
Permits direct reading to a minimum of 0.2% for air volumes in the usual range of 0-8%. 
 
Air Meter Readin...
-
CCIL Quiz with Complete Solutions 100% Verified Rated A+
- Package deal • 3 items • 2024
-
- $12.49
- + learn more
A sample contains aggregate larger than that appropriate for the size of the moulds or equipment. - Answer
 It must be wet-sieved prior to testing

Air Content - Answer
The volume of air voids of plastic concrete, exclusive of pore space in aggregate particles, determined through observations of the change of air volume in concrete with a change in
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia