Allowable strength - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Allowable strength? On this page you'll find 818 study documents about Allowable strength.

All 818 results

Sort by

PATHFINDER WRITTEN SLING LOAD EXAM 2024 ACTUAL QUESTIONS AND ANSWERS SOLVED AND VERIFIED 100% Popular
  • PATHFINDER WRITTEN SLING LOAD EXAM 2024 ACTUAL QUESTIONS AND ANSWERS SOLVED AND VERIFIED 100%

  • Exam (elaborations) • 14 pages • 2024
  • PATHFINDER WRITTEN SLING LOAD EXAM 2024 ACTUAL QUESTIONS AND ANSWERS SOLVED AND VERIFIED 100% Which reference covers Basic Sling Load Operations and Equipment? Ans- TM 4-48.09 Which reference covers Single Point Sling Load Rigging Procedures? Ans- TM 4-48.10 Which reference covers Dual Point Sling Load Rigging Procedures? Ans- TM 4-48.11 Which reference covers Pathfinder Operations? Ans- FM 3-21.38 Which reference covers Airdrop Platform Rigging Procedures? Ans- FM 4-20....
    (1)
  • $13.99
  • 4x sold
  • + learn more
ACI Flatwork Exam All Possible Questions and Answers with complete solution Popular
  • ACI Flatwork Exam All Possible Questions and Answers with complete solution

  • Exam (elaborations) • 9 pages • 2024 Popular
  • Available in package deal
  • It is important that the ____________ __________ read and understand project specifications. - Answer-finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. - Answer-100 Concrete is sold by the ton? - Answer-False Delays in discharging concrete trucks can result in the concrete being hard to: - Answer-pump, place, and finish When there is room for two concrete trucks ready to discharge into a pump ho...
    (0)
  • $7.99
  • 2x sold
  • + learn more
ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+
  • ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+

  • Exam (elaborations) • 43 pages • 2024
  • ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+ Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not e...
    (0)
  • $11.49
  • 2x sold
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 52 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - Answer- B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B...
    (0)
  • $14.49
  • 1x sold
  • + learn more
Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss
  • Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • SITEWORK, FOOTING, AND FONDATIONS FIRST SECTION A foundation drain shall extend past the outside edge of the footing at least how far? 12 inches What are batter boards? Stakes and ledger boards marking building lines. What is the purpose of a cove or can't strip at a foundation joint? Deflect water from the foundation wall. What is the MINIMUM overlap for the joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wa...
    (1)
  • $13.99
  • 1x sold
  • + learn more
Air Assault Phase 1 Test Questions and Answers 100% Pass
  • Air Assault Phase 1 Test Questions and Answers 100% Pass

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • Air Assault Phase 1 Test Questions and Answers 100% Pass Maximum Airspeed of the AH-64A Apache 140-145 knots Cruising speed of the AH-64A Apache 120 knots Flight Time of AH-64A Apache 1 hour 50 minutes Number of crew members for AH-64A Apache 2 Number of 30 mm chain gun rounds for AH-64A Apache 1200 Number of laser guided hell fire II missles for AH-64A Apache 16 Number of 2.75 inch FFAR rounds for AH-64A 76 FFAR Folding Fin Ariel Rockets Has winglets, for armament purposes and 4 blade m...
    (1)
  • $9.49
  • 4x sold
  • + learn more
MN Boiler License Questions With Complete Solutions Graded A+
  • MN Boiler License Questions With Complete Solutions Graded A+

  • Exam (elaborations) • 37 pages • 2024
  • MN Boiler License Questions With Complete Solutions Graded A+ a question an answer what are the conditions necessary for good combustion? a) low sulfur content b) Thermal, thermocoupler, tubular c) turbulence, temperature, time 3T's c) turbulence, temperature, time 3T's why is secondary air necessary in hand fired boilers? a) Necessary to burn the combustible gases b) if primary air should fail c) used only if sulfur content is high a) Necessary to burn the combustible gases whe...
    (0)
  • $18.99
  • 2x sold
  • + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024
  • Nicet Level 2: Concrete Exam Questions and Answers 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Nicet Level 2: Concrete Exam Questions and Answers 2024 What is the testing frequency for concrete? - Answer-every 50 yards When should you take cylinder samples? - Answer-Every 100 yards What are the components on a batch ticket? - Answer-1. Ticket Number 2. Plant 3. Project Number 4. Mix ID 5. Time of Batch 6. Time arrival 7. Time Discharge 8. Time Completed 9. Mix proportions When should concrete samples should not be taken? - Answer-Before 10% and 90% of truck has been discharge...
    (0)
  • $11.49
  • 1x sold
  • + learn more
ICC Codes Exam Questions with Correct Answers.docx
  • ICC Codes Exam Questions with Correct Answers.docx

  • Exam (elaborations) • 7 pages • 2024
  • ICC Codes Exam Questions with Correct A Which of the following publications is most useful for a Special Inspector? - Answer-ACI 318 A is a horizontal member that transfers loads laterally. - Answer-Beam Plain concrete refers to: - Answer-Concrete with less than the minimum amount of reinforcement Answer-Flexure, compression The best place to look up definitions in ACI 318-14 is: - Answer-Chapter 2 Foundations cast at the same elevation as the soil grade are known as: - Answer...
    (0)
  • $13.59
  • 1x sold
  • + learn more
ASE B6 Test - Damage Analysis & Estimating 2023 Solved 100%
  • ASE B6 Test - Damage Analysis & Estimating 2023 Solved 100%

  • Exam (elaborations) • 11 pages • 2023
  • What is the difference between a unitized frame and a uni-body? - ANSWER-There is no difference. In a uni-body or unitized vehicle, the frame and body are incorporated into a single welded structure. Should exhaust damaged systems be welded and repaired, or replaced all together? - ANSWER-Replaced. Exhaust gases contain poisonous carbon monoxide and leaks could create dangerous conditions for passengers. The "Inside Out" sequence refers to... - ANSWER-Calculating Labor times SAI refer...
    (1)
  • $10.49
  • 6x sold
  • + learn more