Aia contract - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Aia contract? On this page you'll find 237 study documents about Aia contract.
All 237 results
Sort by
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 42 pages • 2024
-
- $14.49
- 2x sold
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - answerAnswer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usually bound wit...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024 Popular
- Available in package deal
-
- $15.49
- 2x sold
- + learn more
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
-
CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $11.99
- 2x sold
- + learn more
CMIT Exam (200 multiple choice) Questions with Verified Answers 
 
A CM's role and responsibilities are governed solely by the Owner/CM Agreement. 
True False - CORRECT ANSWER True 
 
There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction management practice. However, there are some key differences. Which of the following do not apply to both CM forms? 
A) Both forms provide advice to the owner on constructibility, budget and the schedule....
-
AIA contract document A201 - Study Set
- Exam (elaborations) • 18 pages • 2024
-
- $9.99
- + learn more
AIA contract document A201 - Study Set 
 
A201 covers what information? - General conditions of the contract for construction. 
 
According to section 1.1.1 what are acceptable modifications to the contract issued after 
execution? - 
1) A written amendment to the contract signed by both parties 
2) A change order 
3) A construction change directive 
4) A written order for a minor change in work issued by the architect. 
 
What items do the contract documents not include? - Advertisement or inv...
-
FL Business and Finance Practice Test 100% Correct
- Exam (elaborations) • 23 pages • 2023
-
Available in package deal
-
- $9.99
- 1x sold
- + learn more
FL Business and Finance Practice Test 100% Correct 
The owner must prove financial capability no later than ________ days prior to the expiration of the time for withdrawal of bids. A. 3 B. 5 C.7 D.30 Answer: C. 7 - AIA 701.6.2 
How many copies of the plans and specifications shall the contractor maintain on site? A. 1 B. 2 C. 3 D. 4 Answer: A. 1 - AIA201 2.3.6 
Contracts entered into by unlicensed contractors ________________. A. are immoral B.are illegal C. are enforceable D. are unenforceable...
Too much month left at the end of the money?
-
AIA contract document A201 - Study Set Exam 2023-2024
- Exam (elaborations) • 13 pages • 2023
-
- $9.49
- + learn more
AIA contract document A201 - Study Set Exam ...
-
AIA contract document A201 - Study Set | 85 Questions with 100% Correct Answers | Updated & Verified
- Exam (elaborations) • 18 pages • 2023
-
- $15.49
- + learn more
A201 covers what information? - General conditions of the contract for construction. 
According to section 1.1.1 what are acceptable modifications to the contract issued after 
execution? - 
1) A written amendment to the contract signed by both parties 
2) A change order 
3) A construction change directive 
4) A written order for a minor change in work issued by the architect. 
What items do the contract documents not include? - Advertisement or invitation to bid, 
Instructions to bidders, samp...
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
-
Available in package deal
-
- $18.49
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
-
CDT Exam|100 Questions and Answers 100% Accurate
- Exam (elaborations) • 52 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
CDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% Accurate 
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. 
 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above...
-
CDT Exam Questions and Answers (Verified).
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
CDT Exam Questions and Answers (Verified). 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia