CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 42 pages • 2024
-
- $14.49
- 2x sold
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - answerAnswer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usually bound wit...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024 Popular
- Available in package deal
-
- $15.49
- 2x sold
- + learn more
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
-
CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $11.99
- 2x sold
- + learn more
CMIT Exam (200 multiple choice) Questions with Verified Answers 
 
A CM's role and responsibilities are governed solely by the Owner/CM Agreement. 
True False - CORRECT ANSWER True 
 
There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction management practice. However, there are some key differences. Which of the following do not apply to both CM forms? 
A) Both forms provide advice to the owner on constructibility, budget and the schedule....
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
-
Available in package deal
-
- $18.49
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
-
CDT Exam|100 Questions and Answers 100% Accurate
- Exam (elaborations) • 52 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
CDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% Accurate 
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. 
 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above...
As you read this, a fellow student has made another $4.70
-
CDT Exam Questions and Answers (Verified).
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
CDT Exam Questions and Answers (Verified). 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
-
- $15.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
-
CDT Exam Questions and Answers (Verified).
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
CDT Exam Questions and Answers (Verified). 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
-
CDT Exam Questions and Answers (Verified).
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
CDT Exam Questions and Answers (Verified). 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....