Aci test exam Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aci test exam? On this page you'll find 380 study documents about Aci test exam.

All 380 results

Sort by

ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+ Popular
  • ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+

  • Exam (elaborations) • 43 pages • 2024
  • ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+ Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not e...
    (0)
  • $11.49
  • 2x sold
  • + learn more
ACI AGGREGATE TESTING TECHNICIAN - LEVEL 1 - SECTION 4 EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED Popular
  • ACI AGGREGATE TESTING TECHNICIAN - LEVEL 1 - SECTION 4 EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED

  • Exam (elaborations) • 3 pages • 2024 Popular
  • ACI AGGREGATE TESTING TECHNICIAN - LEVEL 1 - SECTION 4 EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED AASHTO T 27 / ASTM C136 In this test method a set of sieves with progressively _____ openings determines the ______ of the size of the particles sampled. Smaller, distribution AASHTO T 27 / ASTM C136 The purpose of the test is to determine the _____ of the materials used as aggregates or proposed to be used as aggregates. Grading AASHTO T 27 / ASTM C136 Results of the test may also be...
    (0)
  • $7.99
  • 1x sold
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 52 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - Answer- B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B...
    (0)
  • $14.49
  • 1x sold
  • + learn more
ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) with 100% Correct Answers
  • ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) with 100% Correct Answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) with 100% Correct Answers The Method of determining air content of concrete containing lightweight aggregate is the pressure method. True or False? - Answer- False When making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete. True or False? - Answer- True While the technician is checking the slump of the ...
    (1)
  • $10.49
  • 1x sold
  • + learn more
ACI Test Exam Questions and Answers 100% Correct | Updated 2024
  • ACI Test Exam Questions and Answers 100% Correct | Updated 2024

  • Exam (elaborations) • 7 pages • 2024
  • ACI Test Exam Questions and Answers 100% Correct | Updated 2024
    (0)
  • $10.49
  • + learn more
ACI Test exam 2024 with100% correct answers
  • ACI Test exam 2024 with100% correct answers

  • Exam (elaborations) • 8 pages • 2024
  • The total time allowed between obtaining the first and final portions of a composite sample isAnswer - 15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F)Answer - F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sampleAnswer - 5 minutes Begin molding test specimens within ______ minutes after obtaining th...
    (0)
  • $13.99
  • + learn more
ACI WRITTEN TEST EXAM 2024 ACTUAL  EXAM 2 VERSIONS (VERSION A AND B)  COMPLETE 400 QUESTIONS WITH  DETAILED VERIFIED ANSWERS (100%  CORRECT ANSWERS) / ALREADY  GRADED A+
  • ACI WRITTEN TEST EXAM 2024 ACTUAL EXAM 2 VERSIONS (VERSION A AND B) COMPLETE 400 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) / ALREADY GRADED A+

  • Exam (elaborations) • 70 pages • 2024
  • ACI WRITTEN TEST EXAM 2024 ACTUAL EXAM 2 VERSIONS (VERSION A AND B) COMPLETE 400 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) / ALREADY GRADED A+
    (0)
  • $18.19
  • + learn more
ACI Test EXAM(Graded A+ actual test)
  • ACI Test EXAM(Graded A+ actual test)

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • The total time allowed between obtaining the first and final portions of a composite sample is - Answer- 15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - Answer-F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - Answer-5 minutes Begin molding test specimens within ______ minutes after obtaining the ...
    (0)
  • $7.99
  • + learn more
ACI Test Exam Questions With 100% Correct Answers 2024/2025
  • ACI Test Exam Questions With 100% Correct Answers 2024/2025

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • ACI Test Exam Questions With 100% Correct Answers 2024/2025 The total time allowed between obtaining the first and final portions of a composite sample is - answer15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - answerF Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - answer5 minutes Begin molding...
    (0)
  • $11.49
  • + learn more