When backfilling - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about When backfilling? On this page you'll find 118 study documents about When backfilling.

Page 4 out of 118 results

Sort by

2a Hoisting license Exam Questions With Correct Answers.
  • 2a Hoisting license Exam Questions With Correct Answers.

  • Exam (elaborations) • 18 pages • 2024
  • 2a Hoisting license Exam Questions With Correct Answers. What is the purpose of the swing gear on an excavator - answerIt connects the car body to the tracks Who is responisble for inspecting a trench before anyone goes in it - answerThe equipment operator What is the prefered sling angle - answer60* The top of the spoil pile is called - answerThe crown A four footbdeep trench requires an additional ladder for each _ of open trench - answer25ft Materials mist be kept back from the edge ...
    (0)
  • $11.49
  • + learn more
NASCLA Commercial Building Exam Questions with 100% Correct Answers
  • NASCLA Commercial Building Exam Questions with 100% Correct Answers

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • NASCLA Commercial Building Exam Questions with 100% Correct Answers What is the minimum ceiling height for means of Egress? - answerNot less than 7 feet 6 inches Emergency Power must illuminate for how long? - answerNo less than 90 minutes Elevators are required in a building with how many stories? - answerMore than 3 (or at least 4). What is the size of the refuge space for one wheel chair? - answer30 inches by 48 inches Each area of refuge shall be separated from the remainder of the s...
    (0)
  • $12.49
  • + learn more
Kentucky UST Certification Exam Review Questions and Verified Answers Update 2024-2025 (100% VERIFIED)
  • Kentucky UST Certification Exam Review Questions and Verified Answers Update 2024-2025 (100% VERIFIED)

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • Kentucky UST Certification Exam Review Questions and Verified Answers Update (100% VERIFIED) When you are lifting a tank, using the lifting lugs, which of these procedures should be followed? - correct answers attach a triangle cable through the lugs with no more than a 30 degree angle from the center line. After you unload a new tank on a clean level surface at the job site what else should you do prior to inspection and pre-testing? - correct answers Chock the tank to prevent it from Rol...
    (0)
  • $17.49
  • + learn more
NASCLA Commercial Building Exam 100% Solved
  • NASCLA Commercial Building Exam 100% Solved

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • NASCLA Commercial Building Exam 100% Solved What is the minimum ceiling height for means of Egress? -answer Not less than 7 feet 6 inches Emergency Power must illuminate for how long? -answer No less than 90 minutes Elevators are required in a building with how many stories? -answer More than 3 (or at least 4). What is the size of the refuge space for one wheel chair? -answer 30 inches by 48 inches Each area of refuge shall be separated from the remainder of the story by what? -answer S...
    (0)
  • $12.49
  • + learn more
2a Hoisting license Exam Questions With Complete Solutions (Verified And Updated)
  • 2a Hoisting license Exam Questions With Complete Solutions (Verified And Updated)

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • 2a Hoisting license Exam Questions With Complete Solutions (Verified And Updated) What is the purpose of the swing gear on an excavator - answerIt connects the car body to the tracks Who is responisble for inspecting a trench before anyone goes in it - answerThe equipment operator What is the prefered sling angle - answer60* The top of the spoil pile is called - answerThe crown A four footbdeep trench requires an additional ladder for each _ of open trench - answer25ft Materials mist be...
    (0)
  • $12.49
  • + learn more
Site Engineering for Landscape Architects (Strom, Nathan, Woland) 2023/2024
  • Site Engineering for Landscape Architects (Strom, Nathan, Woland) 2023/2024

  • Exam (elaborations) • 9 pages • 2023
  • Site Engineering for Landscape Architects (Strom, Nathan, Woland)A grading plan should show; - correct answer All existing and proposed features of the site. Including: all buildings, structures, walls, walks, steps, roads, utilities lines, utility structures, and underground structures. spot elevations are used to supplement contours in 6 situations: - correct answer 1. To indicate variations from the normal slope between contour lines. 2. To indicate elevations of intersecting planes (buil...
    (0)
  • $15.49
  • + learn more
Kentucky UST Certification Exam Practice Questions With 100% Verified Answers | Latest Update 2023/2024
  • Kentucky UST Certification Exam Practice Questions With 100% Verified Answers | Latest Update 2023/2024

  • Exam (elaborations) • 43 pages • 2023
  • when installing a steel tank which has zinc anodes welded directly onto the tank for cathodic protection you should - correct answers remove the plastic wrapping around the anodes prior to installation if local authorities and tank manufacturers permit a sand slurry mixture to be used for backfilling a tank what steps should be taken to ensure that use of the slurry is proper? - correct answers use only Personnel trained in the sand slurry method by the tank manufacturer and use the method...
    (0)
  • $23.49
  • + learn more
Mass Hoisting Test Questions With Complete Solutions (Verified And Updated)
  • Mass Hoisting Test Questions With Complete Solutions (Verified And Updated)

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Mass Hoisting Test Questions With Complete Solutions (Verified And Updated) What is the purpose of the swing gear on an excavator - answerIt connects the car body to the tracks Who is responsible for inspecting a trench before anyone goes in it - answerThe equipment operator What is the preferred sling angle of these angles? 60 degrees 45 degrees 30 degrees - answer60 degrees The top of the spoil pile is called - answerCrown A four foot deep trench requires an additional ladder for ev...
    (0)
  • $12.49
  • + learn more
Mass Hoisting Test Questions With Complete Solutions (Verified And Updated)
  • Mass Hoisting Test Questions With Complete Solutions (Verified And Updated)

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Mass Hoisting Test Questions With Complete Solutions (Verified And Updated) What is the purpose of the swing gear on an excavator - answerIt connects the car body to the tracks Who is responsible for inspecting a trench before anyone goes in it - answerThe equipment operator What is the preferred sling angle of these angles? 60 degrees 45 degrees 30 degrees - answer60 degrees The top of the spoil pile is called - answerCrown A four foot deep trench requires an additional ladder for ev...
    (0)
  • $12.49
  • + learn more
AHIT up to electrical Practice Questions and Answers (100% Pass)
  • AHIT up to electrical Practice Questions and Answers (100% Pass)

  • Exam (elaborations) • 88 pages • 2024
  • Available in package deal
  • AHIT up to electrical Practice Questions and Answers (100% Pass) What is the overall purpose of the structural inspection? a. to report signs of water penetration b. to check for code compliance c. to identify major structural deficiencies d. to recommend inspection by a structural engineer - Answer️️ -c What part of a home's structure is least likely to be visible to the home inspector? a. crawl space b. footings c. attic d. foundation - Answer️️ -b When should the home in...
    (0)
  • $12.49
  • + learn more