Journeyman Plumbing| 451 Questions| With Complete Solutions
- Exam (elaborations) • 49 pages • 2023
-
Available in package deal
-
- $15.99
- + learn more
Travel correct answer: The Distance from the initial offset to the second fitting 
 
Advance correct answer: Distance parallel to the pipes between the offset fittings 
 
Offset correct answer: Distance the pipe is offset from original position to new position 
 
Rolling offsets formula correct answer: Travel = Rise x 2 = Spread x 2 
 
What are the three ways water is present? correct answer: Solid - Ice 
Liquid - Water 
Gas - Steam 
 
Pressure formula? correct answer: Pressure= Head x .43...
-
Journeyman plumber Quiz 1- 6 Questions With Complete Solutions
- Exam (elaborations) • 41 pages • 2023
-
Available in package deal
-
- $15.99
- + learn more
T/F: Refining iron-ore requires extreme heat and a reducing agent to draw oxygen out of the iron-ore. This reducing 
agent, called coke, is a grayish-black substance composed mostly of carbon. correct answer: True 
 
GIVEN: Lead-and-oakum joints are strong. Plumbers make these joints by pouring molten lead over oakum fiber to form a 
watertight seal. This fiber is a caulking material of old hemp rope or jute fibers that have been treated with tar or a tar-like 
derivative. 
 
QUESTION: What ans...
-
CWEA CSM GRADE 2 - PRACTICE TEST Accurate 100%
- Exam (elaborations) • 18 pages • 2024
-
Available in package deal
-
- $16.99
- + learn more
In order to accurately estimate the flow of a sanitary sewer overflow (SSO) you must have: - ANSWER Spill start time, spill end time and spill rate 
 
Providing a plan and schedule to properly manage, operate and maintain all parts of the sanitary sewer system is the goal of a: - ANSWER A sewer system management plan (SSMP) 
 
What are the basics elements of a safety program? - ANSWER Safety policy, statement, safety training, accident investigation 
 
What factor must be considered when obtaini...
-
Journeyman Plumbing Exam Questions and Answers 100% Solved
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Journeyman Plumbing Exam 
Questions and Answers 100% Solved 
Travel - answerThe Distance from the initial offset to the second fitting 
Advance - answerDistance parallel to the pipes between the offset fittings 
Offset - answerDistance the pipe is offset from original position to new position 
Rolling offsets formula - answerTravel = Rise x 2 = Spread x 2 
What are the three ways water is present? - answerSolid - Ice 
Liquid - Water 
Gas - Steam 
Pressure formula? - answerPressure= Head x .434 
...
-
Test questions Exam Questions And Answers
- Exam (elaborations) • 23 pages • 2024
-
- $10.89
- + learn more
The distance between the hanger and the centerline of an upright sprinkler may be no less than	3". The purpose is to prevent the hangar from becoming an obstruction when the sprinklers discharge 
Dry-pipe valves controlling systems with a capacity of more than _______ must be provided with an approved quick-opening device	500 gallons 
Air or nitrogen pressure in a dry-pipe system must be	maintained throughout the year 
In a dry pipe system, install an approved relief valve between the compres...
Get paid weekly? You can!
-
Pipefitter NCCER Test Exam Questions With 100% Verified Answers.
- Exam (elaborations) • 23 pages • 2024
-
- $11.49
- + learn more
©BRAINBARTER 2024/2025 
Pipefitter NCCER Test Exam Questions 
With 100% Verified Answers. 
Convert 1/4 to its decimal equivalent. 
A) .01 
B) .25 
C) 0.4 
D) 0.5 - answerB 
Piping that is field-routed to a pump must be supported 
A) Off the pump suction 
B) Diagonally 
C) Independently 
D) Off the pump discharge - answerC 
What is used when lighting a cutting torch ? 
A) Striker 
B) Cigarette lighter 
C) Match 
D) Any open flame - answerA 
Where is specific information needed to install piping ...
-
plumbing set 9| 679 Questions | With Complete Solutions
- Exam (elaborations) • 71 pages • 2023
-
Available in package deal
-
- $17.99
- + learn more
PVC pipe correct answer: schedule 40, schedule 80, and (DWV) 
 
CPVC correct answer: rated for 180°F at 100 (psi) 
 
ABS pipe correct answer: used for building drain, waste and vents 
 
Polybutylene (PB) pipe correct answer: flexible tubing used for coldwater building supply and underground 
sprinkler systems 
 
Polyethylene (PE) pipe correct answer: for industrial piping systems, as well as for buried 
gas and water pipelines. 
 
Polyproylene (PP) pipe correct answer: used for industrial...
-
AIC MOCK EXAM QUESTIONS AND ANSWERS GRADED A WITH COMPLETE SOLUTIONS 2024
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
What information is used to determine the required contact area of a reinforced concrete footing resting in soil? - Soil Bearing Capacity 
 
What is the following a definition of? 
"Reducing the duration of a project of a project usually by overlapping phases or activities that were originally planned to be done sequentially." - Fast- Tracking 
 
Which of the following terms refers to the complete process of obtaining materials? - Procurement 
 
Who is responsible for ensuring that all worker...
-
PIPING AND TUBING Questions and Answers Grade A+
- Exam (elaborations) • 8 pages • 2024
-
- $10.49
- + learn more
What is the difference between pipe and tubing? 
 Pipe is always named by its approximate inside diameter and 
schedule, or wall thickness. 
 Tubing is usually measured by its outside diameter because the outside 
diameter of tubing is accurate. 
What materials are used for piping and tubing in heating, air-conditioning, 
and refrigeration systems? 
 COPPER 
 IRON 
 STEEL 
 ALUMINUM 
 PVC 
 CPVC 
What materials are used for refrigerant piping? 
Master01 | October, 2024/2025 | Latest update 
1...
-
CWEA CSM GRADE 2 - PRACTICE TEST ACCURATE 100%
- Exam (elaborations) • 18 pages • 2024
-
- $15.99
- + learn more
In order to accurately estimate the flow of a sanitary sewer overflow (SSO) you must have: - ANSWER Spill start time, spill end time and spill rate 
 
Providing a plan and schedule to properly manage, operate and maintain all parts of the sanitary sewer system is the goal of a: - ANSWER A sewer system management plan (SSMP) 
 
What are the basics elements of a safety program? - ANSWER Safety policy, statement, safety training, accident investigation 
 
What factor must be considered when obtaini...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia