Tower crane questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Tower crane questions? On this page you'll find 240 study documents about Tower crane questions.

Page 4 out of 240 results

Sort by

NCCCO Tower Crane Questions and Answers with Complete Solution Already Graded A+
  • NCCCO Tower Crane Questions and Answers with Complete Solution Already Graded A+

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane Questions and Answers with Complete Solution Already Graded A+
    (0)
  • $11.39
  • + learn more
NCCCO Tower Crane Questions with 100% Correct Answers
  • NCCCO Tower Crane Questions with 100% Correct Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Splices in rall tracks shall have Correct Answer Smooth Joints Hydraulic systems should have their proper fluid level checked Correct Answer Daily If power fails during operations, the following shouldn't apply Correct Answer Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted Correct Answer Person responsible for lift Where should climbing ...
    (0)
  • $12.99
  • + learn more
Tower Crane Questions and Answers (A+ Paper)
  • Tower Crane Questions and Answers (A+ Paper)

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • Which of the following OSHA regulations govern suspended personnel platforms? Correct Answer OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is Correct Answer 15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of Correct Answer 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is Correct Answer 5 to 1 According to ASME B30.3 Load hoist rope...
    (0)
  • $12.99
  • + learn more
Tower Crane Exam Prep (2024 / 2025 Update) Questions and Verified Answers | 100% Correct
  • Tower Crane Exam Prep (2024 / 2025 Update) Questions and Verified Answers | 100% Correct

  • Exam (elaborations) • 38 pages • 2024
  • Available in package deal
  • Tower Crane Exam Prep (2024 / 2025 Update) Questions and Verified Answers | 100% Correct Q: What is axis of rotation? Answer: The vertical line about which a crane swings Q: The condition of a super structure of a Tower Crane necessary for climbing Answer: Needs to be Balance Q: What is ballast? Answer: The weight added to the crane base to create additional stability. It does not rotate when the crane swings. Q: What is base anchor bolts? Answer: A base that is bolted to the footing Q: How many...
    (0)
  • $7.99
  • + learn more
NCCCO Tower Crane Questions | 155 Questions with 100% Correct Answers | Verified | Latest Update | 13 Pages
  • NCCCO Tower Crane Questions | 155 Questions with 100% Correct Answers | Verified | Latest Update | 13 Pages

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane Questions | 155 Questions with 100% Correct Answers | Verified | Latest Update | 13 Pages Splices in rall tracks shall have - Answer️️ -Smooth Joints Hydraulic systems should have their proper fluid level checked - Answer️️ -Daily If power fails during operations, the following shouldn't apply - Answer️️ -Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at r...
    (0)
  • $12.49
  • + learn more
NCCCO Tower Crane Questions and answers latest update 2024
  • NCCCO Tower Crane Questions and answers latest update 2024

  • Exam (elaborations) • 7 pages • 2024
  • NCCCO Tower Crane Questions and answers latest update 2024
    (0)
  • $14.49
  • + learn more
NCCCO Tower Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A
  • NCCCO Tower Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A

  • Exam (elaborations) • 46 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A Q: According to OSHA when lifting personnel the cranes hook must be the type that Answer: Can be closed and locked Q: According to OSHA when working over water with a man basket are the people inside required to wear a belt/harness? Answer: No harness or belt required Q: According to ASME B30.3 when working near powerlines where should caution stickers be installed? Answer: Operator station and at the base...
    (0)
  • $7.99
  • + learn more
NCCCO TOWER CRANE EXAM 5 QUESTIONS AND ANSWERS | EACH CONTAINS 55 QUESTIONS AND ANSWERS | LATEST UPDATE 2024
  • NCCCO TOWER CRANE EXAM 5 QUESTIONS AND ANSWERS | EACH CONTAINS 55 QUESTIONS AND ANSWERS | LATEST UPDATE 2024

  • Exam (elaborations) • 42 pages • 2024
  • NCCCO TOWER CRANE EXAM 5 QUESTIONS AND ANSWERS | EACH CONTAINS 55 QUESTIONS AND ANSWERS | LATEST UPDATE 2024 NCCCO TOWER CRANE EXAM 5 QUESTIONS AND ANSWERS | EACH CONTAINS 55 QUESTIONS AND ANSWERS | LATEST UPDATE 2024 NCCCO TOWER CRANE EXAM 5 QUESTIONS AND ANSWERS | EACH CONTAINS 55 QUESTIONS AND ANSWERS | LATEST UPDATE 2024
    (1)
  • $20.49
  • + learn more
Study Guide for Tower Crane questions and answers
  • Study Guide for Tower Crane questions and answers

  • Exam (elaborations) • 12 pages • 2024
  • Study Guide for Tower Crane questions and answers
    (0)
  • $7.99
  • + learn more
NCCCO Tower Crane Questions | 155 Questions with 100% Correct Answers | Verified | Latest Update | 13 Pages
  • NCCCO Tower Crane Questions | 155 Questions with 100% Correct Answers | Verified | Latest Update | 13 Pages

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane Questions | 155 Questions with 100% Correct Answers | Verified | Latest Update | 13 Pages Splices in rall tracks shall have - Answer️️ -Smooth Joints Hydraulic systems should have their proper fluid level checked - Answer️️ -Daily If power fails during operations, the following shouldn't apply - Answer️️ -Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at r...
    (0)
  • $12.49
  • + learn more