Reactive power - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Reactive power? On this page you'll find 2084 study documents about Reactive power.
Page 4 out of 2.084 results
Sort by
-
Z-51 Written Exam Questions and Complete Solutions.
- Exam (elaborations) • 37 pages • 2024
-
- $13.49
- 1x sold
- + learn more
Z-51 Written Exam Questions and Complete Solutions 
 
In a steam turbine, what is the function of a Kingsbury thrust bearing? 
 
A) Maintain first stage steam pressure. 
B) Compensate for coupling misalignment. 
C) Adjust shaft torque at start up. 
D) Maintain axial positioning of the rotor shaft. - Answer: D) Maintain axial positioning of the rotor shaft. 
 
The ratio of actual pressure of water pressure in the atmosphere to the saturated pressure of given temperature is 
 
A) partial pressure....
-
Practice Test NERC Questions with correct answers
- Exam (elaborations) • 32 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? CORRECT ANSWER The phase angle will increase. When load is increased phase angle will increase. 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? CORRECT ANSWER 90 pf= mw/mva 
 
The high side of a delta-wye connection transformer i...
-
NERC RANDOM Questions AND ANSWERS| 100% CORRECT
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NERC RANDOM Questions AND ANSWERS| 100% CORRECT 
When current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
 
a) half as much 
b) does not change 
c) doubles 
d) four times greater Answer-d) four times greater 
 
What determines the size of insulators used on power lines? 
 
a) Current flow on the line 
b) Voltage level of the line 
c) Reactance of the line 
d) Operating Limit of the line Answer-b) Voltage level of the line 
 
Reactive power is needed to ...
-
PJM Generation Cert Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 46 pages • 2024
- Available in package deal
-
- $14.39
- + learn more
Actions in low voltage alert? 
: Review transmission & generation outages 
Request reactive reserve check 
Heavy load voltage schedule warning purpose is to have members prepare far max 
support of voltages on the? 
: Bulk Power System 
Manual load dump warning & reduction of Non-critical plant load issued when? 
: Primary reserve is less the the largest generating unit. 
Loss of transmission facility jeopardize reliability after all possible measures have been 
taken to increase reserves 
Hot...
-
TCI Seventh Edition Latest Update with Verified Solutions
- Exam (elaborations) • 34 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
TCI Seventh Edition Latest Update with 
 
Verified Solutions 
 
The TCI System helps Organizations Prevent Crises. De-escalate potential crises, Manage 
acute Physical behavior, Reduce potential and actual injury to children and staff, Teach children 
adaptive coping skills, Develop a learning organization. 
 
Developmental Relationships are characterized by attachment, reciprocity, progressive 
complexity, and balance of power. 
 
Theory of Change Identifies roles and tasks as well as desired p...
As you read this, a fellow student has made another $4.70
-
ISA Utility Specialist (Chapters 1-7) UPDATED Exam Questions and CORRECT Answers
- Exam (elaborations) • 45 pages • 2024
-
- $9.49
- + learn more
ISA Utility Specialist (Chapters 1-7) 
UPDATED Exam Questions and 
CORRECT Answers 
In the U.S., enforcement of safety work rules resides with: - CORRECT ANSWEROccupational Safety & Health Administration 
(OSHA) 
Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of 
__________ __________ __________. - CORRECT ANSWER- ensuring reliable service 
A comprehensive vegetation management program should be __________ rather than 
reactive, & based on prin...
-
Practice Test NERC Questions And Answers 2024
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Practice Test NERC Questions And Answers 2024 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending 
Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle 
difference will be? - ANSWER-The phase angle will increase. When load is increased phase angle will 
increase. 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - ANSWER- 
90 pf= mw/mva 
The high side ...
-
DEOMI Grp 2 Exam 2 Questions with All Correct Answers
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
DEOMI Grp 2 Exam 2 Questions with All Correct Answers 
Describe how power affects prejudice and discrimination - Answer- Power is at the core of discrimination---w/out power; discrimination is ineffective; with power discrimination maintains the dominance of one grp over the other 
 
Define Victim - Answer- --in the broad sense as persons who, individually/collectively, have suffered harm 
 
Define victim focus - Answer- --victim focus is reactive problem-solving approach, narrowly defines prob...
-
PJM Exam Questions and Answers 100% Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 100% Correct 
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO - Correct Answer ️️ -TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start 
(hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? - 
Correct Answer ️️ -20 MVA 
Minimum MVARs for an aggr...
-
Epri Practice test with 100% correct Answers
- Exam (elaborations) • 24 pages • 2024
-
- $13.49
- + learn more
Epri Practice test with 100% correct 
Answers 
If a generator is producing 500 MW and 200 Mvar, is the generator? 
A. Leading 
B. Lagging 
C. Underexcited 
D. Dropping - answerB. Lagging 
What is the IEEE device number for a differential relay? 
A. 87 
B. 86 
C. 67 
D. 50 - answerA. 87 
Can a synchronous machine have a negative torque angle? What does 
this mean? 
A. Yes / the machine is absorbing reactive power 
B. No / the machine is absorbing active power 
C. No / the machine is absorbing rea...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia