Nerc time limits - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nerc time limits? On this page you'll find 80 study documents about Nerc time limits.
Page 4 out of 80 results
Sort by
-
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+)
- Exam (elaborations) • 69 pages • 2024
-
- $17.49
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+) The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
...
-
NERC Standards with Complete Solution Rated A+
- Exam (elaborations) • 17 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
NERC Standards with Complete Solution Rated A+ 
 
How Many Active Standards are in BAL (Resource and Demand Balancing) - Answer There are 8 Active Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement 
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement 
BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Subject to Enforcem...
-
SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If 
Balancing Authority...
-
NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024
- Exam (elaborations) • 116 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024 
 
Auto-load - correct answer a feature on some generators that automatically moves the generator to a target load (mw) level. 
 
Automatic generation control (agc) - correct answer equipment that automatically adjusts generation in a balancing authority area from a central location to maintain the balancing authority's interchange schedule plus frequency bias. Agc may also accommodate automa...
-
PJM Generation Dispatcher Exam Practice - Questions and Answers
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
PJM Generation Dispatcher Exam Practice - Questions and Answers An EXCITER on a traditional generator does what? Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are generator _________________. Limits When synchronizing to the interconnection, what needs to be synchronized? Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? 10A or greater is measured by special equipment at Mis...
As you read this, a fellow student has made another $4.70
-
NERC Prep Test 101 | 200 Questions with Correct Answers
- Exam (elaborations) • 36 pages • 2023
-
Available in package deal
-
- $18.49
- + learn more
NERC Prep Test 101 | 200 Questions with Correct Answers 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system 2. When system conditions are such that emergency procedures are expected to be implemented, which of t...
-
NERC PREP TEST 101 Questions with Correct Solution| Rated A+
- Exam (elaborations) • 49 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of the ...
-
PJM Generation Dispatcher Exam Practice Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
PJM Generation Dispatcher Exam 
Practice Questions and Answers 
An EXCITER on a traditional generator does what? - Correct Answer ️️ -Voltage 
regulation (AVR) if you change the excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct 
Answer ️️ -Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Correct 
Answer ️️ -Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) procedu...
-
Practice Test NERC Questions with Correct Solutions| Rated A+
- Exam (elaborations) • 27 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - The phase angle will increase. When load is increased phase angle will increase. 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - 90 pf= mw/mva 
 
The high side of a delta-wye connection transformer is connected to a pow...
-
NERC Standards quiz answered
- Exam (elaborations) • 15 pages • 2023
-
- $5.99
- + learn more
NERC Standards| 120 questions| with complete solutions 
How Many Active Standards are in BAL (Resource and Demand Balancing) - CORRECT ANSWER There are 8 Active Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement 
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement 
BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Sub...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia