Nerc time limits - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc time limits? On this page you'll find 80 study documents about Nerc time limits.

Page 4 out of 80 results

Sort by

NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+)
  • NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+)

  • Exam (elaborations) • 69 pages • 2024
  • NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+) The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. ...
    (0)
  • $17.49
  • + learn more
NERC Standards with Complete Solution Rated A+
  • NERC Standards with Complete Solution Rated A+

  • Exam (elaborations) • 17 pages • 2023
  • NERC Standards with Complete Solution Rated A+ How Many Active Standards are in BAL (Resource and Demand Balancing) - Answer There are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Subject to Enforcem...
    (0)
  • $10.49
  • + learn more
SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024
  • SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024

  • Exam (elaborations) • 69 pages • 2023
  • Available in package deal
  • Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency, and all __________. A) Tie lines readings B) Generators output C) Scheduled frequency indications SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST GRADED A+ D) Transformer load - A) Tie lines readings Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority...
    (0)
  • $16.49
  • + learn more
NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024
  • NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024

  • Exam (elaborations) • 116 pages • 2024
  • NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024 Auto-load - correct answer a feature on some generators that automatically moves the generator to a target load (mw) level. Automatic generation control (agc) - correct answer equipment that automatically adjusts generation in a balancing authority area from a central location to maintain the balancing authority's interchange schedule plus frequency bias. Agc may also accommodate automa...
    (0)
  • $11.99
  • + learn more
PJM Generation Dispatcher Exam Practice - Questions and Answers
  • PJM Generation Dispatcher Exam Practice - Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • PJM Generation Dispatcher Exam Practice - Questions and Answers An EXCITER on a traditional generator does what? Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are generator _________________. Limits When synchronizing to the interconnection, what needs to be synchronized? Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? 10A or greater is measured by special equipment at Mis...
    (0)
  • $13.49
  • + learn more
NERC Prep Test 101 | 200 Questions with Correct Answers
  • NERC Prep Test 101 | 200 Questions with Correct Answers

  • Exam (elaborations) • 36 pages • 2023
  • NERC Prep Test 101 | 200 Questions with Correct Answers 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system 2. When system conditions are such that emergency procedures are expected to be implemented, which of t...
    (0)
  • $18.49
  • + learn more
NERC PREP TEST 101 Questions with Correct Solution| Rated A+
  • NERC PREP TEST 101 Questions with Correct Solution| Rated A+

  • Exam (elaborations) • 49 pages • 2023
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the ...
    (0)
  • $11.99
  • + learn more
PJM Generation Dispatcher Exam Practice Questions and Answers
  • PJM Generation Dispatcher Exam Practice Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • PJM Generation Dispatcher Exam Practice Questions and Answers An EXCITER on a traditional generator does what? - Correct Answer ️️ -Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct Answer ️️ -Limits When synchronizing to the interconnection, what needs to be synchronized? - Correct Answer ️️ -Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedu...
    (0)
  • $11.49
  • + learn more
Practice Test NERC Questions with Correct Solutions| Rated A+
  • Practice Test NERC Questions with Correct Solutions| Rated A+

  • Exam (elaborations) • 27 pages • 2023
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a pow...
    (0)
  • $11.99
  • + learn more
NERC Standards quiz answered
  • NERC Standards quiz answered

  • Exam (elaborations) • 15 pages • 2023
  • NERC Standards| 120 questions| with complete solutions How Many Active Standards are in BAL (Resource and Demand Balancing) - CORRECT ANSWER There are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Sub...
    (0)
  • $5.99
  • + learn more