Nerc exam to questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc exam to questions? On this page you'll find 160 study documents about Nerc exam to questions.

Page 4 out of 160 results

Sort by

PJM Generation Dispatcher Exam Practice Questions with Verified  Answers
  • PJM Generation Dispatcher Exam Practice Questions with Verified Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • PJM Generation Dispatcher Exam Practice Questions with Verified Answers An EXCITER on a traditional generator does what? Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. Limits When synchronizing to the interconnection, what needs to be synchronized? Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? 10A or greater is measured by ...
    (0)
  • $9.99
  • + learn more
NERC RC Exam| 100 Questions| accurate Answers| Verified
  • NERC RC Exam| 100 Questions| accurate Answers| Verified

  • Exam (elaborations) • 7 pages • 2024
  • NERC RC Exam| 100 Questions| accurate Answers| Verified Common standard time period for station battery to handle outage of AC power to chargers - ANSWER 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - ANSWER 2 hours Transition period to backup control facility (fully functioning) - ANSWER 2 hours Annual testing of backup control facility must prove to be functional for this long - ANSWER 2 hours Every 2 years TO/TOP/D...
    (0)
  • $10.99
  • + learn more
NERC Certification- After Class Exam Questions And Answers
  • NERC Certification- After Class Exam Questions And Answers

  • Exam (elaborations) • 25 pages • 2024
  • NERC Certification- After Class Exam Questions And Answers 1 / 25 1. Balancing Authority A is importing MW and has a b . The Balancing tie-line flowing into them when the meter fails to zero. Authority's generWhich of the following statements is true? a .The Balancing Authority's frequency will drop b .The Balancing Authority's generators on AGC will decrease output c.The Balancing Authority's frequency will increase d.The Balancing Authority's ACE reading will decrease 2. Balanc...
    (0)
  • $15.99
  • + learn more
NERC Certification Exam | latest 2023/24 with full solution
  • NERC Certification Exam | latest 2023/24 with full solution

  • Exam (elaborations) • 15 pages • 2023
  • NERC Certification Exam | latest 2023/24 with full solution True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) Tr...
    (0)
  • $9.99
  • + learn more
EPRI Terms & Definitions Exam Questions & Answers 2023/2024
  • EPRI Terms & Definitions Exam Questions & Answers 2023/2024

  • Exam (elaborations) • 16 pages • 2023
  • EPRI Terms & Definitions Exam Questions & Answers 2023/2024 OFF-PEAK - ANSWER-Those hours or other PERIODs defined by NAESB business practices, contract, AGREEMENTs, or guides as PERIODs of lower electrical DEMAND. OHM'S LAW - ANSWER-A basic electrical law that relates the VOLTAGE (V), CURRENT (I), and IMPEDANCE (Z). Ohm's law is commonly stated as:V = I × Z ON-PEAK - ANSWER-Those hours or other PERIODs defined by NAESB business practices, contract, AGREEMENTs, or guides as PERIODs...
    (0)
  • $9.49
  • + learn more
NERC Certification Exam True/False Questions and Correct Solutions
  • NERC Certification Exam True/False Questions and Correct Solutions

  • Exam (elaborations) • 23 pages • 2023
  • According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - B) False True/False The NERC Functional Mode...
    (0)
  • $7.99
  • + learn more
NERC Prep Exam Questions and Answers Latest Updated 2023-2024 Graded A+
  • NERC Prep Exam Questions and Answers Latest Updated 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • NERC Prep Exam Questions and Answers Latest Updated Graded A+. What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE that the transmission path is out of service c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency calculations, and all ________ must be metered. a. Communications b. Transform...
    (0)
  • $14.99
  • + learn more
NERC Exam Final Assessment Questions and Correct Answers Graded A+
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+

  • Exam (elaborations) • 79 pages • 2023
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+ When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% -Answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. G...
    (0)
  • $9.49
  • + learn more
NERC RC Exam Questions and Answers Latest Updated 2024 (Graded A+)
  • NERC RC Exam Questions and Answers Latest Updated 2024 (Graded A+)

  • Exam (elaborations) • 15 pages • 2024
  • NERC RC Exam Questions and Answers Latest Updated 2024 (Graded A+) Common standard time period for station battery to handle outage of AC power to chargers 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 2 hours Transition period to backup control facility (fully functioning) 2 hours Annual testing of backup control facility must prove to be functional for this long 2 hours Every 2 years TO/TOP/DSP must provide how many hours of ...
    (0)
  • $12.49
  • + learn more
NERC RC Exam Complete Study Questions And Answers With Verified Solutions
  • NERC RC Exam Complete Study Questions And Answers With Verified Solutions

  • Exam (elaborations) • 7 pages • 2023
  • NERC RC Exam Complete Study Questions And Answers With Verified Solutions Common standard time period for station battery to handle outage of AC power to chargers 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 2 hours Transition period to backup control facility (fully functioning) 2 hours Annual testing of backup control facility must prove to be functional for this long 2 hours
    (0)
  • $11.49
  • + learn more