Nccer module 6 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccer module 6? On this page you'll find 254 study documents about Nccer module 6.

Page 4 out of 254 results

Sort by

NCCER module 6 (intro to basic rigging) with Complete Solutions
  • NCCER module 6 (intro to basic rigging) with Complete Solutions

  • Exam (elaborations) • 1 pages • 2024
  • NCCER module 6 (intro to basic rigging) with Complete Solutions
    (0)
  • $7.99
  • + learn more
Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024
  • Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024 Most construction drawings today are​ hand-drawn by drafters. - Correct Answer False The border is a clear area of about​ _____ inch(es) around the edge of the drawing. - Correct Answer ½ Abbreviations used in drawings are always written in​ ____. - Correct Answer capital letters A keynote is used to identify a specific object in a drawing. - Correct Answer True A grid divides t...
    (0)
  • $9.48
  • + learn more
NCCER module 6 ( intro to basic rigging Exam Questions And Answers
  • NCCER module 6 ( intro to basic rigging Exam Questions And Answers

  • Exam (elaborations) • 1 pages • 2024
  • Available in package deal
  • NCCER module 6 ( intro to basic rigging Exam Questions And Answers the max load weight that a sling is designed to carry is the? - ANS rated capacity most alloy steel chain slings can be used in Temps up to? - ANS 500°F (260°c) when a tattle tail has been pulled into the jacket of a synthetic sling, the sling most likely has been? - ANS overloaded if a wire rope sling appears to be damaged the decision to keep it in service must be made by a? - ANS competent person ...
    (0)
  • $7.99
  • + learn more
NCCER Module 6 -Device Boxes, Pull and Junction Boxes Questions and Answers 2024
  • NCCER Module 6 -Device Boxes, Pull and Junction Boxes Questions and Answers 2024

  • Exam (elaborations) • 3 pages • 2024
  • NCCER Module 6 -Device Boxes, Pull and Junction Boxes
    (0)
  • $12.99
  • + learn more
Carpentry Wall Systems; NCCER Module 6 Exam/25 Questions with Answers
  • Carpentry Wall Systems; NCCER Module 6 Exam/25 Questions with Answers

  • Exam (elaborations) • 2 pages • 2024
  • Carpentry Wall Systems; NCCER Module 6 Exam/25 Questions with Answers
    (0)
  • $7.49
  • + learn more
NCCER Module 6 Exam Questions With Verified Answers
  • NCCER Module 6 Exam Questions With Verified Answers

  • Exam (elaborations) • 1 pages • 2024
  • Available in package deal
  • NCCER Module 6 Exam Questions With Verified Answers The max load weight that a sling is designed to carry is the? - answerrated capacity most alloy steel chain slings can be used in Temps up to? - answer500°F (260°c) when a tattle tail has been pulled into the jacket of a synthetic sling, the sling most likely has been? - answeroverloaded if a wire rope sling appears to be damaged the decision to keep it in service must be made by a? - answercompetent person because of the need for inc...
    (0)
  • $7.99
  • + learn more
NCCER Module 6 Exam Questions With Verified Answers
  • NCCER Module 6 Exam Questions With Verified Answers

  • Exam (elaborations) • 1 pages • 2024
  • Available in package deal
  • NCCER Module 6 Exam Questions With Verified Answers The max load weight that a sling is designed to carry is the? - answerrated capacity most alloy steel chain slings can be used in Temps up to? - answer500°F (260°c) when a tattle tail has been pulled into the jacket of a synthetic sling, the sling most likely has been? - answeroverloaded if a wire rope sling appears to be damaged the decision to keep it in service must be made by a? - answercompetent person because of the need for inc...
    (0)
  • $8.49
  • + learn more
NCCER Module 6 -Device Boxes, Pull and  Junction Boxes UPDATED Exam Questions  and CORRECT Answers
  • NCCER Module 6 -Device Boxes, Pull and Junction Boxes UPDATED Exam Questions and CORRECT Answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • NCCER Module 6 -Device Boxes, Pull and Junction Boxes UPDATED Exam Questions and CORRECT Answers The maximum weight allowed by the NEC when celling fans are mounted directly to an approved, unmarked outlet box is _______ pounds. - Correct Answer- 35 Square metal boxes are available in sizes of 4" and____. - Correct Answer- 4 and eleventh/sixteenths" (4 11/16) A box installed under a roofed open porch is considered a ____. - Correct Answer- damp location
    (0)
  • $7.99
  • + learn more
NCCER Module 6 into to Basic rigging  2023 ALL50+questions with correct  answers AGRADE
  • NCCER Module 6 into to Basic rigging 2023 ALL50+questions with correct answers AGRADE

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • NCCER Module 6 into to Basic rigging 2023 ALL50+questions with correct answers AGRADE During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? - CORRECT ANSWER-(Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. - C
    (0)
  • $17.99
  • + learn more
NCCER Module 6 Exam Questions With Verified Answers
  • NCCER Module 6 Exam Questions With Verified Answers

  • Exam (elaborations) • 1 pages • 2024
  • NCCER Module 6 Exam Questions With Verified Answers The maximum load weight that a sling is designed to carry is the _______. Rated capacity Most alloy steel chain slings can be used in temperatures up to ___________. 500 degrees F (260 degrees C) When a tattle-tail has been pulled into the jacket of a synthetic sling, the sling most likely has been _______________. Overloaded If a wire rope sling appears to be damaged, the decision to keep it in service must be made by a ____...
    (0)
  • $10.19
  • + learn more