Nccco test 4 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco test 4? On this page you'll find 40 study documents about Nccco test 4.

Page 4 out of 40 results

Sort by

NCCCO Tower Crane 2024 Latest and Verified
  • NCCCO Tower Crane 2024 Latest and Verified

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane 2024 Latest and Verified ASME - CORRECT ANSWER-American Society of Mechanical Engineers ANSI - CORRECT ANSWER-American National Standards Institute ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.30 - CORRECT ANSWER-Ropes OSHA - CORRECT ANSWER-Occupational Safety and Health Administration OSHA 1926.1400cc - CORRECT ANSWER-Cranes in Construction OSHA 1926.1435 - CORRECT ANSWER-Tower Cranes A/D Director - CORRECT ANSWER-Assembly Disassembly director Must - CORRECT ANS...
    (0)
  • $11.99
  • + learn more
CCO Test 4 Crane Exam Questions and Answers
  • CCO Test 4 Crane Exam Questions and Answers

  • Exam (elaborations) • 10 pages • 2024
  • Jib offset is the jib angle to the: boom All hazards and problems that are found on the worksite should be identified: at the preoperational worksite inspection which of the following OSHA regulations govern suspended personal platform OSHA 1926.1431 3 multiple choice options according to OSHA 1926.1408 the prohibited zone for power lines that are 60 kv, is 15 ft what percentage of the gross capacity is used when lifting with more than one crane 75% you are required to pass a physical...
    (0)
  • $8.00
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom correct answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts ...
    (0)
  • $14.49
  • + learn more
NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update
  • NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update What is the max included angle for a shackle? - Answer ️️ -120 Degrees Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - Answer ️️ -80 % The center of gravity location of a load may _________of the load - Answer ️️ -Not be located on the actual physical body A sling that is rigged at 30 degrees to the load will be subjected to an increase slin...
    (0)
  • $10.49
  • + learn more
NCCCO MOBILE CRANE EXAM 99 QUESTIONS AND   VERIKFIED CORRECT ANSWERS ANSWERS GUARANTEED PASS
  • NCCCO MOBILE CRANE EXAM 99 QUESTIONS AND VERIKFIED CORRECT ANSWERS ANSWERS GUARANTEED PASS

  • Exam (elaborations) • 12 pages • 2024
  • NCCCO MOBILE CRANE EXAM 99 QUESTIONS AND VERIKFIED CORRECT ANSWERS ANSWERS GUARANTEED PASS Under which circumstance does OSHA permits hoisting of personnel by crane? As long as the prevailing wind speed is less than 35 mph As long as there is no less hazardous or practicable way As long as all personnel have CPR training As long as no aerial work platform is available - b. Unless the manufacturer states otherwise, what crane capacity chart is appropriate when a crane is se...
    (1)
  • $28.49
  • + learn more
NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update
  • NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update

  • Exam (elaborations) • 3 pages • 2024
  • NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update What is the max included angle for a shackle? - Answer ️️ -120 Degrees Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - Answer ️️ -80 % The center of gravity location of a load may _________of the load - Answer ️️ -Not be located on the actual physical body A sling that is rigged at 30 degrees to the load will be subjected to an increase slin...
    (0)
  • $10.49
  • + learn more
Tower Cranes NCCCO Study Guide Final  Exam with Verified Solutions
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions T or F Very few areas in either the US or Canada require certification to operate a tower crane - CORRECT ANSWER-false T or F Self erecting tower cranes are easier to erect than a conventional tower crane, but erection time takes longer - CORRECT ANSWER-false How does the crane rotate with a fixed tower base? - CORRECT ANSWER-slewing ring beneath the jib T or F A mono type of tower can be either fixed or slewing - ...
    (0)
  • $10.49
  • + learn more
Nccco Core + Specialty Test Prep Question and Answer 100% Correct| latest update
  • Nccco Core + Specialty Test Prep Question and Answer 100% Correct| latest update

  • Exam (elaborations) • 17 pages • 2024
  • Nccco Core + Specialty Test Prep Question and Answer 100% Correct| latest update ASME B30.5 - Mobile and Locomotive cranes, all types ASME B30.3 - Tower Cranes ASME B30.23 - Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - 2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor personel lifts 10-1 ASME B30.9 - Slings
    (0)
  • $10.49
  • + learn more