Mw over generating - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Mw over generating? On this page you'll find 76 study documents about Mw over generating.

Page 4 out of 76 results

Sort by

NERC Questions with 100% Complete Solutions| Graded to Pass
  • NERC Questions with 100% Complete Solutions| Graded to Pass

  • Exam (elaborations) • 11 pages • 2023
  • Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? Temperature and length MWs and MVARs Voltage and current Resistance and Impedance - Voltage and current What is the main cause for having low voltage on the Transmission and Distribution system? Over generation in t...
    (0)
  • $7.99
  • + learn more
PJM Practice questions With Explanation of Answers.
  • PJM Practice questions With Explanation of Answers.

  • Exam (elaborations) • 20 pages • 2024
  • A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - correct answer c. 4 hours The following would be considered non-critical plant load (Select 2) - correct answer A. Office Area Air Conditioners C. Lighting During a Cold Weather Alert, PJM will take which of the actions - correct answer D. Assume an unavailability rate for schedule generation When PJM issues a High System Voltage Message, the GO should have its units operate at: - correct an...
    (0)
  • $13.99
  • + learn more
NERC book quiz questions | updated 2024
  • NERC book quiz questions | updated 2024

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • NERC book quiz questions | updated 2024 You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minu...
    (0)
  • $9.49
  • + learn more
NERC SOS Pre-Assessment Questions  and answers, rated A+/ VERIFIED/[LATEST EXAM UPDATES]
  • NERC SOS Pre-Assessment Questions and answers, rated A+/ VERIFIED/[LATEST EXAM UPDATES]

  • Exam (elaborations) • 14 pages • 2024
  • NERC SOS Pre-Assessment Questions and answers, rated A+/ VERIFIED/ What are three primary AGC control models? - Tie-Line Bias, Constant Frequency, Constant Net Interchange When a balancing Authority's ACE is zero, what is true? - The BA load-interchange-generation balancing while supporting Interconnection Frequency In a 3-phase AC generator... - Each phase is physically offset by 120 degrees Inductance is a property of an electric circuit that opposes the change in ___ - current Wha...
    (0)
  • $9.49
  • + learn more
NERC Reliability Coordinator Exam Vocabulary 2022 Questions with Correct Solutions
  • NERC Reliability Coordinator Exam Vocabulary 2022 Questions with Correct Solutions

  • Exam (elaborations) • 91 pages • 2023
  • Accelerating Power - In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. Accumulated Inadvertent - The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION or absorbed from the I...
    (0)
  • $14.99
  • + learn more
NERC RC Exam (Latest Update 2024) Questions and Answers
  • NERC RC Exam (Latest Update 2024) Questions and Answers

  • Exam (elaborations) • 17 pages • 2023
  • Common standard time period for station battery to handle outage of AC power to chargers 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 2 hours Transition period to backup control facility (fully functioning) 2 hours Annual testing of backup control facility must prove to be functional for this long 2 hours Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching pe...
    (0)
  • $10.99
  • + learn more
NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+)
  • NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+)

  • Exam (elaborations) • 22 pages • 2024
  • NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+) What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing area...
    (0)
  • $17.49
  • + learn more
NERC QUESTION SOS WITH 100% CORRECT ANSWERS 2023.
  • NERC QUESTION SOS WITH 100% CORRECT ANSWERS 2023.

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Accelerating Power In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. Accumulated Inadvertent The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION or absorbed from the INTER...
    (0)
  • $13.99
  • + learn more
NERC book quiz questions answered with complete solution
  • NERC book quiz questions answered with complete solution

  • Exam (elaborations) • 14 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - correct answer -4MW Net actual interchange minus Net scheduled interchange is what? - correct answer Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after ...
    (0)
  • $3.99
  • + learn more
 NERC book Quiz Questions and Answers 2023-2024 Graded A
  • NERC book Quiz Questions and Answers 2023-2024 Graded A

  • Exam (elaborations) • 13 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
    (0)
  • $11.49
  • + learn more