NERC Questions with 100% Complete Solutions| Graded to Pass
- Exam (elaborations) • 11 pages • 2023
-
Available in package deal
-
- $7.99
- + learn more
Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? 
 
Temperature and length 
MWs and MVARs 
Voltage and current 
Resistance and Impedance - Voltage and current 
 
What is the main cause for having low voltage on the Transmission and Distribution system? 
 
Over generation in t...
-
PJM Practice questions With Explanation of Answers.
- Exam (elaborations) • 20 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - correct answer c. 4 hours 
 
The following would be considered non-critical plant load (Select 2) - correct answer A. Office Area Air Conditioners 
C. Lighting 
 
During a Cold Weather Alert, PJM will take which of the actions - correct answer D. Assume an unavailability rate for schedule generation 
 
When PJM issues a High System Voltage Message, the GO should have its units operate at: - correct an...
-
NERC book quiz questions | updated 2024
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $9.49
- + learn more
NERC book quiz questions | updated 2024 
 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW 
Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange 
Suppose your interconnection operators at 59.97 Hz from one minu...
-
NERC SOS Pre-Assessment Questions and answers, rated A+/ VERIFIED/[LATEST EXAM UPDATES]
- Exam (elaborations) • 14 pages • 2024
-
- $9.49
- + learn more
NERC SOS Pre-Assessment Questions 
and answers, rated A+/ VERIFIED/ 
What are three primary AGC control models? - Tie-Line Bias, Constant Frequency, Constant Net 
Interchange 
When a balancing Authority's ACE is zero, what is true? - The BA load-interchange-generation 
balancing while supporting Interconnection Frequency 
In a 3-phase AC generator... - Each phase is physically offset by 120 degrees 
Inductance is a property of an electric circuit that opposes the change in ___ - current 
Wha...
-
NERC Reliability Coordinator Exam Vocabulary 2022 Questions with Correct Solutions
- Exam (elaborations) • 91 pages • 2023
-
Available in package deal
-
- $14.99
- + learn more
Accelerating Power - In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
 
Accumulated Inadvertent - The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION or absorbed from the I...
Want to regain your expenses?
-
NERC RC Exam (Latest Update 2024) Questions and Answers
- Exam (elaborations) • 17 pages • 2023
-
Available in package deal
-
- $10.99
- + learn more
Common standard time period for station battery to handle outage of AC power to chargers 
8-12 hours 
 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 
2 hours 
 
 
Transition period to backup control facility (fully functioning) 
2 hours 
 
 
Annual testing of backup control facility must prove to be functional for this long 
2 hours 
 
 
Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching pe...
-
NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+)
- Exam (elaborations) • 22 pages • 2024
-
Available in package deal
-
- $17.49
- + learn more
NERC Exam Questions With 100% Correct Answers Latest Updated 2024 (Graded A+) What group can approve a change in the 
Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working Group 
c. Check targets and equipment - What is the first thing an operator should do after 
a relay operation? 
a. Check power system stabilizers 
b. Notify adjacent Transmission and Balancing area...
-
NERC QUESTION SOS WITH 100% CORRECT ANSWERS 2023.
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $13.99
- + learn more
Accelerating Power 
In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
 
 
 
Accumulated Inadvertent 
The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION or absorbed from the INTER...
-
NERC book quiz questions answered with complete solution
- Exam (elaborations) • 14 pages • 2023
-
- $3.99
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a 
frequency of 60.02 due to a large loss of load in the contingent BA. If your 
generator governor control systems responded to the frequency deviation 
approximately how much of a generation change would you BA experience? - 
correct answer -4MW 
Net actual interchange minus Net scheduled interchange is what? - correct 
answer Inadvertent interchange 
Suppose your interconnection operators at 59.97 Hz from one minute after 
...
-
NERC book Quiz Questions and Answers 2023-2024 Graded A
- Exam (elaborations) • 13 pages • 2023
-
- $11.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...