Lssgb exam questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Lssgb exam questions? On this page you'll find 64 study documents about Lssgb exam questions.

Page 4 out of 64 results

Sort by

LSSGB Exam | Questions with Correct Answers| Rated A+
  • LSSGB Exam | Questions with Correct Answers| Rated A+

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Lean is a collection of tools and methodologies for minimizing process variation. - False Six-Sigma emphasizes quality and consistency. - True The basic philosophy behind Lean is to deliver near perfect outcomes. - False This is the basic philosophy of Six-Sigma not Lean. The term Lean is used interchangeably with Six-Sigma. - False
    (0)
  • $12.74
  • + learn more
LSSGB Test 1 Exam Questions And Answers 100% Verified
  • LSSGB Test 1 Exam Questions And Answers 100% Verified

  • Exam (elaborations) • 4 pages • 2024
  • LSSGB Test 1 Exam Questions And Answers 100% Verified Increasing the performance in a Six Sigma organization from 3 sigma to 4 sigma would reduce the defects per million opportunities by a factor of... - answer10 (rounded). The 4 sigma defect rate is 6210 ppm and the 3 sigma defect rate is 66807 ppm or a ratio of 1:10.76. What is the inference of "Process is in control" according to Walter Shewhart? - answerProcess has chance causes - The only time the process is said to be in control is...
    (0)
  • $10.49
  • + learn more
LSSGB - Improve Phase Exam Questions And Answers (Updated And Verified)
  • LSSGB - Improve Phase Exam Questions And Answers (Updated And Verified)

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • LSSGB - Improve Phase Exam Questions And Answers (Updated And Verified) Which of the following focuses on preventing errors from happening in the first place? - answerA Poka-yoke Upon considering his solution, a Green Belt realized it was turning into a large and complex effort. Which of the following could make it more manageable? - answerA Multi-Phased Implementation Before and after photos are most commonly applied when using which of the following tools? - answer5S Which of the foll...
    (0)
  • $10.49
  • + learn more
LSSGB - Control Phase Exam Questions And Answers 100% Verified
  • LSSGB - Control Phase Exam Questions And Answers 100% Verified

  • Exam (elaborations) • 4 pages • 2024
  • LSSGB - Control Phase Exam Questions And Answers 100% Verified Steps of the Control Phase - answer1. Create Monitoring Plans 2. Develop Response Plans 3. Document the Project 4. Pursue Perfection 1. Ensure the process owner is involved 2. Develop a Monitoring Plan 3. Create Control Charts 4. Develop a Response Plan 5. Document the Project Purpose of the Control Phase - answerCreate systems and processes to maintain and sustain the improvement and pave the way for continued improvemen...
    (0)
  • $10.49
  • + learn more
LSSGB Test 1 Exam Questions And Answers 100% Verified
  • LSSGB Test 1 Exam Questions And Answers 100% Verified

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • LSSGB Test 1 Exam Questions And Answers 100% Verified Increasing the performance in a Six Sigma organization from 3 sigma to 4 sigma would reduce the defects per million opportunities by a factor of... - answer10 (rounded). The 4 sigma defect rate is 6210 ppm and the 3 sigma defect rate is 66807 ppm or a ratio of 1:10.76. What is the inference of "Process is in control" according to Walter Shewhart? - answerProcess has chance causes - The only time the process is said to be in control is...
    (0)
  • $10.49
  • + learn more
LSSGB - Measure Phase Test Exam Questions With Verified Answers
  • LSSGB - Measure Phase Test Exam Questions With Verified Answers

  • Exam (elaborations) • 2 pages • 2024
  • LSSGB - Measure Phase Test Exam Questions With Verified Answers What is a good definition of the measure of hotel check-in time? - answerThe time in minutes from the moment the customer arrives at the desk to the moment they receive their key NEXT QUESTION Which of the following strategies might lead to a biased sample? - answer Which of the following is a continuous measure? - answerThe number of minutes it takes to unload a truck Which of the following statements is true if the Takt Ti...
    (0)
  • $10.49
  • + learn more
LSSGB Test 1 Exam Questions And Answers 100% Verified
  • LSSGB Test 1 Exam Questions And Answers 100% Verified

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • LSSGB Test 1 Exam Questions And Answers 100% Verified Increasing the performance in a Six Sigma organization from 3 sigma to 4 sigma would reduce the defects per million opportunities by a factor of... - answer10 (rounded). The 4 sigma defect rate is 6210 ppm and the 3 sigma defect rate is 66807 ppm or a ratio of 1:10.76. What is the inference of "Process is in control" according to Walter Shewhart? - answerProcess has chance causes - The only time the process is said to be in control is...
    (0)
  • $10.49
  • + learn more
Lean Six Sigma Green Belt (LSSGB) Exam 2024/2025  Questions With Completed Solutions.
  • Lean Six Sigma Green Belt (LSSGB) Exam 2024/2025 Questions With Completed Solutions.

  • Exam (elaborations) • 6 pages • 2024
  • Lean Six Sigma Green Belt (LSSGB) Exam 2024/2025 Questions With Completed Solutions.
    (0)
  • $9.99
  • + learn more
LSSGB EXAM Study Guide Questions with Correct Answers
  • LSSGB EXAM Study Guide Questions with Correct Answers

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Alternative Hypothesis (Ha) - The "difference" hypothesis, aka greater than, less than, or not equal to the normal. Null Hypothesis (Ho) - The hypothesis of "no effect" or "no difference" from normal. Associative Brainstorming - Generating rapid-fire ideas based on immediate association with other ideas. Specific Aim Statement - Statement outlining the intent of a PI Activity as a measurable, time-bound objective for improving an input that is contributing to our problem. Expectancy...
    (0)
  • $12.74
  • + learn more
IASSC LSSGB EXAM | 100 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 39 Pages
  • IASSC LSSGB EXAM | 100 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 39 Pages

  • Exam (elaborations) • 39 pages • 2023
  • If the chance that any one of five telephone lines is busy at any instant is 0.01, then what is the probability that all the lines are busy? A. (0.01)^4 B. (0.01)^5 C. (0.01)^6 D. (0.01)^10 - B. (0.01)^5 N = 5, p = 0.01, x = 5 Apply Standard formula for Binomial Distribution. Thus, option b is the correct answer. Who should complete the control phase after the successful completion and implementation of the first four phases of DMAIC? A. The green belt alone; the project has been succe...
    (0)
  • $20.49
  • + learn more