Load charts - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Load charts? On this page you'll find 616 study documents about Load charts.
Page 4 out of 616 results
Sort by
-
TET NCCCO General 200-300.
- Exam (elaborations) • 27 pages • 2024
-
- $16.49
- + learn more
What could happen when the boom sections on an individually controlled telescopic section are not extended evenly? 
 
a) The longer sections could be overloaded. 
b) The capacity of the crane is increased. 
c) The shorter sections could be overloaded. 
d) It will not make a difference. 
a) The longer sections could be overloaded. 
 
 
 
While performing the shift inspection, you find a hoist wire rope with a kink in it, what would you do? 
 
a) Document it on the shift inspection. 
b) Stop opera...
-
Dynatrace Associate Certification Exam Questions with Correct Answers 2023 graded A+
- Exam (elaborations) • 10 pages • 2023
-
- $13.99
- 1x sold
- + learn more
Dynatrace Associate Certification Exam Questions with Correct Answers 2023 
 
 
How long does it take for automatic baselines to be available? - Answer - The time its takes for automatic baselines to be available varies and depends on several factors such as the complexity of the data, size of the model and the computing resources available. 
Typically it could take everywhere from a few hours to a few days for the automatic baselines to be generated 
 
How is user session duration calculated? -...
-
NCCCO CORE QUESTIONS AND ANSWERS
- Exam (elaborations) • 15 pages • 2023
-
- $12.99
- + learn more
The term "Superstructure or Upper works" refers to the area of the crane: 
Above the swing circle 
 
 
A crane must be level within _______% for the load chart ratings to be valid? 
1% 
 
 
On what principle is crane stability based? 
Leverage 
 
 
What would be the effect of moving the tipping axis closer to the cranes center of gravity? 
Reduced stability 
 
 
Which of the following matches the appropriate load chart to a particular crane? 
Serial number 
 
 
A durable rating chart with legi...
-
OSHA 30 Questions and Answers | New One | Grade A+
- Exam (elaborations) • 44 pages • 2024
- Available in package deal
-
- $14.79
- + learn more
Those who work on a crane or near crane operations must be trained. Which of the following 
is true for this training? 
Ans: D. All of the above 
Certain inspections of crane equipment may be made by a(n) ___________ person; however, 
crane inspections are typically required to be made by a(n) __________ person. 
Ans: Competent, qualified 
After safety-related modifications have been made to crane equipment, the equipment must 
be inspected by __________ prior to use. 
Ans: A qualified person...
-
2A3X7B Ssgt WAPS study Gude 2024 Questions and Answers A+ Grade
- Exam (elaborations) • 24 pages • 2024
-
- $15.49
- + learn more
2A3X7B Ssgt WAPS study Gude 2024 
Questions and Answers A+ Grade 
An informal term for manning requirements not validated by higher headquarters, but 
deemed important to the mission by org. leadership. - CORRECT ANSWER-The term 
Out-of-hide means? 
Air Force Tactics, Techniques, and Procedures (AFTTP) - CORRECT ANSWER-What 
does AFTTP stand for? 
Maintenance Concept : Depot-level Maintenance - CORRECT ANSWER-Which 
maintenance concept has "maintenance requiring the overhaul, upgrading, or ...
Get paid weekly? You can!
-
2A3X7B Ssgt WAPS study Questions and Verified Answers | Passed | A+
- Exam (elaborations) • 84 pages • 2024
-
- $18.49
- + learn more
The term Out-of-hide means? 
: An informal term for manning requirements not validated by higher 
headquarters, but deemed important to the mission by org. leadership. 
What does AFTTP stand for? 
: Air Force Tactics, Techniques, and Procedures (AFTTP) 
Which maintenance concept has "maintenance requiring the overhaul, upgrading, or 
rebuilding of parts, assemblies, or subassemblies, and the testing and reclamation of 
equipment as necessary."? (AFI 21-101) 1.3 
: Maintenance Concept : Depo...
-
OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)
- Exam (elaborations) • 23 pages • 2024
-
- $15.49
- + learn more
What are the four different types of 
crane signals? 
Hand 
Voice 
Audible 
New 
2. The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required i...
-
Dynatrace Associate Certification Exam 1 Questions and Answers 2022 latest updte
- Exam (elaborations) • 10 pages • 2022
-
Available in package deal
-
- $12.89
- 2x sold
- + learn more
Dynatrace Associate Certification Exam 1 Questions and Answers 2022 
 
 
 
How long does it take for automatic baselines to be available? - 2 hours 
 
How is user session duration calculated? - The elapsed time between initiation of the first user action in a session and the completion of the last user action in the session 
 
Which event type has the highest severity level? - Availability events 
 
What are advantages of making a request a "key request"? - a. Longer data retention (35 days vs...
-
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A 
 
How does the operator determine the manufacturers recommended rope for the crane? 
A. count the sheav...
-
MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. Where shall the hand signals for the machine in use be posted: On 
the job site 
2. Where is it best to connect slings to lift boom sections: End fittings 
3. All manufacturers load charts and operations manual shall be kept: 
On the machine 
4. When shall wire rope be taken out of service if used as a running line for 
hoisting: Six randomly distributed broken wires i...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia