Load charts - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Load charts? On this page you'll find 616 study documents about Load charts.

Page 4 out of 616 results

Sort by

TET NCCCO General 200-300.
  • TET NCCCO General 200-300.

  • Exam (elaborations) • 27 pages • 2024
  • What could happen when the boom sections on an individually controlled telescopic section are not extended evenly? a) The longer sections could be overloaded. b) The capacity of the crane is increased. c) The shorter sections could be overloaded. d) It will not make a difference. a) The longer sections could be overloaded. While performing the shift inspection, you find a hoist wire rope with a kink in it, what would you do? a) Document it on the shift inspection. b) Stop opera...
    (0)
  • $16.49
  • + learn more
Dynatrace Associate Certification Exam Questions with Correct Answers 2023 graded A+
  • Dynatrace Associate Certification Exam Questions with Correct Answers 2023 graded A+

  • Exam (elaborations) • 10 pages • 2023
  • Dynatrace Associate Certification Exam Questions with Correct Answers 2023 How long does it take for automatic baselines to be available? - Answer - The time its takes for automatic baselines to be available varies and depends on several factors such as the complexity of the data, size of the model and the computing resources available. Typically it could take everywhere from a few hours to a few days for the automatic baselines to be generated How is user session duration calculated? -...
    (0)
  • $13.99
  • 1x sold
  • + learn more
NCCCO CORE QUESTIONS AND ANSWERS
  • NCCCO CORE QUESTIONS AND ANSWERS

  • Exam (elaborations) • 15 pages • 2023
  • The term "Superstructure or Upper works" refers to the area of the crane: Above the swing circle A crane must be level within _______% for the load chart ratings to be valid? 1% On what principle is crane stability based? Leverage What would be the effect of moving the tipping axis closer to the cranes center of gravity? Reduced stability Which of the following matches the appropriate load chart to a particular crane? Serial number A durable rating chart with legi...
    (0)
  • $12.99
  • + learn more
OSHA 30 Questions and Answers |  New One | Grade A+
  • OSHA 30 Questions and Answers | New One | Grade A+

  • Exam (elaborations) • 44 pages • 2024
  • Available in package deal
  • Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? Ans: D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. Ans: Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by __________ prior to use. Ans: A qualified person...
    (0)
  • $14.79
  • + learn more
2A3X7B Ssgt WAPS study Gude 2024 Questions and Answers A+ Grade
  • 2A3X7B Ssgt WAPS study Gude 2024 Questions and Answers A+ Grade

  • Exam (elaborations) • 24 pages • 2024
  • 2A3X7B Ssgt WAPS study Gude 2024 Questions and Answers A+ Grade An informal term for manning requirements not validated by higher headquarters, but deemed important to the mission by org. leadership. - CORRECT ANSWER-The term Out-of-hide means? Air Force Tactics, Techniques, and Procedures (AFTTP) - CORRECT ANSWER-What does AFTTP stand for? Maintenance Concept : Depot-level Maintenance - CORRECT ANSWER-Which maintenance concept has "maintenance requiring the overhaul, upgrading, or ...
    (0)
  • $15.49
  • + learn more
2A3X7B Ssgt WAPS study Questions and  Verified Answers | Passed | A+
  • 2A3X7B Ssgt WAPS study Questions and Verified Answers | Passed | A+

  • Exam (elaborations) • 84 pages • 2024
  • The term Out-of-hide means? : An informal term for manning requirements not validated by higher headquarters, but deemed important to the mission by org. leadership. What does AFTTP stand for? : Air Force Tactics, Techniques, and Procedures (AFTTP) Which maintenance concept has "maintenance requiring the overhaul, upgrading, or rebuilding of parts, assemblies, or subassemblies, and the testing and reclamation of equipment as necessary."? (AFI 21-101) 1.3 : Maintenance Concept : Depo...
    (0)
  • $18.49
  • + learn more
OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • What are the four different types of crane signals? Hand Voice Audible New 2. The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required i...
    (0)
  • $15.49
  • + learn more
Dynatrace Associate Certification Exam 1 Questions and Answers 2022 latest updte
  • Dynatrace Associate Certification Exam 1 Questions and Answers 2022 latest updte

  • Exam (elaborations) • 10 pages • 2022
  • Dynatrace Associate Certification Exam 1 Questions and Answers 2022 How long does it take for automatic baselines to be available? - 2 hours How is user session duration calculated? - The elapsed time between initiation of the first user action in a session and the completion of the last user action in the session Which event type has the highest severity level? - Availability events What are advantages of making a request a "key request"? - a. Longer data retention (35 days vs...
    (0)
  • $12.89
  • 2x sold
  • + learn more
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)
  • NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Crane configuration includes: A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction B. hoist drum speeds, line pull, wire rope size and rigging C. load charts, LMI, axle weights and center of gravity D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A How does the operator determine the manufacturers recommended rope for the crane? A. count the sheav...
    (0)
  • $15.49
  • + learn more
MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+
  • MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. Where shall the hand signals for the machine in use be posted: On the job site 2. Where is it best to connect slings to lift boom sections: End fittings 3. All manufacturers load charts and operations manual shall be kept: On the machine 4. When shall wire rope be taken out of service if used as a running line for hoisting: Six randomly distributed broken wires i...
    (0)
  • $10.49
  • + learn more