Lare section 4 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Lare section 4? On this page you'll find 71 study documents about Lare section 4.

Page 4 out of 71 results

Sort by

LARE: Section 4 Questions & Answers 100% Correct
  • LARE: Section 4 Questions & Answers 100% Correct

  • Exam (elaborations) • 11 pages • 2023
  • LARE: Section 4 Questions & Answers 100% CorrectLARE: Section 4 Questions & Answers 100% CorrectLARE: Section 4 Questions & Answers 100% CorrectLARE: Section 4 Questions & Answers 100% CorrectLARE: Section 4 Questions & Answers 100% Correct Wheelchair Side Reach - ANSWER4' max Wheelchair Front Reach - ANSWER4'-6" max Wheelchair Table Top - ANSWER2'-6" min Wheelchair Table Reach - ANSWER2'-1" max Max. Ramp runs before a landing - ANSWER30' for ramps 1:12 - 1:16 40' for ra...
    (0)
  • $10.99
  • + learn more
LARE section 4: Project & Construction Administration Practice Test fully solved 2023
  • LARE section 4: Project & Construction Administration Practice Test fully solved 2023

  • Exam (elaborations) • 9 pages • 2023
  • LARE section 4: Project & Construction Administration Practice Test fully solved 20231.) During the course of construction, the landscape architect discovers an error in the construction that may cause a portion of the project used by the public to fail. The landscape architect informs the client, but the client refuses to allow corrections to be made. The landscape architect should do which of the following? I. Report the problem to the appropriate building official. II. Report the issue to t...
    (0)
  • $9.99
  • + learn more
LARE - Section 4(question with complete solution)rated A+ 2023
  • LARE - Section 4(question with complete solution)rated A+ 2023

  • Exam (elaborations) • 4 pages • 2023
  • LARE - Section 4(question with complete solution)rated A+ 2023Slope generally considered to not be buildable - correct answer Slope >15% HPS stands for - correct answer High Point of Swale Hardscape slope min/max - correct answer 1-5% Softscape slope - correct answer 2% to maximum 3:1 General depth of swale - correct answer 1 foot Surface drainage formula - correct answer Q=CIA Q:runoff in cubic ft per sec C: runoff coefficient - pervious to impervious I:intensity of storm ...
    (0)
  • $9.99
  • + learn more
LARE Section 4: Materials QUESTIONS & Answers 100% verified
  • LARE Section 4: Materials QUESTIONS & Answers 100% verified

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUESTIONS & Answers 100% verified LARE Section 4: Materials QUEST...
    (0)
  • $10.99
  • + learn more
LARE, section 4 (2023-2024) Questions & Answers (Graded A)
  • LARE, section 4 (2023-2024) Questions & Answers (Graded A)

  • Exam (elaborations) • 4 pages • 2023
  • LARE, section 4 () Questions & Answers (Graded A)LARE, section 4 () Questions & Answers (Graded A)LARE, section 4 () Questions & Answers (Graded A) descriptive specifications - ANSWERdescribes thoroughly the manner, the materials, methods and workmanship used to construct a specific item. (tell them how to build it and with what specifically- places liability on the landscape architect) performance specifications - ANSWERrequires the contractor construct an item to a specified minimum stand...
    (0)
  • $9.99
  • + learn more
LARE section 4 Questions & Answers Graded A+
  • LARE section 4 Questions & Answers Graded A+

  • Exam (elaborations) • 5 pages • 2023
  • descriptive specifications - Answer describes thoroughly the manner, the materials, methods and workmanship used to construct a specific item. (tell them how to build it and with what specifically- places liability on the landscape architect) performance specifications - Answer requires the contractor construct an item to a specified minimum standard (ex: the concrete be a min. of 2000 psi at 28 days) Prescriptive specifications - Answer indicates the required ingredients in order to con...
    (0)
  • $9.99
  • + learn more