General contractor exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about General contractor exam? On this page you'll find 2647 study documents about General contractor exam.
Page 4 out of 2.647 results
Sort by
-
CLC 059 Subcontracting Exam Questions And Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $11.49
- 3x sold
- + learn more
CLC 059 Subcontracting Exam Questions And Answers 
 
What is a purchase order, task order, or other contract between a prime contractor and another business to support the prime contract and to which the government has no contractual relationship, i.e., no privity? - ANS Subcontract 
 
Which of the following are key, recommended resources for subcontracting compliance management? (Select three that apply) - ANS DFARS, SBA, DCMA 
 
Which of the following are key, recommended resources for ...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? - Discard the mortar 
What minimum time must you wait before caulking or grouting new tiles? - 24-48 Hours 
How long should you wait before installing tile on a shower pan? - 24 Hours 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater 
than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Type-B Soils 
If 65 street lights are fed by a 2275 volt series cir...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS AND ANSWERS 2024
- Exam (elaborations) • 48 pages • 2024
- Available in package deal
-
- $18.99
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS AND ANSWERS 2024 
If unused mortar stiffens due to hydration of cement, what must you do? - ANS-Discard the mortar 
What minimum time must you wait before caulking or grouting new tiles? - ANS-24-48 Hours 
How long should you wait before installing tile on a shower pan? - ANS-24 Hours 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater 
than 0.5 and less than 1.5 tons/sq ft (tsf), are typical ex...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024 QUESTIONS WITH COMPLETE SOLUTIONS ALREADY PASSED
- Exam (elaborations) • 58 pages • 2024
-
- $15.49
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? - CORRECT 
ANSWER Discard the mortar 
 
What minimum time must you wait before caulking or grouting new tiles? - CORRECT 
ANSWER 24-48 Hours 
 
How long should you wait before installing tile on a shower pan? - CORRECT 
ANSWER 24 Hours 
 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive 
strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - 
CORR...
-
CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $11.99
- 2x sold
- + learn more
CMIT Exam (200 multiple choice) Questions with Verified Answers 
 
A CM's role and responsibilities are governed solely by the Owner/CM Agreement. 
True False - CORRECT ANSWER True 
 
There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction management practice. However, there are some key differences. Which of the following do not apply to both CM forms? 
A) Both forms provide advice to the owner on constructibility, budget and the schedule....
Too much month left at the end of the money?
-
AFSB 152 - The Institutes Practice Exam Questions and Answers 2023
- Exam (elaborations) • 24 pages • 2023
-
Available in package deal
-
- $20.99
- 1x sold
- + learn more
AFSB 152 - The Institutes Practice Exam Questions and Answers 2023 
Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing? 
• Heavy and highway construction 
• General Engineering contractor 
• General Building contractor 
• Design/build contractor - Correct Answer-Heavy and highway construction 
 
The project owner for a new shopping plaza being built in Highville is the Hig...
-
General contractor exam
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
In a post tensioned Beam what is the minimum size bar used to support the beam? - correct answer-#4 Bar 
 
What is the minimum height between finished floor and joist in the kitchen is 48" on center? - correct answer-7 FT 
 
How thick does a load bearing masonry need to be on a single story building? - correct answer-6 inches 
 
What chemical is used for high heat concrete - correct answer-retarder 
 
when mechanical equipment is on the roof, how far from the edge of the roof should a warning l...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM
- Exam (elaborations) • 24 pages • 2023
-
- $13.49
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? - Answer- Discard the mortar 
 
What minimum time must you wait before caulking or grouting new tiles? - Answer- 24-48 Hours 
 
How long should you wait before installing tile on a shower pan? - Answer- 24 Hours 
 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Answer- Type-B Soils 
 
If 65 street l...
-
VA Contractor/Residential Contractor Exam Bundle
- Package deal • 19 items • 2023
-
- $35.49
- 1x sold
- + learn more
VA Contractor General Questions and Answers 2023
VA Contractors: VA Advanced (Class A) Exam Questions and Answers
VA Contractors: Virginia (Class A or B) Exam Questions and Answers
VA Contractors: General (Class A or B) Exam Questions and Answers
Naslca Virginia Exam Practice Questions and Answers
NASCLA Contractors Guide Virginia, 8th Ed Chapter


-
CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST GRADE A+ 300 QUESTIONS FULLY SOLVED 100% GUARANTEED PASS
- Exam (elaborations) • 62 pages • 2024
-
- $11.49
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST GRADE A+ 300 QUESTIONS FULLY SOLVED 100% GUARANTEED PASS
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia