PJM Transmission Test |190| Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 33 pages • 2024
-
- $12.99
- + learn more
PJM Transmission Test |190| Questions with 100% Correct Answers | Verified | Latest Update 2024 
Which of the following balancing control modes is used by PJM under normal operations? ANS-Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? ANS-Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instabil...
-
PJM Test Questions With 100% Correct Answers | Verified | Latest Update 2024 | 100% Pass
- Exam (elaborations) • 69 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
PJM Test Questions With 100% Correct Answers | Verified | Latest Update 2024 | 100% Pass 
Which of the following balancing control modes is used by PJM under normal operations? - Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load forecast? - Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - Dynamic Ins...
-
PJM Generation Dispatcher Exam Practice | Questions and Correct Answers | Latest Update 2024/2025 | 100% PASS
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
PJM Generation Dispatcher 
Exam Practice | Questions and 
Correct Answers | Latest 
Update 2024/2025 | 100% 
PASS 
An EXCITER on a traditional generator does what? - Answer -Voltage 
regulation (AVR) if you change the excitation current, you change the 
voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. 
- Answer -Limits 
When synchronizing to the interconnection, what needs to be 
synchronized? - Answer -Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) ...
-
PJM Test Questions Well Answered And Graded A+.
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - correct answer Dynamic Instability 
 
If PJM experienced an event...
-
PJM Generation Dispatcher Exam Practice Questions & Answers 2024
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
PJM Generation Dispatcher Exam Practice Questions & Answers 2024 
 
 
An EXCITER on a traditional generator does what? - ANSWER-Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - ANSWER-Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? - ANSWER-Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - ANSWER-10A or...
And that's how you make extra money
-
PJM Generation Dispatcher Practice Exam Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $10.49
- + learn more
PJM Generation Dispatcher Practice Exam Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass 
An EXCITER on a traditional generator does what? - Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) procedure is implement...
-
PJM Generation Dispatcher 65 Exam Practice Questions And Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
An EXCITER on a traditional generator does what? - ️️Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - ️️Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? - ️️Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - ️️10A or greater is measured by special equipment at Missouri Ave or Meadowbrook a...
-
PJM Practice questions With Explanation of Answers.
- Exam (elaborations) • 20 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - correct answer c. 4 hours 
 
The following would be considered non-critical plant load (Select 2) - correct answer A. Office Area Air Conditioners 
C. Lighting 
 
During a Cold Weather Alert, PJM will take which of the actions - correct answer D. Assume an unavailability rate for schedule generation 
 
When PJM issues a High System Voltage Message, the GO should have its units operate at: - correct an...
-
PJM Exam Questions and Answers 100% Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 100% Correct 
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO - Correct Answer ️️ -TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start 
(hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? - 
Correct Answer ️️ -20 MVA 
Minimum MVARs for an aggr...
-
AECN 357 Exam 4 Questions With 100% Correct!!
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
HR2454 cow tax to reduce GHG emissions from ag - Answer-False 
HR2454 would have largely exempted ag from GHG regulations - Answer-true 
under HR2454, farmers might be able to sell carbon credits to power plants, etc. - Answer-False 
Over 40% US GHG from petroleum (cars) - Answer-true 
over 30% US GHG from coal (electricity) - Answer-true 
in 2007 congress voted to increase fuel efficiency to 35 mpg by 2020 - Answer-true 
HR2454 said 6% electricity from renewable sources by 2012, 25% by 2025 - A...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia