Design and construction - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Design and construction? On this page you'll find 6763 study documents about Design and construction.

Page 4 out of 6.763 results

Sort by

CSA W47.1 and CSA W59 Exam Questions and Answers Already Passed
  • CSA W47.1 and CSA W59 Exam Questions and Answers Already Passed

  • Exam (elaborations) • 10 pages • 2024
  • CSA Standard W59 covers the welding requirements for what type of steel construction? The welding requirements of CSA Standard W59 can be applied to carbon and low-alloy welded steel What types of structures are covered in CSA Standard W59? CSA Standard W59 covers statically- and cyclically-loaded (repetitive loading) structures. What is a low-hydrogen electrode? A low-hydrogen electrode is an electrode that deposits weld metal with a specified maximum limit of diffusible hydrogen. What ar...
    (0)
  • $12.38
  • 2x sold
  • + learn more
EDAC (EVIDENCE BASED DESIGN AND CONSTRUCTION) EXAM ALREADY PASSED!!
  • EDAC (EVIDENCE BASED DESIGN AND CONSTRUCTION) EXAM ALREADY PASSED!!

  • Exam (elaborations) • 6 pages • 2024
  • EDAC (EVIDENCE BASED DESIGN AND CONSTRUCTION) EXAM ALREADY PASSED!!
    (0)
  • $12.99
  • + learn more
CEFP Planning, Design and Construction Questions and Answers 2024
  • CEFP Planning, Design and Construction Questions and Answers 2024

  • Exam (elaborations) • 14 pages • 2024
  • CEFP Planning, Design and Construction
    (0)
  • $13.99
  • + learn more
AFSB 152 - The Institutes Practice Exam Questions and Answers 2023
  • AFSB 152 - The Institutes Practice Exam Questions and Answers 2023

  • Exam (elaborations) • 24 pages • 2023
  • AFSB 152 - The Institutes Practice Exam Questions and Answers 2023 Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing? • Heavy and highway construction • General Engineering contractor • General Building contractor • Design/build contractor - Correct Answer-Heavy and highway construction The project owner for a new shopping plaza being built in Highville is the Hig...
    (0)
  • $20.99
  • 1x sold
  • + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023

  • Exam (elaborations) • 10 pages • 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Estimating: The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off: The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities: Measured amounts of construction...
    (0)
  • $30.49
  • 3x sold
  • + learn more
Study Guide California Designated Operator ( 16). Exam Questions With Verified Answers
  • Study Guide California Designated Operator ( 16). Exam Questions With Verified Answers

  • Exam (elaborations) • 25 pages • 2024
  • ©BRAINBARTER 2024/2025 Study Guide California Designated Operator ( 16). Exam Questions With Verified Answers The following are not "underground storage tanks" - answer1. A farm Tank 2. A heating oil tank 3. A hydraulic lift tank 4. A liquefied petroleum gas tank 5. A septic tank 6. A sump, pit, pond or lagoon 7. A wastewater treatment tanks except if it is part of a UST system 8. A pipeline located in a refinery except if it is connected to an underground storage tank 9. A storm w...
    (0)
  • $11.49
  • 1x sold
  • + learn more
CEFP Planning, Design and Construction Exam with Guaranteed Accurate Answers
  • CEFP Planning, Design and Construction Exam with Guaranteed Accurate Answers

  • Exam (elaborations) • 21 pages • 2024
  • Building Information Modeling (BIM) - correct answer "Enables project participants to access various digital models throughout the design process without having to wait for paper drawings to be produced and delivered." [Special Topics, Building Information Modeling] Lump Sum Fee - correct answer "Is a fixed-price agreement, broken down into phases: preliminary, design development, construction documents, and construction administration. This is generally calculated from an estimate ...
    (0)
  • $14.49
  • + learn more
MAC3703 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED. MAC3703 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED.
  • MAC3703 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED.

  • Exam (elaborations) • 13 pages • 2024
  • Well-structured MAC3703 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED. (DETAILED ANSWERS - DISTINCTION GUARANTEED!). . (DETAILED ANSWERS - DISTINCTI ON GUARANTEED!). QUESTION 1 (20 MARKS) DNF Waste & Environmental Services (DNF) is an Environmental Management and Waste Management Services Company that was created in 2008. It is one of the leading waste and environmental management service providers in South Africa. DNF is a 100% Black woman owned business and is a Level 1 Val...
    (0)
  • $5.92
  • 5x sold
  • + learn more
LARE EXAM 1(2023-2024)Questions and Answers 100% Correct
  • LARE EXAM 1(2023-2024)Questions and Answers 100% Correct

  • Exam (elaborations) • 34 pages • 2023
  • LARE EXAM 1()Questions and Answers 100% CorrectLARE EXAM 1()Questions and Answers 100% CorrectLARE EXAM 1()Questions and Answers 100% CorrectLARE EXAM 1()Questions and Answers 100% Correct Outline the business relationships between the three principal parties that are involved in a landscape construction project (Their obligations) - ANSWER1. Owner/ client - initiate the project ; signs separate contracts for completion, & responsible for funding design & construction 2. Contractor - hired ...
    (0)
  • $12.99
  • 1x sold
  • + learn more
COSC 253 - Exam 1 || A+ Guaranteed.
  • COSC 253 - Exam 1 || A+ Guaranteed.

  • Exam (elaborations) • 6 pages • 2024
  • Buildings account for ___________ to _____________ percent of the world's energy use correct answers 1/3 to 1/2 one simple definition of _____________ is building to meet the needs of the present generation without compromising the ability of future generations to meet their needs correct answers sustainability a _________-_______-__________ life cycle analysis (LSA) begins with materials extraction by extends only as far as when the material leaves the factory correct answers cradle-to-g...
    (1)
  • $10.69
  • 1x sold
  • + learn more