Crane and rigging - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Crane and rigging? On this page you'll find 693 study documents about Crane and rigging.
Page 4 out of 693 results
Sort by
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom correct answers c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8%...
-
TET NCCCO General 200-300.
- Exam (elaborations) • 27 pages • 2024
-
- $16.49
- + learn more
What could happen when the boom sections on an individually controlled telescopic section are not extended evenly? 
 
a) The longer sections could be overloaded. 
b) The capacity of the crane is increased. 
c) The shorter sections could be overloaded. 
d) It will not make a difference. 
a) The longer sections could be overloaded. 
 
 
 
While performing the shift inspection, you find a hoist wire rope with a kink in it, what would you do? 
 
a) Document it on the shift inspection. 
b) Stop opera...
-
Mobile Crane NCCER Study Guide with Complete Solutions
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
Mobile Crane NCCER Study Guide with Complete SolutionsMobile Crane NCCER Study Guide with Complete SolutionsMobile Crane NCCER Study Guide with Complete SolutionsMobile Crane NCCER Study Guide with Complete Solutions 
When determining the "gross load" the best method is: - ANSWER - Get an accurate load weight and add the rigging 
 
By order of strength which is correct - ANSWER - Basket, Vertical, Choker 
 
Primary purpose for a roster sheave or auxiliary boom point sheave is to: - ANSWER - Se...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
- Exam (elaborations) • 16 pages • 2024
-
Available in package deal
-
- $14.99
- + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to 
finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing inst...
-
NCCCO MOBILE CRANE | 100 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 17 pages • 2023
-
- $15.49
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
Fear of missing out? Then don’t!
-
Rigging Test Questions and Answers (Graded A)
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Rigging Test Questions and Answers (Graded A)Rigging Test Questions and Answers (Graded A)Rigging Test Questions and Answers (Graded A)Rigging Test Questions and Answers (Graded A)Rigging Test Questions and Answers (Graded A) 
a signal person must be provided when the point of operation, meaning the load travel or the area near or at load placement is not in full view of the: - ANSWER-operator 
 
when the equipment is travelling and the view in the direction of travel is obstructed, a __________...
-
Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+. manufacturer's specification: all hoisting machinery shall be operated 
in accor- dance with the: 
2. inoperable and secure: maintenance repair and refueling shall be done 
when the machine is: 
3. daily: visual inspection shall be made of wire ropes, bearings, 
gears, friction clutches, brakes, chain drives and other parts subject to wear on all 
hoisting machinery to ens...
-
OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)
- Exam (elaborations) • 23 pages • 2024
-
- $14.99
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (VERIFIED) The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required in 
the constructi...
-
Mobile Crane Questions Test #1 Questions and Answers 100% Correct
- Exam (elaborations) • 5 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
Mobile Crane Questions Test #1 Questions and Answers 100% CorrectMobile Crane Questions Test #1 Questions and Answers 100% CorrectMobile Crane Questions Test #1 Questions and Answers 100% Correct 
Where is the best location for leveling a crane? - ANSWER - Upperworks. 
 
When determining the gross load the best method is? - ANSWER - Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - ANSWER - Basket, vertical, choker.
-
Rigging practices with 100% correct answers
- Exam (elaborations) • 9 pages • 2024
-
- $17.49
- + learn more
net capacity 
A load chart range diagram can best be used to help identify: 
 
 
 
80% 
for mobile crane working at maximum radius, exceeding what percentage of the cranes capacity requires the radius to be verified? 
 
 
 
3/4 in 
the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? 
 
 
 
false 
when tying knots in synthetic rope lashing, the rated load is increased by 50% ? 
 
 
 
equal to or greater than 
the size of shackle that can be used in the eye of a wire ...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia