Crane and rigging - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Crane and rigging? On this page you'll find 787 study documents about Crane and rigging.
Page 4 out of 787 results
Sort by
-
NCCCO Tower Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A
- Exam (elaborations) • 30 pages • 2023
-
Available in package deal
-
- $10.99
- + learn more
NCCCO Tower Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A 
 
 
Q: According to OSHA when lifting personnel the cranes hook must be the type that 
 
 
Answer: 
Can be closed and locked 
 
 
 
Q: According to OSHA when working over water with a man basket are the people inside required to wear a belt/harness? 
 
 
Answer: 
No harness or belt required 
 
 
 
Q: According to ASME B30.3 when working near powerlines where should caution stickers be installed? 
 
 
Answer...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANS c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - ANS a. 
 
3. The lo...
-
Hoisting License (full) questions and solutions
- Exam (elaborations) • 6 pages • 2024 Popular
-
Available in package deal
-
- $12.49
- 1x sold
- + learn more
Hoisting License (full) questions and solutions 
What is the purpose of the 520: C.M.R. 6:00? 
to establish rules and regulations for the safety of the public 
 
 
 
What type of equipment requires a hoisting license? 
equipment that has minimum capability of hoisting the load higher than 10' feet or equipment that has the capability of lifting loads greater than 500 pounds or equipment that has capacity of the becket exceeds 1/4 cubic yard 
 
 
 
What does A.S.M.E. stand for? 
American Society...
-
TET NCCCO General 200-300.
- Exam (elaborations) • 27 pages • 2024
-
- $16.49
- + learn more
What could happen when the boom sections on an individually controlled telescopic section are not extended evenly? 
 
a) The longer sections could be overloaded. 
b) The capacity of the crane is increased. 
c) The shorter sections could be overloaded. 
d) It will not make a difference. 
a) The longer sections could be overloaded. 
 
 
 
While performing the shift inspection, you find a hoist wire rope with a kink in it, what would you do? 
 
a) Document it on the shift inspection. 
b) Stop opera...
Make study stress less painful
-
Advanced Rigger 2024
- Exam (elaborations) • 11 pages • 2024
-
- $15.49
- + learn more
Advanced Rigger 2024 
What is meant by the term "two blocking" - CORRECT ANSWER The 
load block contacts the boom point sheaves 
Lifting 20,000 pound with a 2-leg bridle sling at 30% horizontal sling 
angle, what is the force applied to each leg. - CORRECT ANSWER 
20,000 pound 
In multiple crane lifts using an equalizer beam, the weight of the beam 
should be considered. - CORRECT ANSWER Part of the load weight 
What is required if there is a deviation from the lift plan. - CORRECT 
A...
-
Mobile Crane NCCER Study Guide with Complete Solutions
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
Mobile Crane NCCER Study Guide with Complete SolutionsMobile Crane NCCER Study Guide with Complete SolutionsMobile Crane NCCER Study Guide with Complete SolutionsMobile Crane NCCER Study Guide with Complete Solutions 
When determining the "gross load" the best method is: - ANSWER - Get an accurate load weight and add the rigging 
 
By order of strength which is correct - ANSWER - Basket, Vertical, Choker 
 
Primary purpose for a roster sheave or auxiliary boom point sheave is to: - ANSWER - Se...
-
OECP EXAM NEWEST 2024 ACTUAL TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (ALREADY GRADED A+)
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
OECP EXAM NEWEST 2024 ACTUAL TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (ALREADY GRADED A+) 
 
What are the 3 basic components of wire rope? - Answer- Strands, wires, and core 
 
When should you check the LMI, anti-two-block, and all crane functions? - Answer- Before each shift 
 
A person inspecting a crane should have what kind of knowledge? - Answer- Practical and theoretical 
 
What does RCL stand for? - Answer- Rated capacity limiter 
 
What does LMI stand for? - Answer- Load moment i...
-
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
- Exam (elaborations) • 23 pages • 2024
-
- $15.99
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required in 
the construction...
-
NCCCO Core Questions and Answers with Complete Solutions Graded A 2024
- Exam (elaborations) • 22 pages • 2024
-
Available in package deal
-
- $12.49
- + learn more
The term "Superstructure or Upper works" refers to the area of the crane: 
Above the swing circle 
 
 
A crane must be level within _______% for the load chart ratings to be valid? 
1% 
 
 
On what principle is crane stability based? 
Leverage 
 
 
What would be the effect of moving the tipping axis closer to the cranes center of gravity? 
Reduced stability 
 
 
Which of the following matches the appropriate load chart to a particular crane? 
Serial number 
 
 
A durable rating chart with legi...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia