Cost breakdown structure - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cost breakdown structure? On this page you'll find 1505 study documents about Cost breakdown structure.

Page 4 out of 1.505 results

Sort by

ISDS 351 FINAL Exam Questions With 100% Correct Answers.
  • ISDS 351 FINAL Exam Questions With 100% Correct Answers.

  • Exam (elaborations) • 36 pages • 2024
  • Available in package deal
  • ISDS 351 FINAL Exam Questions With 100% Correct Answers. A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not. True False - answerFalse Projects should be developed in increments. True False - answerTrue A project manager's primary role is to provide the funding for a project. True False - answerFalse The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a p...
    (0)
  • $13.49
  • + learn more
OMIS 690 Exam 2 || with 100% Error-free Solutions.
  • OMIS 690 Exam 2 || with 100% Error-free Solutions.

  • Exam (elaborations) • 9 pages • 2024
  • Work Breakdown Structure correct answers Provides a hierarchical structure that outlines the activities or work that needs to be done in order to complete the project scope. Work Breakdown Structure correct answers provides a bridge or link between the project's scope and the detailed project plan that will be entered into a project management software package. Milestones correct answers significant event or achievement that provides evidence that that deliverable has been completed or th...
    (0)
  • $11.29
  • + learn more
PMP Exam with Questions and Answers Graded A+
  • PMP Exam with Questions and Answers Graded A+

  • Exam (elaborations) • 51 pages • 2024
  • Available in package deal
  • Actual Cost - ANSWER The realized cost incurred for the work performed on an activity during a specific time period Organizational Breakdown Structure - ANSWER A hierarchical representation of the project organization, which illustrates the relationship between project activities and the organizational units that will perform those activities
    (0)
  • $12.49
  • + learn more
CPA BEC TOP Study Guide Exam Questions and CORRECT Answers
  • CPA BEC TOP Study Guide Exam Questions and CORRECT Answers

  • Exam (elaborations) • 100 pages • 2024
  • Internal controls Process that is designed and implemented by an organization's management , board of directors and other employees to provide reasonable assurance that it will achieve its compliance, operating, and reporting objectives Cost Estimation Method: Parametric Estimating A cost estimation method that relies on a statistical relationship between historical costs and other variables, such as square footage. Cost Estimation Method: Analogous estimating A cost estimation method t...
    (0)
  • $9.49
  • + learn more
PMBOK-CAPM UPDATED Exam Questions and CORRECT Answers
  • PMBOK-CAPM UPDATED Exam Questions and CORRECT Answers

  • Exam (elaborations) • 38 pages • 2024
  • Available in package deal
  • Work Package - The work defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed. Acceptance Criteria - A set of conditions that is required to be met before deliverables are accepted. Accuracy - Within the quality management system, accuracy is an assessment of correctness. Activity List - A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scop...
    (0)
  • $9.49
  • + learn more
 CAPM PMBOK Glossary Exam Study Questions and Answers Graded A 2024-2025
  • CAPM PMBOK Glossary Exam Study Questions and Answers Graded A 2024-2025

  • Exam (elaborations) • 31 pages • 2024
  • Work Package - The work defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed. Acceptance Criteria - A set of conditions that is required to be met before deliverables are accepted. Accuracy - Within the quality management system, accuracy is an assessment of correctness. Activity List - A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope ...
    (0)
  • $15.59
  • + learn more
GFEBS Project Systems Course Exam With Questions And Answers
  • GFEBS Project Systems Course Exam With Questions And Answers

  • Exam (elaborations) • 14 pages • 2024
  • GFEBS Project Systems Course Exam With Questions And Answers What is a project definition? The project definition contains data used for the entire project. It contains default values which can be passed on to the WBS elements, or influence them, such as: Project Profile Project Control values (e.g., user status profile) Organizational data Planning parameters Settlement Rules Unique Project Number The Project Profile is often called the "DNA" of a PS project; it determines many a...
    (0)
  • $10.29
  • + learn more
CNIT 480 Final Exam Questions and Answers 100% Pass
  • CNIT 480 Final Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 31 pages • 2024
  • CNIT 480 Final Exam Questions and Answers 100% Pass Glass's - Answer-"For every 25% increase in the connections of a system, there is a 100% increase in the complexity of the system." This is referred to as ___ Law. death march - Answer-A ______ project is described as a project that never ends, everyone is afraid to cancel it. Matrix - Answer-A ______ organizational structure combines the benefits of the functional structure and the benefits of the projects structure for an organizati...
    (0)
  • $13.49
  • + learn more
MBA 624 Chapter 10  Test /Actual Questions and Answers 100% Correct/ 10HWTake Test
  • MBA 624 Chapter 10 Test /Actual Questions and Answers 100% Correct/ 10HWTake Test

  • Exam (elaborations) • 19 pages • 2024
  • MBA 624 Chapter 10 Test /Actual Questions and Answers 100% Correct/ 10HWTake Test MBA 624 Chapter 10 Test /Actual Questions and Answers 100% Correct/ 10HWTake Test Take Test: CH10_HW Question 1 Consider the following project. Compute the slack time for activity C. 0 4 2 3 Question 2 A PERT/CPM activity has an optimistic time estimate of 3 days, a most likely time estimate of 8 days, and a pessimistic time estimate of 10 days. The expected time (in d...
    (0)
  • $15.49
  • + learn more
CSUF Exam 1 ISDS 351 Hoda Diba Exam |  Questions & 100% Correct Answers (Verified) |  Latest Update | Grade A+
  • CSUF Exam 1 ISDS 351 Hoda Diba Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • A ________ web site that allows users to edit and change its content easily and rapidly Select one? a. Wiki b. Forum c. Podcast d. Blog : a. Wiki A(n) ________ is a statement of a compelling business need that an organization must meet to achieve its vision and mission. Select one: a. Mission b. Objective c. Tagline d. Logo 2 | P a g e : b. Objective Identify the formal approach that creates three time estimates for an activity. Select one: a. Program Evaluation and R...
    (0)
  • $15.49
  • + learn more