Cosc 275 exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 275 exam? On this page you'll find 111 study documents about Cosc 275 exam.
Page 4 out of 111 results
Sort by
-
COSC 275 Exam 2 Palmer quizzes and answers 2024
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $13.49
- + learn more
Hard bid low price - Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
 
Competitive sealed proposals - Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
 
Construction Manager at Risk CMAR - Construction manager hired in design phase to assist designer in constructability. 
CM a...
-
COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
-
COSC 275 Exam 1 Palmer Questions and Answers Latest Updated
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
COSC 275 Exam 1 Palmer
-
COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $13.48
- + learn more
COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 
With 100% Verified Solutions
-
COSC 275 WORKMAN FINAL EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | LATEST EXAM | VERIFIED ANSWERS
- Exam (elaborations) • 46 pages • 2024
-
- $25.99
- + learn more
COSC 275 WORKMAN FINAL EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | LATEST EXAM | VERIFIED ANSWERS
Want to regain your expenses?
-
Cosc 275 exam 2 Questions and Answers 100% Verified
- Exam (elaborations) • 4 pages • 2024
-
- $7.99
- + learn more
Air barrier - A component of the building envelope system that prohibits air leakage into a 
building and reduces the risk of condensation build up. House wrap and fluid- applied air barriers are 
examples. 
Anchor bolt - A threaded bolt, usually embedded in a foundation, for securing a sill, framework, or 
machinery. 
Beam - A horizontal structural member, such as a girder, rafter, or purlin, that transversely 
supports a load and transfers the load to vertical members, such as columns and wall...
-
COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed
- Exam (elaborations) • 9 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
COSC 275 Exam 2 Palmer | Latest 
Update | 2024/2025 | Already Passed 
 
Air Barrier A component of the envelop system that prohibits air leakage into a building and 
reduces the risk of condensation build up. House wrap and fluid applied barriers are examples. 
 
Anchor Bolt A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, 
or machinery 
 
Beam A structural member that primarily resists loads applied laterally to the axis 
 
Bond Breaker A material used to prevent...
-
Cosc 275 exam 2 Questions and Correct Answers
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Column 
Answer- A long, relatively slender, supporting pillar. A column is usually loaded 
axially in compression. 
Beam 
Answer- A horizontal structural member, such as a girder, rafter, or purlin, 
that transversely supports a load and transfers the load to vertical members, 
such as columns and walls. 
Girder 
Answer- A large principal beam of steel, reinforced concrete, wood, or a 
combination of these, used to support other structural members at isolated 
points along its length. 
Jois...
-
COSC 275 Exam 1 Study Questions Solved Correctly.
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $10.09
- + learn more
Estimating: - Answer The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
Take-off: - Answer The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
Quantities: - Answer Measured amounts of construction items expressed in their customary uni...
-
COSC 275 PALMER EXAM 1 WITH QUESTIONS AND ANSWERS
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
COSC 275 PALMER EXAM 1 WITH QUESTIONS AND ANSWERS ...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia