Cosc 275 exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275 exam? On this page you'll find 111 study documents about Cosc 275 exam.

Page 4 out of 111 results

Sort by

COSC 275 Exam 2 Palmer quizzes and answers 2024
  • COSC 275 Exam 2 Palmer quizzes and answers 2024

  • Exam (elaborations) • 11 pages • 2024
  • Hard bid low price - Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR - Construction manager hired in design phase to assist designer in constructability. CM a...
    (0)
  • $13.49
  • + learn more
COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
  • COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
    (0)
  • $11.49
  • + learn more
COSC 275 Exam 1 Palmer Questions and Answers Latest Updated
  • COSC 275 Exam 1 Palmer Questions and Answers Latest Updated

  • Exam (elaborations) • 10 pages • 2024
  • COSC 275 Exam 1 Palmer
    (0)
  • $15.49
  • + learn more
COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions
  • COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions
    (0)
  • $13.48
  • + learn more
COSC 275 WORKMAN FINAL EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | LATEST EXAM | VERIFIED ANSWERS
  • COSC 275 WORKMAN FINAL EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | LATEST EXAM | VERIFIED ANSWERS

  • Exam (elaborations) • 46 pages • 2024
  • COSC 275 WORKMAN FINAL EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | LATEST EXAM | VERIFIED ANSWERS
    (0)
  • $25.99
  • + learn more
Cosc 275 exam 2 Questions and Answers 100% Verified
  • Cosc 275 exam 2 Questions and Answers 100% Verified

  • Exam (elaborations) • 4 pages • 2024
  • Air barrier - A component of the building envelope system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and fluid- applied air barriers are examples. Anchor bolt - A threaded bolt, usually embedded in a foundation, for securing a sill, framework, or machinery. Beam - A horizontal structural member, such as a girder, rafter, or purlin, that transversely supports a load and transfers the load to vertical members, such as columns and wall...
    (0)
  • $7.99
  • + learn more
COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed
  • COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed

  • Exam (elaborations) • 9 pages • 2024
  • COSC 275 Exam 2 Palmer | Latest Update | 2024/2025 | Already Passed Air Barrier A component of the envelop system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and fluid applied barriers are examples. Anchor Bolt A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or machinery Beam A structural member that primarily resists loads applied laterally to the axis Bond Breaker A material used to prevent...
    (0)
  • $9.99
  • + learn more
Cosc 275 exam 2 Questions and Correct  Answers
  • Cosc 275 exam 2 Questions and Correct Answers

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Column Answer- A long, relatively slender, supporting pillar. A column is usually loaded axially in compression. Beam Answer- A horizontal structural member, such as a girder, rafter, or purlin, that transversely supports a load and transfers the load to vertical members, such as columns and walls. Girder Answer- A large principal beam of steel, reinforced concrete, wood, or a combination of these, used to support other structural members at isolated points along its length. Jois...
    (0)
  • $9.99
  • + learn more
COSC 275 Exam 1 Study Questions Solved Correctly.
  • COSC 275 Exam 1 Study Questions Solved Correctly.

  • Exam (elaborations) • 13 pages • 2024
  • Estimating: - Answer The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off: - Answer The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities: - Answer Measured amounts of construction items expressed in their customary uni...
    (0)
  • $10.09
  • + learn more
COSC 275 PALMER EXAM 1 WITH QUESTIONS AND ANSWERS
  • COSC 275 PALMER EXAM 1 WITH QUESTIONS AND ANSWERS

  • Exam (elaborations) • 27 pages • 2024
  • Available in package deal
  • COSC 275 PALMER EXAM 1 WITH QUESTIONS AND ANSWERS ...
    (0)
  • $9.99
  • + learn more