Construction contract - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Construction contract? On this page you'll find 7303 study documents about Construction contract.

Page 4 out of 7.303 results

Sort by

AFSB 152 - The Institutes Practice Exam Questions and Answers 2023
  • AFSB 152 - The Institutes Practice Exam Questions and Answers 2023

  • Exam (elaborations) • 24 pages • 2023
  • AFSB 152 - The Institutes Practice Exam Questions and Answers 2023 Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing? • Heavy and highway construction • General Engineering contractor • General Building contractor • Design/build contractor - Correct Answer-Heavy and highway construction The project owner for a new shopping plaza being built in Highville is the Hig...
    (0)
  • $20.99
  • 1x sold
  • + learn more
Oregon Construction Contractors CCB Test 2022 (verified answers)
  • Oregon Construction Contractors CCB Test 2022 (verified answers)

  • Exam (elaborations) • 57 pages • 2022
  • Oregon Construction Contractors CCB Test 2022 (verified answers)
    (3)
  • $12.99
  • 7x sold
  • + learn more
IMSA Signal Technician Level 1 Actual Questions with Verified Answers |Latest 2024/2025 -Graded A.
  • IMSA Signal Technician Level 1 Actual Questions with Verified Answers |Latest 2024/2025 -Graded A.

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • What is the purpose of traffic signal inspection? -To provide a record of construction -To document results of tests -To verify the installation meets the requirements of the plans and contract documents A good five step procedure for troubleshooting is: Observe, identify, determine, correct, observe again What device is used to measure the resistance or breakdown strength of conductor insulation: Megohmmeter What device does a technician use to troubleshoot existing loops alrea...
    (0)
  • $10.49
  • 1x sold
  • + learn more
Construction Contracts Midterm Set Test Questions And Verified  Solutions
  • Construction Contracts Midterm Set Test Questions And Verified Solutions

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • Construction Contracts Midterm Set Test Questions And Verified Solutions This term means the management or handling of the business relations between parties to a contract - ANSWER : contract administration This term refers to a much broader responsibility of relating to all project-related functions between the parties to a contract - ANSWER : construction administration Project delivery system is defined as... - ANSWER : an approach to building the project team. an organization...
    (0)
  • $9.99
  • + learn more
GA Pest Employee Registration Exam Questions and Answers
  • GA Pest Employee Registration Exam Questions and Answers

  • Exam (elaborations) • 11 pages • 2024
  • GA Pest Employee Registration Exam Questions and Answers Fifra -Correct Answer-labeling Food quality protection act -Correct Answer-regulate pesticides through estab of tolerance levels for drinking water, residential, and dietary exposure Who registers all pesticides in GA -Correct Answer-EPA and Dept of Ag General Use Pesticide -Correct Answer-less likely to harm environ Restricted Use Pesticide -Correct Answer-only certified operator or someone under their supervision may apply Viola...
    (0)
  • $12.49
  • 2x sold
  • + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023

  • Exam (elaborations) • 10 pages • 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Estimating: The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off: The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities: Measured amounts of construction...
    (0)
  • $30.49
  • 3x sold
  • + learn more
MNB3702 ASSIGNMENT 1 SEMESTER 2 2024 A build-operate-transfer for an infrastructure project such as a bridge contract involves: a. The operation of the bridge as a for-profit venture, e.g. by collecting road toll. b. The ownership-transfer for the bridge
  • MNB3702 ASSIGNMENT 1 SEMESTER 2 2024 A build-operate-transfer for an infrastructure project such as a bridge contract involves: a. The operation of the bridge as a for-profit venture, e.g. by collecting road toll. b. The ownership-transfer for the bridge

  • Exam (elaborations) • 25 pages • 2024
  • MNB3702 ASSIGNMENT 1 SEMESTER 2 2024 A build-operate-transfer for an infrastructure project such as a bridge contract involves: a. The operation of the bridge as a for-profit venture, e.g. by collecting road toll. b. The ownership-transfer for the bridge at some specified point in the future. c. All of the above activities d. The construction of the bridge.
    (0)
  • $4.35
  • 1x sold
  • + learn more
Construction Contracts Midterm Study Guide (A+ Graded already)
  • Construction Contracts Midterm Study Guide (A+ Graded already)

  • Exam (elaborations) • 15 pages • 2024
  • this term means the management or handling of the business relations between parties to a contract - CORRECT ANSWER-contract administration this term refers to a much broader responsibility of relating to all project-related functions between the parties to a contract - CORRECT ANSWER-construction administration project delivery system is defined as... - CORRECT ANSWER-an approach to building the project team. an organizational concept which assigns specific responsibilities and authoriti...
    (0)
  • $7.99
  • + learn more
Construction Contracts 2024 Test Questions with Correct Answers
  • Construction Contracts 2024 Test Questions with Correct Answers

  • Exam (elaborations) • 29 pages • 2024
  • Construction Contracts 2024 Test Questions with Correct Answers Construction parties - Answer-owners- analysis, financing -(realty personnel for the parcel of land on market) -designer, a report describes the program requirements - construction docuemtn -contructors contructing procedures - Answer-General contract method, separate contracts, self-performance, design-build, professional construction management method construction management at risk (CM at risk) General contract m...
    (0)
  • $14.29
  • + learn more
AFSB 151  exam 2023 with 100% correct answers
  • AFSB 151 exam 2023 with 100% correct answers

  • Exam (elaborations) • 48 pages • 2023
  • Anthony is the surety producer for Coyle Construction (CC). CC has a pre-set annual surety credit line of $5 million/$30 million. About 3 months into the fiscal year, the contractor is bidding on an $8 million job and needs a bid bond. Which one of the following correctly describes Anthony's responsibility as the surety producer? Select one: A. Anthony should arrange a back-up surety with adequate capacity because CC appears to be outgrowing the capacity of the current surety. B. Anthony sho...
    (1)
  • $17.49
  • 1x sold
  • + learn more