Cm 4100 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cm 4100? On this page you'll find 56 study documents about Cm 4100.

Page 4 out of 56 results

Sort by

CM 4101 Midterm Exam Questions Solved 100% Correct
  • CM 4101 Midterm Exam Questions Solved 100% Correct

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • what is not true about an event - Answer an event usually consumes resources. an event usually takes time. major types of activities - Answer procurement, production/construction, management The conditions of limited resource availability dictate certain activities cannot be performed simultaneously. This is: - Answer resource constraint
    (0)
  • $11.49
  • + learn more
CM 4101 Exam Prep Test Questions Answered 100% Correct
  • CM 4101 Exam Prep Test Questions Answered 100% Correct

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Starting a new project in P6 you must first: - Answer File - Close All 3 Establishing Relationships - Answer Finish-to-start, Start-to-start, Finish-to-finish Finish-to-start (FS) - DEFAULT - Answer A finishes, B can start Start-to-start (SS) - Answer A starts, B can start
    (0)
  • $11.49
  • + learn more
Final Exam Guide for CM 4100 Exam 1 Questions and Verified Solutions
  • Final Exam Guide for CM 4100 Exam 1 Questions and Verified Solutions

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Final Exam Guide for CM 4100 Exam 1 Questions and Verified Solutions - CORRECT ANSWER- Activity - CORRECT ANSWER-I . usually takes time 2. may consume resources 3. usually has a start time and finish time 4. can be identified for planning, scheduling, monitoring and controlling the construction project ADM - CORRECT ANSWER-Arrow Diagramming Method (deterministic)
    (0)
  • $11.49
  • + learn more
CM 410 Final Exam Questions & Answers 100% Correct
  • CM 410 Final Exam Questions & Answers 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • *5 types of bonds* - ANSWERBid bond Performance bond Payment bond Warranty bond Green bond *A101* - ANSWERLUMP sum contract *A111* - ANSWERCOST OF THE WORK PLUS FEE *A121 CMc* - ANSWERCM @ Risk *A131 CMc* - ANSWERCM @ Management A141 - ANSWERDesign-build *A201* - ANSWERGeneral Conditions A401 - ANSWERAgreement between contractor and sub All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. Cove...
    (0)
  • $15.99
  • + learn more
CM 4100 Assignments
  • CM 4100 Assignments

  • Exam (elaborations) • 9 pages • 2024
  • CM 4100 Assignments
    (0)
  • $10.49
  • + learn more
CM 4100 Module 1-6 Quizzes
  • CM 4100 Module 1-6 Quizzes

  • Exam (elaborations) • 6 pages • 2024
  • CM 4100 Module 1-6 Quizzes
    (0)
  • $9.99
  • + learn more
ENAR 339 Building construction, Faculty of Engineering and  Technology (Types of Drawing) Lecture Notes Fall Series
  • ENAR 339 Building construction, Faculty of Engineering and Technology (Types of Drawing) Lecture Notes Fall Series

  • Exam (elaborations) • 26 pages • 2024
  • ENAR 339 Building construction, Faculty of Engineering and Technology (Types of Drawing) Lecture Notes Fall Series
    (0)
  • $16.39
  • + learn more
Practice Exam for CEE 4100 Test 2 Questions and Answers
  • Practice Exam for CEE 4100 Test 2 Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Practice Exam for CEE 4100 Test 2 Questions and Answers Actual Cost of Work Performed (ACWP) - CORRECT ANSWER-Actual work hours or dollars to date represent what has been paid Banks Evaluation - CORRECT ANSWER-Contractors = high risk, so loan only thru inventories and partially complete with high interest rate Bid estimate - CORRECT ANSWER-Contractor prepares estimate of job's cost with markup for profit Budgeted Cost at Completion (BCAC) - CORRECT ANSWER-original project estimate Budgeted...
    (0)
  • $14.49
  • + learn more