Cisec exam with - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cisec exam with? On this page you'll find 55 study documents about Cisec exam with.
Page 4 out of 55 results
Sort by
-
CISEC Exam 60 QUESTIONS WITH VERIFIED ANSWERS 2023-2024
- Exam (elaborations) • 18 pages • 2024
-
- $17.99
- + learn more
CISEC Exam 60 QUESTIONS WITH VERIFIED ANSWERS
-
CISEC Exam with complete solutions.
- Exam (elaborations) • 10 pages • 2024
-
- $7.99
- + learn more
CISEC Exam with complete solutions.
-
CISEC EXAM QUESTIONS 2024|2025 WITH GUARANTEED ACCURATE ANSWERS
- Exam (elaborations) • 19 pages • 2024
-
- $15.49
- + learn more
LDP - ACCURATE ANSWERS Land Developing Projects - altering landscape for projects such as agriculture or housing ect. 
 
NPDES - ACCURATE ANSWERS National Pollutant Discharge Elimination System 
 
- section of the CWA (Clean Water Act) to permit stormwater discharges associated w industrial activities PER permit 
 
CWA Penalty Types - ACCURATE ANSWERS Adminstrative 
Class I. Neglegent 
Class II. Knowlingly = greater fines 
 
What documents are required on site? - ACCURATE ANSWERS - SWPPP 
- CGP...
-
CISEC EXAM 2024|2025 WITH GUARANTEEED ACCURATE ANSWERS |VERIFIED
- Exam (elaborations) • 20 pages • 2024
-
- $15.89
- + learn more
When working in waterways or wetlands, which permit is required? - ACCURATE ANSWERS 404 Permit 
 
NPDES - ACCURATE ANSWERS National Pollutant Discharge Elimination System 
Section of CWA (Clean Water Act) to permit stormwater discharges associated with industrial activities per the permit 
 
CWA Penalty Types - ACCURATE ANSWERS Class I. Negligent 
Class II. Knowingly = Greater Fines 
 
What documents are required onsite? - ACCURATE ANSWERS SWPPP 
CGP 
Site Map 
Drawings and Key 
All inspection r...
-
CISEC Exam Question and answers already passed 2024
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
CISEC Exam Question and answers already passed 2024Stormwater control design goal - correct answer Minimize the discharge of pollutants in stormwater. 
 
SW control design factors - correct answer Expected amount and frequency of precipitation, soil type and range, flow from impervious surfaces, slopes, and BMPs to control flow rates. 
 
Erosion and sediment control requirements - correct answer Provide and maintain natural buffers and/or equivalent erosion and sediment controls for discharge...
Fear of missing out? Then don’t!
-
CISEC Exam-with 100% verified solutions-posted in 2023
- Exam (elaborations) • 12 pages • 2023
-
- $8.49
- + learn more
CISEC Exam-with 100% verified solutions-posted in 2023
-
CISEC EXAM SET WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
- Exam (elaborations) • 11 pages • 2024
-
- $13.49
- + learn more
Stormwater control design goal - ACCURATE ANSWERS Minimize the discharge of pollutants in stormwater. 
 
SW control design factors - ACCURATE ANSWERS Expected amount and frequency of precipitation, soil type and range, flow from impervious surfaces, slopes, and BMPs to control flow rates. 
 
Erosion and sediment control requirements - ACCURATE ANSWERS Provide and maintain natural buffers and/or equivalent erosion and sediment controls for discharges to any receiving waters located within 50 feet...
-
CISEC Exam 2023-2024 ACTUAL EXAM 70 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+
- Exam (elaborations) • 5 pages • 2024
-
- $11.49
- + learn more
CISEC Exam ACTUAL EXAM 70 
QUESTIONS AND CORRECT DETAILED 
ANSWERS WITH RATIONALES (VERIFIED 
ANSWERS) |ALREADY GRADED A+ 
Who can file a civil action per the CWA? - CORRECT ANSWER Any citizen 
Who can have a civil action filed against them? - CORRECT ANSWER Any person, 
the US, or other government agency, or the EPA 
When would a governor file a civil suit? - CORRECT ANSWER If there is a violation 
occurring in another state that is causing an adverse effect on the public health/welfare ...
-
CISEC Exam Questions With Verified Answers.
- Exam (elaborations) • 11 pages • 2024
-
- $12.49
- + learn more
CISEC Exam Questions With 
Verified Answers. 
When working in waterways or wetlands, which permit is required? - answer404 Permit 
NPDES - answerNational Pollutant Discharge Elimination System 
Section of CWA (Clean Water Act) to permit stormwater discharges associated with industrial 
activities per the permit 
CWA Penalty Types - answerClass I. Negligent 
Class II. Knowingly = Greater Fines 
What documents are required onsite? - answerSWPPP 
CGP 
Site Map 
Drawings and Key 
All inspection repo...
-
CISEC EXAM 2024| 150 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS| ALREADY PASSED AND GRADED A+
- Exam (elaborations) • 32 pages • 2024
-
- $12.49
- + learn more
CISEC EXAM 2024| 150 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS| ALREADY PASSED AND GRADED A+ 
T/F: The CGP states that inspections are to occur only during normal working hours - ANSWER--True 
T/F: the CGP does not mandate inspection of equipment storage and 
maintenance areas - ANSWER--False 
T/F: Since 1998, regulations require permits for Phase I (5 acres or more) projects. Since 2003, permits also required for Phase II (1 or more acres) projects - ANSWER--True 
T/F: Under the CWA, citizens c...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia