Bill of materials bom - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bill of materials bom? On this page you'll find 108 study documents about Bill of materials bom.

Page 4 out of 108 results

Sort by

WGU C215 QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS
  • WGU C215 QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • WGU C215 QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS ABC Classification - Answer ️️ -a method for determining level of control and frequency of review of inventory items Acceptable Quality Level (AQL) - Answer ️️ -The small percentage of defects that consumers are willing to accept. Acceptable Sampling - Answer ️️ -The process of randomly inspecting a sample of goods and deciding whether to accept the entire lot based on the results Action Bucket - Answer ️️ -The curren...
    (0)
  • $12.49
  • + learn more
SAP Certification Practice Exam 241 Questions with Verified Answers,100% CORRECT
  • SAP Certification Practice Exam 241 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 61 pages • 2024
  • SAP Certification Practice Exam 241 Questions with Verified Answers Which of the following control parameters determines the scope of the MRP run in SAP S/4HANA? - Processing key - Purchase requisition - Planned order - Planning mode - Schedule line - CORRECT ANSWER - Processing key What is the highest organizational unit in warehouse management? - Warehouse number - Storage selection - Storage bin - Storage type - CORRECT ANSWER - Warehouse number What happens when we post...
    (0)
  • $12.99
  • + learn more
ERP SAP 200 Questions with Verified Answers,100% CORRECT
  • ERP SAP 200 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 45 pages • 2023
  • ERP SAP 200 Questions with Verified Answers SAP ERP includes the following (2 are correct) a. SAP Customer Relationship Management b. SAP Supply Chain Management c. SAP NetWeaver d. SAP ECC Core - CORRECT ANSWER c. SAP NetWeaver d. SAP ECC Core The new capabilities included in an enhancement package focus on which of the following areas: (2 are correct) a. Simplification b. Extendibility c. Functionality d. Technical Delivery - CORRECT ANSWER a. Simplification c. Funt...
    (0)
  • $12.99
  • + learn more
MISY 5340 Chapter 6 question n answers graded A+ 2023/2024
  • MISY 5340 Chapter 6 question n answers graded A+ 2023/2024

  • Exam (elaborations) • 10 pages • 2023
  • MISY 5340 Chapter 6Which one of the following are key organizational data relevant to the production process? A. Company Code B. Credit Control Area C. Client D. Storage Location E. Plant - correct answer A C D E The master data relevant to the production process are A. Work Centers B. Material Masters C. Bill of Materials D. Client E. Company Code - correct answer A B C Which of the following are statuses that can apply to a BOM? A. On B. Off C. Active D. Inactive E....
    (0)
  • $17.99
  • + learn more
NCSC Practice Exam Questions and Answers 2023/2024 complete
  • NCSC Practice Exam Questions and Answers 2023/2024 complete

  • Exam (elaborations) • 17 pages • 2023
  • NCSC Practice Exam Questions and Answers 2023/2024 complete A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review. When should the consultant verify the make and model to prepare for the cluster deployment? A. Upon arriving on-site B. When reviewing the Statement of Work (SOW) C. During the Foundation process D. While conducting the Tech Review Call D. While conducti...
    (0)
  • $10.99
  • + learn more
APICS CPIM Part 1 Terms Questions With Correct Answers
  • APICS CPIM Part 1 Terms Questions With Correct Answers

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • economic order quantity formula - Answer Annual Carrying Cost=Annual Ordering Cost (order quantity/2) x cost per unit x carrying cost percentage=Annual Demand/Lot-Size Quantity x Cost per Order EOQ=Square Root (2AS/Ci)=Square Root of [(2 x Annual Demand x Cost per Order)/{Cost per Unit x Carrying Cost %)] 5 S's of Lean - Answer sort, set in order, shine, standardize, and sustain Hoshin planning - Answer Japanese strategic planning process in which a company develops up to four visio...
    (0)
  • $11.99
  • + learn more
MRP questions with 100% correct verified solution 2023
  • MRP questions with 100% correct verified solution 2023

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • MRP MRP is for - correct answer dependent demand dependent demand push strategy - correct answer MRP dependent demand pull strategy - correct answer Just in Time MRP - correct answer translates master production schedule into planned orders for actual parts and components needed to produce items according to the master schedule Info needed for MRP - correct answer bill of material, on hand inventory of each part or subassembly, lead time, outstanding orders for parts with expected d...
    (0)
  • $13.99
  • + learn more
GCSS-Army Smart Book - Unit Supply |Questions & correct answers
  • GCSS-Army Smart Book - Unit Supply |Questions & correct answers

  • Exam (elaborations) • 6 pages • 2024
  • Authorized To Forecast -The GCSS-Army Demand Analysis process which recommends additions to and deletions from the Authorized Stockage List (ASL). Base Unit -The management level of materials within a Sloc Batch -Serviceability of material (Condition Code) Bill of Materials (BOM) -The listing of authorized components by level according to the authoritative source documents
    (0)
  • $9.49
  • + learn more
Configuration in SAP Exam 43 Questions with Verified Answers,100% CORRECT
  • Configuration in SAP Exam 43 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 4 pages • 2023
  • Configuration in SAP Exam 43 Questions with Verified Answers Configuration in SAP - CORRECT ANSWER the process of tailoring SAP software by selecting specific functionality from a list of those supported by the software Master Data - CORRECT ANSWER - describes items or objects used in a business such as G/L accounts, materials, vendors, customers - remains in the system for a long period of time Transaction data - CORRECT ANSWER - used for relatively short periods of time, usually to...
    (0)
  • $10.99
  • + learn more
NCSC Practice Exam Questions and Answers 2023/2024 complete
  • NCSC Practice Exam Questions and Answers 2023/2024 complete

  • Exam (elaborations) • 17 pages • 2023
  • NCSC Practice Exam Questions and Answers 2023/2024 complete A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review. When should the consultant verify the make and model to prepare for the cluster deployment? A. Upon arriving on-site B. When reviewing the Statement of Work (SOW) C. During the Foundation process D. While conducting the Tech Review Call D. While conducti...
    (0)
  • $10.99
  • + learn more