Asme final - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Asme final? On this page you'll find 159 study documents about Asme final.

Page 4 out of 159 results

Sort by

Final Study for Massachusetts 1C  Hoisting License Exam Questions and  Correct Solutions
  • Final Study for Massachusetts 1C Hoisting License Exam Questions and Correct Solutions

  • Exam (elaborations) • 7 pages • 2024
  • Final Study for Massachusetts 1C Hoisting License Exam Questions and Correct Solutions What is the purpose of the 520:C.M.R.6:00 - CORRECT ANSWER-To establish rules and regulations for safety of the public What regulatory authority governs hoisting machinery - CORRECT ANSWER-520- C.M.R. 6:00 MGL chapter 146 section 53-54A What type of system is used when working on de-energized circuit - CORRECT ANSWER-Lock out tag out In event of death, department of public safety must how soon - C...
    (0)
  • $11.99
  • + learn more
Mae 1351  Questions and Answers 100% Verified
  • Mae 1351 Questions and Answers 100% Verified

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • a filet should be dimensioned as - radius An engineering drawing should specify the preferred method of manufacturing of the part - no ASME Y14.5 dimensioning rules - - every feature shall be explicitly and fully dimensioned leaving nothing to assumption - each necessary shall be shown; no redundant dimensions allowed - each dimension should have a tolerance (exception: stock) best practice is to dimension cylindrical features in the view where they show as - rectangles best practice to d...
    (0)
  • $7.99
  • + learn more
Codes Final Nerds Question and answers 2023/2024 verified to pass
  • Codes Final Nerds Question and answers 2023/2024 verified to pass

  • Exam (elaborations) • 7 pages • 2024
  • Codes Final Nerds Question and answers 2023/2024 verified to passA power plant is defined as one or more boilers generating steam at pressures in excess of - correct answer 103 kPa The vessel with the number ________ is registered in saskatchewan - correct answer CRN 123.31 To prevent water-hammer, _________ are installed at low points - correct answer steam traps Section VII "Rules for Care of Power Boilers" of the ASME code book are: - correct answer Suggest rules to promote safety ...
    (0)
  • $13.99
  • + learn more
Ky State Test Exam With 100% Correct Answers 2024
  • Ky State Test Exam With 100% Correct Answers 2024

  • Exam (elaborations) • 14 pages • 2024
  • Ky State Test Exam With 100% Correct Answers 2024 High pressure boiler - answergreater than 160psi and 250F Board of Pressure Vessel Rules (Board) consists of how many members? - answer7 Who is the chariman of the board? - answerChief Boiler Inspector Who appoints members of the board? - answerThe Governor What do the each of the 6 members represent? - answersteam operating engineer, rep from boiler/pressure vessel manufacturers, insurance company, rep of the boilermakers, pipe erecting ...
    (0)
  • $12.49
  • + learn more
Red Seal Prep 2 Questions and Answers Already Passed
  • Red Seal Prep 2 Questions and Answers Already Passed

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • Red Seal Prep 2 Questions and Answers Already Passed What type of valve is used for blow off Wye type or angle type globe What are hand holes and manways for on a mud drum Service and inspection Safety valves must be shipped and installed in a Upright position Where is the blow off line on the water to boiler On the mud drum When do you open the blowoff valve At low load Blow off vessel is designed for 30% max pressure for boilers above 300 psig National plumbing code of Canada requires ef...
    (0)
  • $9.99
  • + learn more
Codes Final Nerds correctly answered 2023/2024
  • Codes Final Nerds correctly answered 2023/2024

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • Codes Final NerdsA power plant is defined as one or more boilers generating steam at pressures in excess of - correct answer 103 kPa The vessel with the number ________ is registered in saskatchewan - correct answer CRN 123.31 To prevent water-hammer, _________ are installed at low points - correct answer steam traps Section VII "Rules for Care of Power Boilers" of the ASME code book are: - correct answer Suggest rules to promote safety in boiler operations In order to convey fluid...
    (0)
  • $12.99
  • + learn more
DC boilers final exam review 2024
  • DC boilers final exam review 2024

  • Exam (elaborations) • 17 pages • 2024
  • DC boilers final exam review 2024 The following considerations must be taken into account when designing a boiler except _________________. Unresponsive to sudden steam demands The code written by the American Society of Mechanical Engineers that governs and controls the types of materials, methods of construction and procedures used in the installation of boilers is the ____________________. ASME code _______________________ consist of the all parts of the boiler which are expo...
    (0)
  • $11.49
  • + learn more
NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED)
  • NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED) you are using a plumb line to check a rail for plumb. you find that at the top it measures 1" and at the bottom it measures 1 1/4". what does this tell you? (Ansa. the top of the rail needs to go towards the center b. the top of the rail needs to go toward the wall c. the bottom of the rail needs to go toward the wall you are plumbing rails on a high rise installation. what type of plumb line should you...
    (0)
  • $16.99
  • + learn more
PLTW - IED EOC Review Terms Questions And Answers With Latest Updates
  • PLTW - IED EOC Review Terms Questions And Answers With Latest Updates

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Innovation - An improvement of an existing technological product, system, or method of doing something. Invention - A new product, system, or process that has never existed before, created by study and experimentation. Design Brief - A written plan that identifies a problem to be solved, its criteria, and its constraints. The design brief is used to encourage thinking of all aspects of a problem before attempting a solution. Design Process - A systematic problem-solving strategy, with crit...
    (0)
  • $7.99
  • + learn more
PLTW - IED Final Exam  latest questions and answers all are correct graded A+
  • PLTW - IED Final Exam latest questions and answers all are correct graded A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Innovation - An improvement of an existing technological product, system, or method of doing something. Invention - A new product, system, or process that has never existed before, created by study and experimentation. Design Brief - A written plan that identifies a problem to be solved, its criteria, and its constraints. The design brief is used to encourage thinking of all aspects of a problem before attempting a solution. Design Process - A systematic problem-solving strategy, with crit...
    (0)
  • $7.99
  • + learn more