Aia contract documents - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Aia contract documents? On this page you'll find 174 study documents about Aia contract documents.
Page 4 out of 174 results
Sort by
-
NASCLA Business Law and Management Exam Questions With 100% Correct Answers | Latest Update 2024/2025 | Rated A+
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
NASCLA Business Law and Management Exam Questions With 100% Correct Answers | Latest Update 2024/2025 | Rated A+. Sole Proprietorship - Correct Answer-a business owned and 
managed by a single individual 
Simplest form to set up 
unlimited Liability 
Partnerships - Correct Answer-Business organizations in which 
two or more persons share responsibilities, costs, profits, and 
losses. 
C Corporations - Correct Answer-Corporations that have no 
restrictions on who owns their shares or the number o...
-
CDT Exam Prep 1-4 Questions With 100% Correct Answers 2024
- Exam (elaborations) • 36 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
CDT Exam Prep 1-4 Questions With 100% 
Correct Answers 2024 
Bidding documents are considered legal documents? 
▪ True. 
▪ False. - answerFalse 
Codes governing commercial construction and residential construction are different? 
▪ True. 
▪ False. - answerTrue 
The A/E usually hires a construction manager? - answerFalse 
The Owner, Contractor and A/E are parties to the construction agreement? 
▪ True. 
▪False. - answerFalse 
There are no differences between the AIA and EJCDC general ...
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
- Available in package deal
-
- $17.49
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
-
CMIT Practice Test | 100 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
The contract documents for a project should be written primarily to protect the interest of the CM. - 
False 
The owner, CM and Designer are less likely to be involved in disputes with the Contractor if a contract is 
awarded to the lowest bidder. - False 
Use of standard forms of agreement will always result in fewer disputes? - False 
After the owner accepts a cm's proposed GMP as contemplated by the CMAA CM at Risk Series 
documents, the responsibilities and duties of the CM are essentially ...
-
CMIT LATEST ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED GRADED A+
- Exam (elaborations) • 14 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
CMIT LATEST ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED GRADED A+ 
The contract documents for a project should be written primarily to protect the interest of the CM. 
False 
The owner, CM and Designer are less likely to be involved in disputes with the Contractor if a contract is awarded to the lowest bidder. 
False 
Use of standard forms of agreement will always result in fewer disputes? 
False 
After the owner accepts a cm's proposed GMP as contemplated by the CMAA CM at Risk Seri...
Make study stress less painful
-
AIA contract document A201 - Study Set
- Exam (elaborations) • 18 pages • 2024
-
- $9.99
- + learn more
AIA contract document A201 - Study Set 
 
A201 covers what information? - General conditions of the contract for construction. 
 
According to section 1.1.1 what are acceptable modifications to the contract issued after 
execution? - 
1) A written amendment to the contract signed by both parties 
2) A change order 
3) A construction change directive 
4) A written order for a minor change in work issued by the architect. 
 
What items do the contract documents not include? - Advertisement or inv...
-
CDT Exam Prep chapter 1-4 Questions and Elaborated Answers
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $16.99
- + learn more
CDT Exam Prep chapter 1-4 Questions 
and Elaborated Answers 
Bidding documents are considered legal documents? 
▪ True. 
▪ False. - CORRECT ANSWER-False 
Codes governing commercial construction and residential construction are different? 
▪ True. 
▪ False. - CORRECT ANSWER-True 
The A/E usually hires a construction manager? - CORRECT ANSWER-False 
The Owner, Contractor and A/E are parties to the construction agreement? 
▪ True. 
▪False. - CORRECT ANSWER-False 
There are no differenc...
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 42 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - answerAnswer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usually bound wit...
-
CDT Exam Prep | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 17 pages • 2024
-
- $10.49
- + learn more
Which of these documents, might we find in the Project Manual but they are not contract documents? 
A. The Agreement 
B. Procurement Requirements 
C. Addendum 
D. Supplemental Conditions - B 
Before a model building code can become the building code for a jurisdiction, it has to be adopted by? 
A. Authority Having Jurisdiction 
B. State Government 
C. Building Inspector 
D. International Organization for Standardization - A 
The Construction Manager is hired by this entity? 
A. General Contracto...
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 42 pages • 2024
-
- $14.49
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - answerAnswer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usually bound wit...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia