Aci concr Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aci concr? On this page you'll find 1114 study documents about Aci concr.

Page 4 out of 1.114 results

Sort by

ACI Concrete Questions with Complete Solutions
  • ACI Concrete Questions with Complete Solutions

  • Exam (elaborations) • 18 pages • 2024
  • ACI Concrete Questions with Complete Solutions
    (0)
  • $15.49
  • + learn more
ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version
  • ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obta...
    (0)
  • $14.49
  • + learn more
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions with Answers
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions with Answers

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions with Answers ASTM C1064 - Answer- Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - Answer- 3 inches [75 mm] C1064, Sec. 8.1 The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± _...
    (0)
  • $13.49
  • + learn more
ACI Concrete Field Testing Technician - Grade 1 (18)100% Accurate (RATED A)
  • ACI Concrete Field Testing Technician - Grade 1 (18)100% Accurate (RATED A)

  • Exam (elaborations) • 21 pages • 2024
  • ASTM C1064 - ANSWER Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - ANSWER 3 inches [75 mm] C1064, Sec. 8.1 The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± ____ °F (± ____ °C) throughout a range of ____ °F ( ____ °C). - ANSWER ±1 °F...
    (0)
  • $14.99
  • + learn more
ACI Concrete Strength Testing Technician CP-19 Questions with Complete solutions
  • ACI Concrete Strength Testing Technician CP-19 Questions with Complete solutions

  • Exam (elaborations) • 14 pages • 2024
  • ACI Concrete Strength Testing Technician CP-19 Questions with Complete solutions
    (0)
  • $12.99
  • + learn more
ACI Certification: Concrete Flatwork Tech and Flatwork Finisher (2nd Ed.)2024/2025
  • ACI Certification: Concrete Flatwork Tech and Flatwork Finisher (2nd Ed.)2024/2025

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification: Concrete Flatwork Tech and Flatwork Finisher (2nd Ed.) finishing foreman - correct answer (Ch. 1, #1) It is important that the _______ _______ read and understand project specifications 100 - correct answer (Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the producer's rate should be about ____ yd^3(m^3) per hour. False (sold by volume) - correct answer (Ch 1, #3) True or False: Concrete is sold by the ton. pump, place, and finish - ...
    (0)
  • $19.99
  • + learn more
ACI Concrete Field-Testing Technician- Grade I Actual Questions and Answers 100% Correct | Updated 2024
  • ACI Concrete Field-Testing Technician- Grade I Actual Questions and Answers 100% Correct | Updated 2024

  • Exam (elaborations) • 19 pages • 2024
  • ACI Concrete Field-Testing Technician- Grade I Actual Questions and Answers 100% Correct | Updated 2024
    (0)
  • $13.99
  • + learn more
ACI Concrete Field-Testing Technician- Grade I Correct Questions & Solutions
  • ACI Concrete Field-Testing Technician- Grade I Correct Questions & Solutions

  • Exam (elaborations) • 11 pages • 2024
  • ACI Concrete Field-Testing Technician- Grade I Correct Questions & Solutions ACI Concrete Field-Testing Technician- Grade I Correct Questions & Solutions ACI Concrete Field-Testing Technician- Grade I Correct Questions & Solutions The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ...
    (0)
  • $11.49
  • + learn more