What is rework Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about What is rework? On this page you'll find 644 study documents about What is rework.

Page 3 out of 644 results

Sort by

EAWS Board Unit Specific exam 2024 with 100% correct answers
  • EAWS Board Unit Specific exam 2024 with 100% correct answers

  • Exam (elaborations) • 28 pages • 2024
  • Explain the purpose of the AIRSpeed program. To enhance the effectiveness of naval aviation by implementing Continuous Process Improvement (CPI) methods to improve quality and productivity. What are three CPI methods? -Lean -Six Sigma -Theory of Constraints(ToC) Brainpower Read More 0:04 / 0:15 Describe the Lean method To expose waste to balance operational and standard workflows by incremental improvements at a time. The goal is to achieve perfection through the total ...
    (0)
  • $17.49
  • + learn more
RAC Practice Exam 2 -HJ Questions & Answers
  • RAC Practice Exam 2 -HJ Questions & Answers

  • Exam (elaborations) • 63 pages • 2023
  • Available in package deal
  • RAC Practice Exam 2 -HJ Questions & Answers You work for a German-based device manufacturer (Company A) that produces a power supply based on a US-based medical device company's (Company B) design. The power supply is imported into your company's US-based manufacturing site (Company C) for further processing and then sent to the USbased medical device company (Company B) for final assembly. Which company needs to register with FDA: A. Company A B. Company B C. Company A &B D. Compa...
    (0)
  • $17.99
  • + learn more
Lean Six Sigma Yellow Belt Quiz Questions and Answers
  • Lean Six Sigma Yellow Belt Quiz Questions and Answers

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • Who is the founding father of Lean? a) Henry Ford b) Frederick Taylor c) Taiichi Ohno d) Frank Gilbert - Answer-c What does DMAIC stand For? a) Define Measure Analysis Improve Control b) Define Measure Analyze Implement Confirm c) Define Measure Analyze Implement Control d) Define Measure Analyze Improve Control - Answer-d Which of the following happens in the define phase? a) Implement the solution b) Test potential root causes c) Establish baseline performance d) Define customer ...
    (0)
  • $7.99
  • + learn more
PMK-EE E4 EXAM ALL SECTIONS 2024-2025 QUESTION AND ANSWERS GRADED A
  • PMK-EE E4 EXAM ALL SECTIONS 2024-2025 QUESTION AND ANSWERS GRADED A

  • Exam (elaborations) • 16 pages • 2024
  • Which of the following awards are worth 3 award points towards the advancement exam? -Correct Answer Navy and Marine Corps Commendation Medal With the exception of books and registration fees, what education and program is fully funded by the Navy? -Correct Answer Program for afloat college education Petty officer third class wants to transfer to shore duty in San Diego. What duty type will he be assigned? -Correct Answer 1 To become eligible for basic allowance for housing (BAH) at the...
    (0)
  • $13.49
  • + learn more
API-510 Closed Book (Verified on test) Questions with Verified Solutions
  • API-510 Closed Book (Verified on test) Questions with Verified Solutions

  • Exam (elaborations) • 89 pages • 2024
  • Available in package deal
  • API-510 Closed Book (Verified on test) Questions with Verified Solutions If a welder has qualified in the shielded metal arc welding, submerged arc welding, and gas tungsten arc welding processes but has welded in only one of them, qualification for the other 2 processes remains valid: A: for 6 months B: for 1 year C: for 2 years D: Indefinitely A: for 6 months One purpose of reviewing previous inspection reports is to ensure that: A: Estimated corrosion rates for new equipment are...
    (0)
  • $11.99
  • + learn more
Naval Aviation Maintenance Program
  • Naval Aviation Maintenance Program

  • Exam (elaborations) • 10 pages • 2024
  • Naval Aviation Maintenance Program What is the objective of the NAMP? - To achieve and continually improve aviation material readiness and safety standards with the optimum use of manpower, material, facilities, and funds. What does NAMP stand for? - Naval aviation maintenance program Who is overall in charge of the NAMP? - CNO Who is the head of the maintenance department? - Maintenance officer Who is responsible for manpower management in the maintenance department? - Assistant...
    (0)
  • $9.99
  • + learn more
CAPM Study Questions and Answers Graded A 2024
  • CAPM Study Questions and Answers Graded A 2024

  • Exam (elaborations) • 15 pages • 2024
  • The 80/20 rule is called? - Pareto principle What are the three costs of quality? - Pevention, Appraisal, and Failure Project Managers spend <> amount of time communicating? - 90 percent You are the project manager on a software project in the requirements phase. The project team consists of you, two business analysts (BA's), a UX architect and a database architect. At the end of the requirements phase, you replace the two BA' with four developers and two testers. How many more ...
    (0)
  • $14.49
  • + learn more
Salesforce Business Analyst Certification Exam - Questions and Answers
  • Salesforce Business Analyst Certification Exam - Questions and Answers

  • Exam (elaborations) • 14 pages • 2024
  • Salesforce Business Analyst Certification Exam - Questions and Answers What's a proven way to help executives understand how new processes or products can enable change? A. Thoroughly describe the system configuration details. B. Keep the conversation strictly focused on what the existing system can do. C. Describe how the system can enable business innovation and help customers. (Framing the discussion around innovation and helping customers is the most likely way to motivate executives to e...
    (0)
  • $18.49
  • + learn more
Lean Bronze Exam
  • Lean Bronze Exam

  • Exam (elaborations) • 9 pages • 2024
  • 2.Given this data set, whats the first pass yield (FPY)? Good pieces = 88 Scrap pieces = 10 Rework pieces = 2 Machine Uptime= 90% - Answer - (100-12)/100=88 3. Which of the following is not a core element of the Toyota Production System? - Answer - Statistical Process Control 4. A tool used to implement a pull system is a ______ - Answer - Kanban 5. The first step in value stream mapping is always to: - Answer - Identify the customer and define value 6. Batch Processing often...
    (0)
  • $11.99
  • + learn more
API 1169 Study Test Questions Test RM  2 Already Passed
  • API 1169 Study Test Questions Test RM 2 Already Passed

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • API 1169 Study Test Questions Test RM 2 Already Passed According to OSHA a "protective system" is defined as: Method of protecting employees from cave-ins. Design and development inputs shall be identified and reviewed for? Accuracy, completeness and lack of conflict The Excavator calls the One Call Center prior to excavation at least Two working days nor more than ten working days Encroachment Area is the area where the ground disturbance occurs within: 50 feet of the cente...
    (0)
  • $9.99
  • + learn more