What is a subpanel Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about What is a subpanel? On this page you'll find 87 study documents about What is a subpanel.
Page 3 out of 87 results
Sort by
-
Electrician's Licensing Exam Questions and Answers
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Electrician's Licensing Exam Questions and Answers 
NEC Article ______ defines breakers and fuses. -Answer-According to NEC Article 100, 
a device that opens and closes a circuit by nonautomatic means automatically closes 
for a predetermined overcurrent. 
Annex _____ of NEC covers conduit fill. -Answer-Annex C of NEC covers conduit and 
tubing fill for conductors and fixture wire fill. 
NEMA stands for National Electrical Manufacturers Association -Answer-True - NEMA 
is the acronym for Nation...
-
Residential Wireman Electrician's Licensing Exam Already Solved 100%
- Exam (elaborations) • 23 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
NEC Article ______ defines breakers and fuses. - Answers According to NEC Article 100, a device that opens and closes a circuit by nonautomatic means automatically closes for a predetermined overcurrent. 
 
Annex _____ of NEC covers conduit fill. - Answers Annex C of NEC covers conduit and tubing fill for conductors and fixture wire fill. 
 
NEMA stands for National Electrical Manufacturers Association - Answers True - NEMA is the acronym for National Electrical Manufacturers Association. 
 
Wha...
-
AHIT Final Exam Questions and Answers | 100% Verified and Updated 2024
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
AHIT Final Exam Questions and Answers | 
100% Verified and Updated 2024 
When should the home inspector not remove the cover (dead-front) to the main panel? -Correct 
Answer-if the inspector gets a shock upon touching it 
What is a subpanel? -Correct Answer-a panel that adds more circuits to the service 
When inspecting the fuses or breakers, the home inspector should _____. -Correct Answer- 
compare amperage rating of fuse or breaker to connected branch wiring 
Where is the home inspector likel...
-
AHIT Final Exam Study Questions and Answers Graded A 2024 With Complete Verified Solutions
- Exam (elaborations) • 7 pages • 2024
-
- $11.99
- + learn more
When should the home inspector not remove the cover (dead-front) to the main panel? - if the inspector gets a shock upon touching it 
 
What is a subpanel? - a panel that adds more circuits to the service 
 
When inspecting the fuses or breakers, the home inspector should _____. - compare amperage rating of fuse or breaker to connected branch wiring 
 
Where is the home inspector likely to find aluminum branch circuit wiring? - in homes built during the mid-1960s to mid-1970s 
 
***Electrical re...
-
GROUNDING AND BONDING, LEVEL 2 LESSON 3
- Exam (elaborations) • 5 pages • 2024
-
- $11.49
- + learn more
A(n) ? is a premises wiring system where power is derived from a source of electric energy or equipment other than a service. Such systems have no direct connection from circuit conductors of one system to circuit conductors of another system, other than those established through bonding or grounding connections. - Answer-separately derived system 
 
Which of the following is typically not a separately derived system? - Answer-a. Autotransformer with a grounded conductor common to both the prima...
Get paid weekly? You can!
-
AHIT Practice Test Questions With Correct Answers
- Exam (elaborations) • 23 pages • 2024
-
- $10.99
- + learn more
When should the home inspector not remove the cover (dead-front) to the main panel? 
 if the inspector gets a shock upon touching it 
 if the inspector's customer is present 
 if the meter is inside the building 
 if there are multiple panels - Answer If the inspector gets a shock upon touching it 
 
What is a subpanel? 
 a panel housing the main disconnect for the service 
 a panel that adds more circuits to the service 
 a panel that adds more power to the service 
 a second main panel in ...
-
AHIT Final Exam 2024
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
AHIT Final Exam 2024 
When should the home inspector not remove the cover (dead-front) to the main panel? - 
Answer-if the inspector gets a shock upon touching it 
What is a subpanel? - Answer-a panel that adds more circuits to the service 
When inspecting the fuses or breakers, the home inspector should _____. - Answer-compare 
amperage rating of fuse or breaker to connected branch wiring 
Where is the home inspector likely to find aluminum branch circuit wiring? - Answer-in homes 
built during...
-
AHIT Final Exam Questions With100% Accurate Answers Latest Version
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
When should the home inspector not remove the cover (dead-front) to the main panel? - CORRECT ANSWER-if the inspector gets a shock upon touching it 
 
What is a subpanel? - CORRECT ANSWER-a panel that adds more circuits to the service 
 
When inspecting the fuses or breakers, the home inspector should _____. - CORRECT ANSWER-compare amperage rating of fuse or breaker to connected branch wiring 
 
Where is the home inspector likely to find aluminum branch circuit wiring? - CORRECT ANSWER-in homes...
-
NHIE Electrical Study Session 19 Questions with Correct Answers
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
NHIE Electrical Study Session 19 Questions with Correct Answers 
 
What does a service drop drip loop prevent? - Answer- water entering the meter base and panel 
 
A subpanel in a detached building has melted insulation on a neutral conductor. What is the most likely cause of this condition? - Answer- The neutral conductor is loose at the terminal bar 
 
The current MINIMUM service requirement for a new single family home is: - Answer- 100 amps 
 
This panel appears to be (panel with a ton of w...
-
EVITP: Load calculation Feeders and services Level 4 Module Exam Set Questions And Correct Revised Answers | Updated!!
- Exam (elaborations) • 6 pages • 2024
-
- $12.99
- + learn more
EVITP: Load calculation Feeders 
and services Level 4 Module Exam 
Set Questions And Correct Revised 
Answers | Updated!! 
 
When calculating the service requirement for a particular 
building, the step is to - ANSWER 
35 
determine the floor area 
of the building 
What is the feeder ampacity for a three-phase, 120/208V 
subpanel with a connected load of 84,563VA? - ANSWER 
235A 
Which part of a residential lighting and small appliance load 
must be rated at 35% for servives...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia