Ust installer - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Ust installer? On this page you'll find 34 study documents about Ust installer.
Page 3 out of 34 results
Sort by
-
UST Installer Exam Questions and Complete Solutions Graded A+.
- Exam (elaborations) • 20 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
UST Installer Exam Questions and Complete Solutions Graded A+.
-
Kentucky UST Certification Test Questions With Correct Answers | Latest Update 2023/2024 (100% Verified)
- Exam (elaborations) • 43 pages • 2023
-
- $24.49
- + learn more
If both pea gravel and sand are used as backfill in the same excavation what 
material should be used to prevent migration of sand fines into voids in the 
pea gravel - correct answers Filter Fabric 
if a bottom hold down pad is used as a means of anchoring the tank what is 
the minimum distance the pad should extend beyond the sides and ends of 
the tank? - correct answers 18 inches Beyond each side and 12 inches 
Beyond each end 
Kentucky UST Certification Test Prep Exam Questions 
Verified An...
-
Class A/B Operator for Underground Storage Tank Questions And Answers Graded A+
- Exam (elaborations) • 7 pages • 2024
-
- $9.39
- + learn more
Class A/B Operator for Underground Storage Tank 
 
 
 
 
 
The Class A and Class B certification must be renewed every: - ANS 5 years 
 
UST financial responsibility requirements apply to what? - ANS 600 gallon used oil tank 
 
Secondary Containment is required for what? - ANS New UST Systems, Piping in contact with the ground, and Replacement UST 
 
A Class A operator shall maintain the records of UST site inspections for a *minimum* of: - ANS 3 years 
 
New owners o...
-
UST Installer Exam Questions and Complete Solutions Graded A+.
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
UST Installer Exam Questions and Complete Solutions Graded A+.
-
WA UST Site Assessor Exam Questions With Answers Rated A+
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $10.39
- + learn more
WA UST Site Assessor Exam 
 
 
 
What is the hold time for soil and preserved GW GRO samples? - ANS 14 days 
 
Is an ICC certification needed to install an AST? - ANS No 
 
Flammability limits of gasoline - ANS 1.4 to 7.6% 
 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? - ANS 30 days 
 
MTCA Method A lead CUL, soil - ANS 250 mg/kg 
 
MTCA Method A lead CUL, GW - ANS 15 ug/L 
 
Is the vadose zone saturated or unsatur...
As you read this, a fellow student has made another $4.70
-
Definitions - UST Exam correct 100%
- Exam (elaborations) • 30 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: 
a.) The Regional Water Quality Board 
b.) The State Water Resources Control Board 
c.) The Department of Toxic Substance Control 
d.) The local agency - Answer a.) The Regional Water Quality Board 
CCR Title 23, Sec 2681(a) 
 
The regulations to enforce compliance of underground storage tank systems in the state are found in? 
a.) Code of Federal Regulations, 40 CFR Part 281 
b.)...
-
U1 ust installer/retrofitters Exam Questions And Correct Revised Answers
- Exam (elaborations) • 4 pages • 2024
-
- $10.49
- + learn more
U1 ust installer/retrofitters Exam Questions 
And Correct Revised Answers 
When a bottom hold down pad is used under a steel tank. - answerthe bedding material may 
be reduced to 6" 
cover in areas that are subject to vehicle traffic - answer30" compacted backfill and 6" of 
asphaltic concrete, or 18" of compacted backfill and 6 to 8" of reinforced concrete. paving over 
tanks in traffic areas should extend 1 foot beyond tank perimeter. 
- answer 
cover in non traffic areas should be atleas...
-
u1 ust installer/retrofitters TEST Questions and 100% Correct Solutions
- Exam (elaborations) • 6 pages • 2024
-
- $10.49
- + learn more
construct wells of factory slotted PVC or coated metallic pipe with 0.020-inch openings and 
allow water or released product to flow freely into the well. - Ans observation well must be 1 
t0 2' below the bottom of the tank. monitoring well must be 5' below water table to a 
maximum of 5'. 
provide atleast 6" of clearance between piping and electrical conduits. seperate the piping by 
atleast twice the size of the piping diameter. provide atleast 6" between piping g and the 
excavation wall...
-
UST certification exam 2023 -Solved
- Exam (elaborations) • 6 pages • 2023
-
- $10.99
- + learn more
site check - ANSWER-the investigation of an UST site for the presence of a release when evidence indicates that a release may have occurred, but existence is not confirmed 
 
site assessment - ANSWER-an investigation to determine if a release has occurred 
 
what situations require a site check? - ANSWER-1. contamination from regulated substance discovered at UST site that is not permanently closed (discovery of regulated substance or its constituents) 
2. if contamination is discovered off-sit...
-
u1 ust installer_retrofitters
- Exam (elaborations) • 4 pages • 2024
-
- $9.34
- + learn more
u1 ust installer_retrofitters
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia