Tie line frequency bias - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Tie line frequency bias? On this page you'll find 205 study documents about Tie line frequency bias.
Page 3 out of 205 results
Sort by
-
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+)
- Exam (elaborations) • 69 pages • 2024
-
- $17.49
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+) The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
...
-
Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers.
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers. 
The Reliability Coordinator just informed you of a slow time error correction which will 
begin at the top of the next hour. Your EMS system will not let you change your 
scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action 
should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decreas...
-
NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024 SCORE A+
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST SCORE A+. Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and it...
-
PJM 191Test Questions And Answers
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
Which of the following balancing control modes is used by PJM under normal operations? - ️️Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - ️️Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - ️️Dynamic Instability 
 
If PJM experienced an event that caused the loss of a ...
-
NERC Class| 98 questions| with complete solutions
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
NERC Class| 98 questions| with complete solutions 
Frequency Bias and Jointly Owned Units (JOU) Answer-BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their bias setting. 
 
Frequency Bias and BA frequency response Answer-BAs must maintain a frequency bias that is equal to or greater than the BA frequency response. 
If the frequency bias is less...
And that's how you make extra money
-
NERC text questions & Answers(Latest Update 2024) 100% correct
- Exam (elaborations) • 23 pages • 2024
-
- $12.99
- + learn more
NERC text questions & Answers(Latest UpdaOperating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - ANSWER D. Interruptible loads 
 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complying with DCS as if it was a single control area 
B. Proving regulation service for neighboring RSGs 
C. Ensuring each control area in the group maintains 50% blackstart capability 
D. Complying with...
-
NERC book quiz with correct answers graded A+
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $9.99
- + learn more
NERC book quiz with correct answers graded A+ 
 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent interchange 
 
Suppose your interconnection operators at ...
-
PJM Test exam 2024 with 100% correct answers
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $17.49
- + learn more
Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - correct answer Dynamic Instability 
 
If PJM experienced an...
-
NERC Class with Complete Solution Rated A+
- Exam (elaborations) • 14 pages • 2023
-
Available in package deal
-
- $9.49
- + learn more
NERC Class with Complete Solution Rated A+ 
 
Frequency Bias and Jointly Owned Units (JOU) -Answer BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their bias setting. 
 
Frequency Bias and BA frequency response -Answer BAs must maintain a frequency bias that is equal to or greater than the BA frequency response. 
If the frequency bias is less th...
-
PJM Test Questions with 100% Correct Solutions
- Exam (elaborations) • 40 pages • 2024
-
- $13.49
- + learn more
PJM Test Questions with 100% Correct Solutions 
Which of the following balancing control modes is used by PJM under normal 
operations? - Correct Answer ️️ -Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? - Correct Answer ️️ -Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to PJM for generating units 
EXCEPT: 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - Corr...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia