Temporary stabilization - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Temporary stabilization? On this page you'll find 747 study documents about Temporary stabilization.
Page 3 out of 747 results
Sort by
-
Cesswi 2|88 Questions with 100% Correct Answers | Verified | Latest Update And Verified
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Temporary stabilization - ️️stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
 
5 types of plans - ️️1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
 
SWPPP - ️️-required by NPDES for industrial, multi sector, and construction general permits 
-addresses op...
-
Naslca Virginia Exam Practice Questions and Answers Top Graded 2024
- Exam (elaborations) • 16 pages • 2024
-
- $13.99
- + learn more
What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. 
 
All Class A contractor licensure applications MUST include - information on the knowledge, skills, and abilities of the applicant. 
 
What is the PRIMARY purpose of licensing? - Protect the health and welfare of the public. 
 
When a claimant is paid funds from the Contractors Recovery Trust Fund - the contractor...
-
Nicet Highway Construction Level 3: Exam Review Questions and answers, rated A+/
- Exam (elaborations) • 44 pages • 2024
-
Available in package deal
-
- $10.49
- + learn more
Nicet Highway Construction Level 3: 
Exam Review Questions and answers, 
rated A+/ 
What is Mechanically Stabilized Earth (MSE)? 
A Mechanically Stabilized Earth (MSE) retaining wall is a composite structure consisting of alternating 
layers of compacted backfill and soil reinforcement elements, fixed to a wall facing 
What is A Mechanically Stabilized Earth (MSE) derived from? 
The stability of the wall system is derived from the interaction between the backfill and soil 
reinforcements, inv...
-
Cesswi 2 Study Questions With Complete Solutions.
- Exam (elaborations) • 12 pages • 2023
-
Available in package deal
-
- $12.99
- + learn more
Temporary stabilization correct answer: stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
 
5 types of plans correct answer: 1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
 
SWPPP correct answer: -required by NPDES for industrial, multi sector, and construction gen...
-
CESSWI II EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 2 pages • 2024
-
- $8.49
- + learn more
What are targeted pollutants of temporary stabilization? - Answer-Sediment, hydrocarbons, metals, hazardous/toxic waste 
 
What is tree protection? - Answer-A temporary or permanent structural BMP that minimizes the potential of removing or injuring those trees 
 
What are baffles? - Answer-Structural BMPs designed to lengthen the flow path of basins/traps/ponds as well as slowing, calming, and distributing the flow in these devices, thus allowing pollutants more time to fall out of suspension 
...
Too much month left at the end of the money?
-
WALMART - STORMWATER EXAM
- Exam (elaborations) • 2 pages • 2024
-
- $8.49
- + learn more
The 1970's law that set into place the regulation of stormwater is: - Answer- The Clean Water Act 
 
Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - Answer- NPDES 
 
Which of the following is never an allowable stormwater discharge from a construction site? - Answer- Discharge from contaminated groundwater 
 
The Notice of termination can filed when: - Answer- All construction activity, inside and outside the building, is complete...
-
Psychiatric Mental Health Nursing 8th edition by Shelia Videbeck Test Bank , All Chapter Covered 1-24 | Complete Guide A+
- Exam (elaborations) • 342 pages • 2023
-
- $11.99
- 2x sold
- + learn more
Psychiatric Mental Health Nursing 8th edition by Shelia Videbeck Test Bank , All Chapter Covered 1-24 | Complete Guide A+: UNIT 1 Current Theories and Practice • 1. Foundations of Psychiatric–Mental Health Nursing • 2. Neurobiologic Theories and Psychopharmacology • 3. Psychosocial Theories and Therapy • 4. Treatment Settings and Therapeutic Programs UNIT 2 Building the Nurse–Client Relationship • 5. Therapeutic Relationships • 6. Therapeutic Communication • 7. Client’s Respo...
-
Virginia Contractor's State Certification Exam (2024) || With 100% Correct Solutions
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $10.00
- + learn more
Virginia Contractor's State Certification Exam (2024) || With 100% Correct Solutions 
Virginia Contractor's State Certification Exam (2024) || With 100% Correct Solutions 
 
Who is to be in charge of a local building department? - ANSWER - Building official. 
 
An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST be made to the local building board within a MAXIMUM of how many days? - ANSWER - 90 days. 
 
A building official MUST issue a certi...
-
CESSWI Exam Questions And Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
CESSWI Exam Questions And Answers 
 
 
Temporary stabilization - ANS stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
 
5 types of plans - ANS 1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
 
SWPPP - ANS -required by NPDES for industrial, multi sector, and ...
-
Naslca Virginia Exam Practice Questions with Certified Solutions
- Exam (elaborations) • 30 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Naslca Virginia Exam Practice Questions 
 
with Certified Solutions 
 
What is the MAXIMUM penalty for a contractor who undertakes work without the proper class 
of license? $500 fine per day for each day of violation plus penalties for a misdemeanor. 
 
All Class A contractor licensure applications MUST include information on the knowledge, 
skills, and abilities of the applicant. 
 
What is the PRIMARY purpose of licensing? Protect the health and welfare of the public. 
 
When a claimant is pa...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia