Rigging test questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Rigging test questions? On this page you'll find 381 study documents about Rigging test questions.

Page 3 out of 381 results

Sort by

Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers
  • Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers The main connection fitting for chain slings is the - ANS master link To form an endless-loop web sling, you must ----------- the ends together - ANS splice A ---------- is the distance it takes for one strand of wire rope that makes a complete turn around the core. - ANS one-rope lay A pulley system that has a mechanical advantage for lifting a load is a - ANS hoist A -------------- is...
    (0)
  • $8.49
  • 1x sold
  • + learn more
Boilermaker test UPS Exam Questions And Answers
  • Boilermaker test UPS Exam Questions And Answers

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Boilermaker test UPS Exam Questions And Answers When working on an exchanger tube side hydro test, the - ANS CHANNEL HEAD How many bolts need to be removed from a 12 bolt flange when installing gasket? - ANS 5 One of the main factors to consider when installing an orifice plate is: - ANS Direction of flow When cutting a stud bolt, which end of the bolt should be saved? - ANS - STAMPED - STENCILED - MARKED The method of pulling and rigging out an exchanger bundle witho...
    (0)
  • $10.99
  • 1x sold
  • + learn more
Rigging Test Questions With Solved Solutions Already Passed.
  • Rigging Test Questions With Solved Solutions Already Passed.

  • Exam (elaborations) • 8 pages • 2024
  • operator - Answer a signal person must be provided when the point of operation, meaning the load travel or the area near or at load placement is not in full view of the: dedicated spotter - Answer when the equipment is travelling and the view in the direction of travel is obstructed, a ____________ must be provided notify the crane who the signal is for - Answer For each signal, prior to giving the function/direction, the signal person must: signal person, operator, lift direct...
    (0)
  • $9.69
  • + learn more
Advanced Rigging Test Questions and Answers 100% Correc
  • Advanced Rigging Test Questions and Answers 100% Correc

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • the operational quadrant between the left-or-right-side outriggers is - ANSWER over-the-side cranes are typically built to be - ANSWER longer than they are wide in a multiple-crane lift, the crane with the greatest net capacity must always be - ANSWER closest to the loads center of gravity
    (0)
  • $11.99
  • + learn more
Advanced Rigging Test Questions And Answers Solved 100% Correct!!!
  • Advanced Rigging Test Questions And Answers Solved 100% Correct!!!

  • Exam (elaborations) • 3 pages • 2024
  • Advanced Rigging Test Questions And Answers Solved 100% Correct!!!
    (0)
  • $9.49
  • + learn more
Boilermaker NCCR Test   Questions And Answers
  • Boilermaker NCCR Test Questions And Answers

  • Exam (elaborations) • 10 pages • 2024
  • Boilermaker NCCR Test Questions And Answers Boilermaker NCCR Test 1 ft 3-3/4 in + 2 ft 1-1/16 in +5 ft 10- 7/8 in = - ANS 9 ft 3-11/16 in A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be adjusted over 15 PSI? - ANS Acetylene is unstable above this pressure A big control valve is pulled who is responsible for the rigging? - ANS Crane operator and rigger A boiler maker must have all of the following wh...
    (0)
  • $10.99
  • 2x sold
  • + learn more
Advanced rigging test 2 Questions with CompleteSolutions
  • Advanced rigging test 2 Questions with CompleteSolutions

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • Advanced rigging test 2 Questions with CompleteSolutions 1) What is meant by the term "two blocking - Correct Answer The load block contacts the boom point sheaves. 2) lifting 20,000lbs, with a 2-leg bridle sling at a 30 horizontal sling angle, what is force applied to each leg? - Correct Answer 20,000 3) In multiple crane lifts using an equalizer beam, the weight of the beam should be considered: - Correct Answer Part of the load weight 4) What is required if there is a deviation in ...
    (0)
  • $9.99
  • 1x sold
  • + learn more
RIGGING TEST QUESTIONS AND ANSWERS
  • RIGGING TEST QUESTIONS AND ANSWERS

  • Exam (elaborations) • 72 pages • 2024
  • RIGGING TEST QUESTIONS AND ANSWERS
    (0)
  • $9.00
  • + learn more
Advanced Rigging Test Questions and Answers 100% Correct
  • Advanced Rigging Test Questions and Answers 100% Correct

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Determine if this statement is true or false . The two types of wire rope center core designs are fiber core and independent wire rope core . - ANSWER True Determine if this statement is true or false . Grade 110/120 Improved Plow steel has the highest tensile strength of any type of wire rope . - ANSWER False Determine if this statement is true or false . A 6 x 19 wire rope classification could have as many as 16 to 26 wires per strand . - ANSWER True
    (0)
  • $8.99
  • + learn more
Advanced Crane & Rigging Test Questions and answers latest update
  • Advanced Crane & Rigging Test Questions and answers latest update

  • Exam (elaborations) • 5 pages • 2024
  • Advanced Crane & Rigging Test Questions and answers latest update
    (0)
  • $14.49
  • + learn more