Plumbing test exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Plumbing test exam? On this page you'll find 476 study documents about Plumbing test exam.

Page 3 out of 476 results

Sort by

NYC high pressure boiler license Exam  Questions and Correct Answers 100%
  • NYC high pressure boiler license Exam Questions and Correct Answers 100%

  • Exam (elaborations) • 23 pages • 2024
  • NYC high pressure boiler license Exam Questions and Correct Answers 100% The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? - CORRECT ANSWER-10% How is the main steam pressure gages tested? - CORRECT ANSWER-With an inspectors gage Who is in charge of the code for any plumbing installations? - CORRECT ANSWER-The nyc plumbing code When will anchorage or guides be inspected? - CORRECT ANSWER-Annually How many brass washout plugs does a minia...
    (0)
  • $15.49
  • + learn more
IRC PLUMBING TEST 2024| ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS
  • IRC PLUMBING TEST 2024| ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS

  • Exam (elaborations) • 76 pages • 2024
  • IRC PLUMBING TEST 2024| ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS
    (0)
  • $15.49
  • + learn more
High Boiler License Pressure Steam  NYC Test Exam Questions and Answers  2024
  • High Boiler License Pressure Steam NYC Test Exam Questions and Answers 2024

  • Exam (elaborations) • 17 pages • 2024
  • High Boiler License Pressure Steam NYC Test Exam Questions and Answers 2024 The minimum blowdown for a spring loaded safety valve shall be of what percent of the set pressure ? - CORRECT ANSWER-10 % How is the Main Steam pressure gages tested ? - CORRECT ANSWER-With an Inspectors Gage Who is in charge of the code for any plumbing installations - CORRECT ANSWER-NYC Plumbing Code When will anchorage or guides be inspected ? - CORRECT ANSWER-Annually How many brass washout plugs does...
    (0)
  • $14.99
  • + learn more
High Pressure Steam Exam Nyc Boiler  License Exam With Verified Answers
  • High Pressure Steam Exam Nyc Boiler License Exam With Verified Answers

  • Exam (elaborations) • 20 pages • 2024
  • High Pressure Steam Exam Nyc Boiler License Exam With Verified Answers 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - CORRECT ANSWER-10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - CORRECT ANSWER-The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - CORRECT ANSWER-Annually. NYC Mech: 1210.3.1.2 5 How many bras...
    (0)
  • $15.49
  • + learn more
Backflow Prevention Assembly Tester Exam V3 (Latest 2024/ 2025) Questions and Verified Answers| 100% Correct| Grade A
  • Backflow Prevention Assembly Tester Exam V3 (Latest 2024/ 2025) Questions and Verified Answers| 100% Correct| Grade A

  • Exam (elaborations) • 21 pages • 2024
  • Backflow Prevention Assembly Tester Exam V3 (Latest 2024/ 2025) Questions and Verified Answers| 100% Correct| Grade A Q: A defensible backflow prevention program will maintain records on which of the following Answer: D. All of the above A: backflow prevention assemblies within the system B: complete list of certified backflow assembly testers C: back flow prevention test reports Q: In responding to a potential backflow incident, the water purveyor must Answer: D. Im...
    (0)
  • $10.99
  • + learn more
NCCER PLUMBING LEVEL 1 EXAM QUESTIONS WITH CORRECT ANSWERS ALREADY GRADED A+.
  • NCCER PLUMBING LEVEL 1 EXAM QUESTIONS WITH CORRECT ANSWERS ALREADY GRADED A+.

  • Exam (elaborations) • 26 pages • 2024
  • NCCER PLUMBING LEVEL 1 EXAM QUESTIONS WITH CORRECT ANSWERS ALREADY GRADED A+. You are offered a job by another contractor before you have fulfilled your current obligations. The professional response is to - ANSWER- Ask the contractor to wait until you have met your obligations Your supervisor points out that you forgot to complete a step in the assembly of a drain in a DWV system. One of the apprentices that you are supervising was a he person installing the drain. The responsible action i...
    (0)
  • $12.49
  • + learn more
NHIE EXAM NEWEST 2024 ACTUAL EXAM TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+
  • NHIE EXAM NEWEST 2024 ACTUAL EXAM TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+

  • Exam (elaborations) • 26 pages • 2024
  • NHIE EXAM NEWEST 2024 ACTUAL EXAM TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+ Which type of valve shuts off the water supply and allows the system plumbing to be drained? - Answer Stop and waste valve Copper piping requires a vertical support at what interval? - Answer At least every 10 ft Plastic piping needs more support than copper piping because it tends to expand more - Answer True Which type of connection is a piping arrangement in w...
    (0)
  • $14.49
  • + learn more
AHIT The Plumbing Inspection Test Review with Verified Answers
  • AHIT The Plumbing Inspection Test Review with Verified Answers

  • Exam (elaborations) • 20 pages • 2024
  • Which of the following does NOT have to be inspected during the plumbing inspection? A. fire and lawn sprinkler systems B. fixtures and faucets C. water heating equipment D. supply and drain, waste, and vent (DWV) piping - Ans: A. fire and lawn sprinkler systems Which action IS required by most standards of practice during the plumbing inspection? A. required to operate automatic safety controls B. required to observe onsite water supply quantity and quality C. required to describe wa...
    (0)
  • $9.99
  • + learn more