Osha 30 | 160 questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Osha 30 | 160 questions? On this page you'll find 115 study documents about Osha 30 | 160 questions.

Page 3 out of 115 results

Sort by

Asbestos Contractor/Supervisor  Examination Questions & Correct  Solutions
  • Asbestos Contractor/Supervisor Examination Questions & Correct Solutions

  • Exam (elaborations) • 16 pages • 2024
  • Asbestos Contractor/Supervisor Examination Questions & Correct Solutions Fibers - ANSWER Asbestos is a generic name for a group of minerals that form __________ Hood, booties, coveralls - ANSWER The following are parts of a protective clothing ensemble Removal of 5 feet of pipe insulation in order to fix a leak in the pipe - ANSWER Which of the following operations would be considered to be an OSHA Class II job? Holes cut in the polyethylene next to the machines - ANSWER Make-u...
    (0)
  • $13.99
  • + learn more
Asbestos Project Monitor Examination Questions  Answered Correctly| Already  Passed
  • Asbestos Project Monitor Examination Questions Answered Correctly| Already Passed

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • Asbestos Project Monitor Examination Questions Answered Correctly| Already Passed What is Surfactant? - ANSWER A chemical that reduces the surface tension of water Class 1 Asbestos Project - ANSWER Removal of TSI & Surfacing How do you find the Maximum Use of Concentration? MUC/MUL - ANSWER PEL x PF = MUC What is the sequence for Phase 2 work area preparation? - ANSWER 1. Set up signs 2.Build the worker Decon unit 3.Preparation of the regulated abatement work area 4. (NYS o...
    (0)
  • $10.99
  • + learn more
Maryland Asbestos exam |75| questions with complete solutions
  • Maryland Asbestos exam |75| questions with complete solutions

  • Exam (elaborations) • 7 pages • 2024
  • Maryland Asbestos exam |75| questions with complete solutions The lean ratio of an extension ladder -Correct Answer-4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? -Correct Answer-5 samples taken inside with results of each <0.0 f/cc What are the notification requirements in Virginia? -Correct Answer-20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do ...
    (0)
  • $10.99
  • + learn more
Asbestos test Questions and Answers Graded A+
  • Asbestos test Questions and Answers Graded A+

  • Exam (elaborations) • 8 pages • 2024
  • Asbestos test Questions and Answers Graded A+ Individuals who smoke and are exposed to asbestos gave a much greater chance of contracting lung cancer than those who do not; the compound effect of both carcinogens can be called. . Synergistic effect Which of the following activities are expected to create high concentrations of asbestos in the air (Class 1 work according to OSHA)? aggressive maintenance activities around thermal system insulation (TSI) and renovation activities on trawl...
    (0)
  • $17.99
  • + learn more
Asbestos Contractor/Supervisor Examination Questions And Answers 100% Solved 2024
  • Asbestos Contractor/Supervisor Examination Questions And Answers 100% Solved 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Asbestos Contractor/Supervisor Examination Questions And Answers 100% Solved 2024 Fibers - answerAsbestos is a generic name for a group of minerals that form __________ Hood, booties, coveralls - answerThe following are parts of a protective clothing ensemble Removal of 5 feet of pipe insulation in order to fix a leak in the pipe - answerWhich of the following operations would be considered to be an OSHA Class II job? Holes cut in the polyethylene next to the machines - answerMake-up air f...
    (0)
  • $11.49
  • + learn more
Maryland Asbestos Exam Questions &  Answers
  • Maryland Asbestos Exam Questions & Answers

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • Maryland Asbestos Exam Questions & Answers The lean ratio of an extension ladder - ANSWER 4:1 According to AHERA, to complete a response action of a nonNESHAP size project, how many samples must be taken with results of what? - ANSWER 5 samples taken inside with results of each <0.0 f/cc What are the notification requirements in Virginia? - ANSWER 20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervi...
    (0)
  • $11.49
  • + learn more
Maryland Asbestos exam actual questions and answers
  • Maryland Asbestos exam actual questions and answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Maryland Asbestos exam actual questions and answers The lean ratio of an extension ladder - Answer ️️ -4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? - Answer ️️ -5 samples taken inside with results of each <0.0 f/cc What are the notification requirements in Virginia? - Answer ️️ -20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individual...
    (0)
  • $11.49
  • + learn more
Asbestos Contractor-Supervisor Examination Questions and Answers 2024
  • Asbestos Contractor-Supervisor Examination Questions and Answers 2024

  • Exam (elaborations) • 7 pages • 2024
  • Asbestos Contractor-Supervisor Examination Questions and Answers 2024 Fibers Asbestos is a generic name for a group of minerals that form __________ Hood, booties, coveralls The following are parts of a protective clothing ensemble Removal of 5 feet of pipe insulation in order to fix a leak in the pipe Which of the following operations would be considered to be an OSHA Class II job? Holes cut in the polyethylene next to the machines Make-up air for a negative pressure e...
    (0)
  • $16.99
  • + learn more
Asbestos Project Monitor | With Actual updated questions and answers
  • Asbestos Project Monitor | With Actual updated questions and answers

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • Asbestos Project Monitor | With Actual updated questions and answers A chemical that reduces the surface tension of water - What is Surfactant? Removal of TSI & Surfacing - Class 1 Asbestos Project PEL x PF = MUC - How do you find the Maximum Use of Concentration? MUC/MUL 1. Set up signs 2.Build the worker Decon unit 3.Preparation of the regulated abatement work area 4. (NYS only) wait 4 hours - What is the sequence for Phase 2 work area preparation? Equipment room(dirty room) A...
    (0)
  • $10.49
  • + learn more
Asbestos Contractor/Supervisor Examination Questions And Answers 100% Solved 2024
  • Asbestos Contractor/Supervisor Examination Questions And Answers 100% Solved 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Asbestos Contractor/Supervisor Examination Questions And Answers 100% Solved 2024 Fibers - answerAsbestos is a generic name for a group of minerals that form __________ Hood, booties, coveralls - answerThe following are parts of a protective clothing ensemble Removal of 5 feet of pipe insulation in order to fix a leak in the pipe - answerWhich of the following operations would be considered to be an OSHA Class II job? Holes cut in the polyethylene next to the machines - answerMake-up air f...
    (0)
  • $11.49
  • + learn more