Nerc time limits - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc time limits? On this page you'll find 80 study documents about Nerc time limits.

Page 3 out of 80 results

Sort by

NERC Certification Exam True/False Questions and Correct Solutions
  • NERC Certification Exam True/False Questions and Correct Solutions

  • Exam (elaborations) • 23 pages • 2023
  • According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - B) False True/False The NERC Functional Mode...
    (0)
  • $7.99
  • + learn more
NERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24
  • NERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • NERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24 At what torque angle of operation does power typically begin to flow from the generator to the system? A) 90 degrees B) 60 degrees C) 30 degrees D) 10 degrees 10 degrees Choose the answer that best describes the operation of a rotor. A) The stationary part of the transmission system. B) A type of superconductor. C) The stationary element of a generator that has its windings connected to the system. D) The ...
    (0)
  • $8.99
  • + learn more
NERC Competency study guide Exam test questions with approved Answers 2023/2024
  • NERC Competency study guide Exam test questions with approved Answers 2023/2024

  • Exam (elaborations) • 25 pages • 2024
  • NERC Competency study guide Exam test questions with approved Answers 2023/2024 INT-006-4: Evaluation of Interchange Transactions - correct answer To ensure that responsible entities conduct a reliability assessment of each Arranged Interchange before it is implemented. INT-009-2.1: Implementation of Interchange - correct answer To ensure that Balancing Authorities implement the Interchange as agreed upon in the Interchange confirmation process. INT-010-2.1: Interchange Initiation and...
    (0)
  • $12.49
  • + learn more
NERC Standards| Questions| with complete solutions 100% VERIFIED 2024
  • NERC Standards| Questions| with complete solutions 100% VERIFIED 2024

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NERC Standards| Questions| with complete solutions 100% VERIFIED 2024 How Many Active Standards are in BAL (Resource and Demand Balancing) - answerThere are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency ...
    (0)
  • $11.49
  • + learn more
NERC SOS quiz Questions and Answers (Already GRADED A)
  • NERC SOS quiz Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 60 pages • 2023
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection Burden A Balancing Authority is performing Overlap Regul...
    (0)
  • $11.49
  • + learn more
Nerc Missed Questions with Questions and Correct Solutions
  • Nerc Missed Questions with Questions and Correct Solutions

  • Exam (elaborations) • 40 pages • 2023
  • In order for a generator to qualify as regulating reserve it must have which of the following characteristics ? Generator must be ronized , and its governor blocked Generator must be off - line and available in 10 minutes Generator must be synchronized , and its governor not blocked Generator must be at least 100 MW and synchronized to the system - Generator must be synchronized , and its governor not blocked Why are low - pressure steam turbines generally larger than high ...
    (0)
  • $8.99
  • + learn more
NERC Questions Set 1 with Correct Answers| Graded to Pass
  • NERC Questions Set 1 with Correct Answers| Graded to Pass

  • Exam (elaborations) • 18 pages • 2023
  • Voltage Phase Angle - What is the difference between the voltages at one point as compared to a reference point called? Power Angle - What is the voltage phase angle difference between two points or locations on the system? leading, lagging - MWs flow from greater ____ voltage angle to ____ voltage angle. increases, increase - As power angle ____, power transfers from generation to the power system ____. higher, lower - Real power flows from ____ voltage angle to ____,...
    (0)
  • $11.99
  • + learn more
NERC PREP TEST 101 2023
  • NERC PREP TEST 101 2023

  • Exam (elaborations) • 39 pages • 2023
  • NERC PREP TEST 101 2023 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - CORRECT ANSWER a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are ex...
    (0)
  • $11.49
  • + learn more
Practice Test NERC Questions and Correct Answers (GRADED A+)
  • Practice Test NERC Questions and Correct Answers (GRADED A+)

  • Exam (elaborations) • 48 pages • 2023
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a power s...
    (0)
  • $11.99
  • + learn more
NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024
  • NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024

  • Exam (elaborations) • 25 pages • 2024
  • NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024 The purpose of a generator reactive capability curve is to show what? - correct answer Thermal limits for excitation When a long open ended transmission line is energized and the leading chagrin current flowing through the lines inductance crests a high voltage on the open end, this is known as what? - correct answer Ferranti voltage rise effect To maximize system stability, you would do which of ...
    (0)
  • $12.49
  • + learn more