Nerc time limits - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nerc time limits? On this page you'll find 80 study documents about Nerc time limits.
Page 3 out of 80 results
Sort by
-
NERC Certification Exam True/False Questions and Correct Solutions
- Exam (elaborations) • 23 pages • 2023
-
Available in package deal
-
- $7.99
- + learn more
According to the NERC Functional Model, there is no difference between the function and the entity. 
 
A) True 
B) False - B) False 
 
True/False 
 
Analysis type questions are designed to be the least complex from a human cognitive process. 
 
A) True 
B) False - B) False 
 
True/False 
 
A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. 
 
A) True 
B) False - B) False 
 
True/False 
 
The NERC Functional Mode...
-
NERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $8.99
- + learn more
NERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24 
 
At what torque angle of operation does power typically begin to flow from the generator to the system? 
 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees 10 degrees 
Choose the answer that best describes the operation of a rotor. 
 
A) The stationary part of the transmission system. 
B) A type of superconductor. 
C) The stationary element of a generator that has its windings connected to the system. 
D) The ...
-
NERC Competency study guide Exam test questions with approved Answers 2023/2024
- Exam (elaborations) • 25 pages • 2024
-
Available in package deal
-
- $12.49
- + learn more
NERC Competency study guide Exam test questions with approved Answers 2023/2024 
INT-006-4: Evaluation of Interchange Transactions - correct answer To ensure that responsible entities conduct a reliability assessment of each Arranged Interchange before it is implemented. 
 
INT-009-2.1: Implementation of Interchange - correct answer To ensure that Balancing Authorities implement the Interchange as agreed upon in the Interchange confirmation process. 
 
INT-010-2.1: Interchange Initiation and...
-
NERC Standards| Questions| with complete solutions 100% VERIFIED 2024
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NERC Standards| Questions| with complete 
solutions 100% VERIFIED 2024 
How Many Active Standards are in BAL (Resource and Demand Balancing) - answerThere 
are 8 Active Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to 
Enforcement 
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information 
Subject to Enforcement 
BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing 
Contingency ...
-
NERC SOS quiz Questions and Answers (Already GRADED A)
- Exam (elaborations) • 60 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
A Balancing Authority is performing Overlap Regul...
And that's how you make extra money
-
Nerc Missed Questions with Questions and Correct Solutions
- Exam (elaborations) • 40 pages • 2023
-
Available in package deal
-
- $8.99
- + learn more
In order for a generator to qualify as regulating reserve it must have which of the following characteristics ? 
 
Generator must be ronized , and its governor blocked 
 
Generator must be off - line and available in 10 minutes 
 
Generator must be synchronized , and its governor not blocked 
 
Generator must be at least 100 MW and synchronized to the system - Generator must be synchronized , and its governor not blocked 
 
Why are low - pressure steam turbines generally larger than high ...
-
NERC Questions Set 1 with Correct Answers| Graded to Pass
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
Voltage Phase Angle - What is the difference between the voltages at one point as compared to a reference point called? 
 
Power Angle - What is the voltage phase angle difference between two points or locations on the system? 
 
leading, lagging - MWs flow from greater ____ voltage angle to ____ voltage angle. 
 
increases, increase - As power angle ____, power transfers from generation to the power system ____. 
 
higher, lower - Real power flows from ____ voltage angle to ____,...
-
NERC PREP TEST 101 2023
- Exam (elaborations) • 39 pages • 2023
-
- $11.49
- + learn more
NERC PREP TEST 101 
2023 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently 
loaded at 1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - CORRECT ANSWER a. 
Generator MVAR output would increase 
2. When system conditions are such that emergency procedures are ex...
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024
- Exam (elaborations) • 25 pages • 2024
-
Available in package deal
-
- $12.49
- + learn more
NERC Pre course Study Guide Exam Questions and Verified for Accuracy Answers 2023/2024 
 
The purpose of a generator reactive capability curve is to show what? - correct answer Thermal limits for excitation 
 
When a long open ended transmission line is energized and the leading chagrin current flowing through the lines inductance crests a high voltage on the open end, this is known as what? - correct answer Ferranti voltage rise effect 
 
To maximize system stability, you would do which of ...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia