Ncidq lighting exam Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Ncidq lighting exam? On this page you'll find 33 study documents about Ncidq lighting exam.

Page 3 out of 33 results

Sort by

NCIDQ Practice Exam Questions - IDPX
  • NCIDQ Practice Exam Questions - IDPX

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • NCIDQ Practice Exam Questions – IDPX Questions and Answers Already Passed Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished. D. The city inspector has inspected and finalized the job. Answer: D What factors are MOST important in determining the locations of indivi...
    (0)
  • $9.99
  • + learn more
NCIDQ Practice Exam Questions – IDPX with 100% Correct Answers
  • NCIDQ Practice Exam Questions – IDPX with 100% Correct Answers

  • Exam (elaborations) • 8 pages • 2024
  • NCIDQ Practice Exam Questions – IDPX with 100% Correct Answers Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished. D. The city inspector has inspected and finalized the job. - ️️ Answer: D What factors are MOST important in determining the locations of individual w...
    (0)
  • $12.49
  • + learn more
NCIDQ Practice Exam Questions – IDPX with complete solutions 2023
  • NCIDQ Practice Exam Questions – IDPX with complete solutions 2023

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • NCIDQ Practice Exam Questions – IDPX with complete solutions 2023Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished. D. The city inspector has inspected and finalized the job. - correct answer Answer: D What factors are MOST important in determining the locations of in...
    (0)
  • $9.99
  • + learn more
NCIDQ Exam with 100% Correct Answers 2023
  • NCIDQ Exam with 100% Correct Answers 2023

  • Exam (elaborations) • 25 pages • 2023
  • Available in package deal
  • In addition to analyzing space needs, the requirements for a client's work flow or business process should be compared with the available space. Which workflow type does not have strict organized method of work flow? a. departmental b. cooperative c. network d. linear - Correct answer-c. network With a network workflow organization, there is no strictly organized method of workflow A building that has a platinum rating has been designed and certified under which of the following system...
    (0)
  • $11.99
  • + learn more
NCIDQ Exam Building Code Requirements
  • NCIDQ Exam Building Code Requirements

  • Exam (elaborations) • 4 pages • 2024
  • NCIDQ Exam Building Code Requirements Common Path of Egress Travel The portion of the exit access [access to an exit] that must be traversed BEFORE two separate and distinct paths of travel to two exits are available. Common path of egress travel shall be included within the permitted travel distance. Travel Distance The distance measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel. MUST be 1-hour fire rated ...
    (0)
  • $9.99
  • + learn more
NCIDQ Exam Building Code Requirements (Answered) Graded A+ 2022?2023
  • NCIDQ Exam Building Code Requirements (Answered) Graded A+ 2022?2023

  • Exam (elaborations) • 4 pages • 2022
  • NCIDQ Exam Building Code Requirements Common Path of Egress Travel The portion of the exit access [access to an exit] that must be traversed BEFORE two separate and distinct paths of travel to two exits are available. Common path of egress travel shall be included within the permitted travel distance. Travel Distance The distance measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel. MUST be 1-hour fire rated ...
    (0)
  • $9.49
  • + learn more
NCIDQ - IDFX EXAM STUDY SET QUESTIONS & ANSWERS
  • NCIDQ - IDFX EXAM STUDY SET QUESTIONS & ANSWERS

  • Exam (elaborations) • 55 pages • 2024
  • NCIDQ - IDFX EXAM STUDY SET . The partial floor plan given shows the subdivision of one side of an existing building into five offices with the architectural dimensions given on the outside of the building. Why is office #305 not dimensioned? (A) It is the same width as office #304. (B) Dimension strings are left incomplete. (C) There may be a potential conflict with the existing overall dimension. (D) The dimensions can be calculated by subtraction from the existing architectural dimensi...
    (0)
  • $44.82
  • + learn more
NCIDQ IDPX Model Exam Questions (175 QA)
  • NCIDQ IDPX Model Exam Questions (175 QA)

  • Exam (elaborations) • 31 pages • 2024
  • NCIDQ IDPX Model Exam Questions (175 QA) 1. An interior designer has determined the required gross occupant area required for a client planning to lease space in an office building. Using the Building Owners and Managers Association (BOMA) standard ANSI/BOMA Z65.1, Office Buildings: Standard Methods of Measurement, which of the following would be used to determine the amount of lease space the client will be paying for? (A) building efficiency ratio (B) building load factor (C) R/U ratio (D...
    (0)
  • $13.99
  • + learn more
NCIDQ IDPX Model Exam Questions (175 QA)
  • NCIDQ IDPX Model Exam Questions (175 QA)

  • Exam (elaborations) • 31 pages • 2024
  • NCIDQ IDPX Model Exam Questions (175 QA) 1. An interior designer has determined the required gross occupant area required for a client planning to lease space in an office building. Using the Building Owners and Managers Association (BOMA) standard ANSI/BOMA Z65.1, Office Buildings: Standard Methods of Measurement, which of the following would be used to determine the amount of lease space the client will be paying for? (A) building efficiency ratio (B) building load factor (C) R/U ratio (D...
    (0)
  • $13.49
  • + learn more
NCIDQ – IDPX(rated A+ ALREADY PASSED!)
  • NCIDQ – IDPX(rated A+ ALREADY PASSED!)

  • Exam (elaborations) • 79 pages • 2022
  • Available in package deal
  • NCIDQ – IDPX(rated A+ ALREADY PASSED!)A: Door Schedule Where would it be best to call out the frame material on an entry door? A. door schedule B. finish schedule C. hardware schedule D. finish plan A: 'I' should be used for interior design sheets when an architect's drawings are included as part of the drawing set 'I' is most commonly used when architectural drawings are also included in a drawing set, as a means to easily distinguish between architectural and inte...
    (0)
  • $20.49
  • + learn more