Nccco rigging 1 2 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco rigging 1 2? On this page you'll find 119 study documents about Nccco rigging 1 2.

Page 3 out of 119 results

Sort by

NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet...
    (0)
  • $14.49
  • + learn more
OECP/NCCO Questions & 100% Correct  Answers
  • OECP/NCCO Questions & 100% Correct Answers

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • Which of the following OSHA regulations, governing suspended personnel platforms? ~~> OSHA 1926.1431 According to ASME B30.3, the prohibited zone for power lines that are 60 kV is. ~~> 15 ft The OSHA construction standards for rigging equipment is? ~~> 1926.251 According to ASME B30.3 what is the minimum pitch diameter for a load block sheaves? ~~> Not less than 15 times rope diameter According to OSHA, a periodic inspection is? ~~> Monthly to annually Pe...
    (0)
  • $10.49
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)

  • Exam (elaborations) • 16 pages • 2024
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Hydraulic systems should have their proper fluid level checked - ANSWER Daily If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing inst...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom correct answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8%...
    (0)
  • $14.99
  • + learn more
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
  • NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A OSHA 1910 - CORRECT ANSWER-General Industry Standards OSHA 1926 - CORRECT ANSWER-Construction Industry Standards OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes OSHA 1910.184 - CORRECT ANSWER-Slings OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.5 - CORRECT ANSWER-Mobi...
    (0)
  • $11.49
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing instructions be kept - ANSWER ON Site All climbing operations shall be performed under the supervision of - ANSWER Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - ANSWER Before crane is placed in service Hooks shall be equipped with lat...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE TESTS | 100 Questions with 100% Correct Answers | Verified | Latest Update | 17 Pages
  • NCCCO MOBILE CRANE TESTS | 100 Questions with 100% Correct Answers | Verified | Latest Update | 17 Pages

  • Exam (elaborations) • 17 pages • 2024
  • NCCCO MOBILE CRANE TESTS | 100 Questions with 100% Correct Answers | Verified | Latest Update | 17 Pages 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer ️️ -c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain ...
    (0)
  • $12.49
  • + learn more
NCCCO Mobile Crane Exam (2024) Questions With100% Correct And Verified Answers| Grade A
  • NCCCO Mobile Crane Exam (2024) Questions With100% Correct And Verified Answers| Grade A

  • Exam (elaborations) • 15 pages • 2024
  • NCCCO Mobile Crane Exam (2024) Questions With100% Correct And Verified Answers| Grade A 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Correct Answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% ...
    (0)
  • $10.49
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS
  • NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS

  • Exam (elaborations) • 11 pages • 2023
  • NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer-c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - Answer-a. 3....
    (0)
  • $13.49
  • + learn more
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers
  • NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers

  • Exam (elaborations) • 4 pages • 2024
  • NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers OSHA 1910 - Answer-General Industry Standards OSHA 1926 - Answer-Construction Industry Standards OSHA 1910.180 - Answer-Crawler, Locomotive and Truck Cranes OSHA 1910.184 - Answer-Slings OSHA 1926.251 - Answer-Rigging Equipment used for material handling OSHA 1926.1400 - Answer-Cranes and Derricks used in construction ASME B30.3 - Answer-Tower Cranes ASME B30.5 - Answer-Mobile and Locomotive Cranes ASME B30.9 - Answer-Slings A...
    (0)
  • $8.99
  • + learn more