Nccco rigging 1 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco rigging 1 2? On this page you'll find 119 study documents about Nccco rigging 1 2.
Page 3 out of 119 results
Sort by
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump down, feet...
-
OECP/NCCO Questions & 100% Correct Answers
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Which of the following OSHA regulations, governing suspended personnel 
platforms? 
 ~~> OSHA 1926.1431 
According to ASME B30.3, the prohibited zone for power lines that are 60 kV 
is. 
 ~~> 15 ft 
The OSHA construction standards for rigging equipment is? 
 ~~> 1926.251 
According to ASME B30.3 what is the minimum pitch diameter for a load 
block sheaves? 
 ~~> Not less than 15 times rope diameter 
According to OSHA, a periodic inspection is? 
 ~~> Monthly to annually 
Pe...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
- Exam (elaborations) • 16 pages • 2024
-
Available in package deal
-
- $14.99
- + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to 
finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing inst...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom correct answers c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8%...
-
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO RIGGING 1 & 2 Final Exam 
Latest Updated Q&A 
OSHA 1910 - CORRECT ANSWER-General Industry Standards 
OSHA 1926 - CORRECT ANSWER-Construction Industry Standards 
OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - CORRECT ANSWER-Slings 
OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling 
OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction 
ASME B30.3 - CORRECT ANSWER-Tower Cranes 
ASME B30.5 - CORRECT ANSWER-Mobi...
As you read this, a fellow student has made another $4.70
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
-
NCCCO MOBILE CRANE TESTS | 100 Questions with 100% Correct Answers | Verified | Latest Update | 17 Pages
- Exam (elaborations) • 17 pages • 2024
-
- $12.49
- + learn more
NCCCO MOBILE CRANE TESTS | 100 
Questions with 100% Correct Answers | 
Verified | Latest Update | 17 Pages 
1. What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer ️️ -c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain ...
-
NCCCO Mobile Crane Exam (2024) Questions With100% Correct And Verified Answers| Grade A
- Exam (elaborations) • 15 pages • 2024
-
- $10.49
- + learn more
NCCCO Mobile Crane Exam (2024) Questions With100% Correct And Verified Answers| Grade A 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Correct Answers c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
...
-
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS
- Exam (elaborations) • 11 pages • 2023
-
Available in package deal
-
- $13.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer-c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - Answer-a. 
 
3....
-
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
NCCCO RIGGING 1 & 2 
Exam Questions with 
Correct Answers 
 
OSHA 1910 - Answer-General Industry Standards 
OSHA 1926 - Answer-Construction Industry Standards 
OSHA 1910.180 - Answer-Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - Answer-Slings 
OSHA 1926.251 - Answer-Rigging Equipment used for material handling 
OSHA 1926.1400 - Answer-Cranes and Derricks used in construction 
ASME B30.3 - Answer-Tower Cranes 
ASME B30.5 - Answer-Mobile and Locomotive Cranes 
ASME B30.9 - Answer-Slings 
A...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia