Mrp system - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Mrp system? On this page you'll find 473 study documents about Mrp system.

Page 3 out of 473 results

Sort by

WGU C215 Study Guide – FINAL with correct answers 2023 (New Questions)
  • WGU C215 Study Guide – FINAL with correct answers 2023 (New Questions)

  • Exam (elaborations) • 19 pages • 2023
  • WGU C215 Study Guide – FINAL with correct answers 2023 (New Questions) Total Quality Management (TQM) Philosophy - correct answer 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) - correct answer Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of...
    (1)
  • $14.49
  • 2x sold
  • + learn more
WGU C215 Operations Management Question with 100 % correct answers | Verified | updated
  • WGU C215 Operations Management Question with 100 % correct answers | Verified | updated

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • A company decides and makes plans to enter into a new market. Which project life cycle phase does this strategy relate to? -Conception -Planning -Execution -Feasibility analysis - feasibility analysis A company is experiencing an unusual amount of deliveries that are either late or an incorrect quantity. Which type of system is used to identify and manage this type of problem? -FMS (Flexible manufacturing system) -MRP (material req planning) -CRP ( capacity req planning) -ERP (enterpr...
    (0)
  • $7.99
  • + learn more
WGU C215 OPERATION MANAGEMENT/WGU  C215 COMBINED LATEST UPDATED EXAM ALL  CORRECTLY VERIFIED QUESTIONS &  ANSWERS GRADED A+…
  • WGU C215 OPERATION MANAGEMENT/WGU C215 COMBINED LATEST UPDATED EXAM ALL CORRECTLY VERIFIED QUESTIONS & ANSWERS GRADED A+…

  • Exam (elaborations) • 82 pages • 2024
  • WGU C215 OPERATION MANAGEMENT/WGU C215 COMBINED LATEST UPDATED EXAM ALL CORRECTLY VERIFIED QUESTIONS & ANSWERS GRADED A+… What are two common drawbacks of implementing an enterprise resource planning (ERP) solution? 1. it requires extensive, often complex, training 2. it takes a long time to implement and to see any benefits What is the primary purpose in using the master production schedule (MPS) in the marketing department of an organization? To manage the demand for promised ...
    (0)
  • $25.99
  • + learn more
SCMN 4770 Test 1 Srickland (100% Correct Answers)
  • SCMN 4770 Test 1 Srickland (100% Correct Answers)

  • Exam (elaborations) • 6 pages • 2023
  • MRP System correct answers A Manufacturing Planning and Control system provides information and support, which enables managers to efficiently direct the flow of material, manage the utilization of people and equipment, and respond to customer requirements by utilizing the capacity of suppliers, internal facilities, and, in some cases, customers Key Point correct answers People working on the right things Support Activities Short Term correct answers The MPC system must track the u...
    (0)
  • $11.17
  • + learn more
WGU C215 FINAL EXAM | QUESTIONS &  ANSWERS (VERIFIED) | LATEST  UPDATE | GRADED A+
  • WGU C215 FINAL EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+

  • Exam (elaborations) • 64 pages • 2024
  • Available in package deal
  • ABC Classification ANSWER: a method for determining level of control and frequency of review of inventory items Acceptable Quality Level (AQL) ANSWER: The small percentage of defects that consumers are willing to accept. Acceptable Sampling ANSWER: The process of randomly inspecting a sample of goods and deciding whether to accept the entire lot based on the results Action Bucket ANSWER: The current time period Action Notices ANSWER: Output from an MRP system that identifies th...
    (0)
  • $18.99
  • + learn more
WGU C215 EXAM | QUESTIONS &  ANSWERS (VERIFIED) | LATEST  UPDATE | GRADED A+
  • WGU C215 EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+

  • Exam (elaborations) • 62 pages • 2024
  • Available in package deal
  • ABC Classification ANSWER: a method for determining level of control and frequency of review of inventory items Acceptable Quality Level (AQL) ANSWER: The small percentage of defects that consumers are willing to accept. Acceptable Sampling ANSWER: The process of randomly inspecting a sample of goods and deciding whether to accept the entire lot based on the results Action Bucket ANSWER: The current time period Action Notices ANSWER: Output from an MRP system that identifies th...
    (0)
  • $16.99
  • + learn more
WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide with 100% Complete Solutions
  • WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide with 100% Complete Solutions

  • Exam (elaborations) • 67 pages • 2024
  • Available in package deal
  • WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide with 100% Complete Solutions 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality - Answer- Total Quality Management (TQM) Philosophy Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of...
    (0)
  • $13.49
  • + learn more
WGU C215 Objective Assessment Guide (Latest 2024/ 2025 Update) Operations Management| Questions and Verified Answers| 100% Correct| Grade A
  • WGU C215 Objective Assessment Guide (Latest 2024/ 2025 Update) Operations Management| Questions and Verified Answers| 100% Correct| Grade A

  • Exam (elaborations) • 44 pages • 2024
  • WGU C215 Objective Assessment Guide (Latest 2024/ 2025 Update) Operations Management| Questions and Verified Answers| 100% Correct| Grade A Q: Tier One Suppliers Supplies materials or services directly to the processing facility. These are the suppliers that put products in specific containers or packages. Internal Functions companies Q: Tier Two Suppliers Answer: Directly supplies materials or services to a tier-one supplier in the supply chain. Suppliers of the spec...
    (0)
  • $10.99
  • + learn more
CS_T410 SAP Certification Practice 99 Questions with Verified Answers,100% CORRECT
  • CS_T410 SAP Certification Practice 99 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 24 pages • 2024
  • CS_T410 SAP Certification Practice 99 Questions with Verified Answers Which business process uses the following SAP master data: Vendor, Material, and Purchasing Info record? - CORRECT ANSWER STP True or False: Intelligent Enterprise is the umbrella under which all SAP products sit, with S/4HANA at the core. - CORRECT ANSWER TRUE Which of the following is the correct hierarchy of organizational structure elements in SAP S/4HANA (from 1. highest level to 4. lowest level)? - CORRECT A...
    (0)
  • $11.49
  • + learn more
WGU C720 Operations and Supply Chain Management Exam| Questions and Verified  Answers| 2023/ 2024 Latest Update!!!
  • WGU C720 Operations and Supply Chain Management Exam| Questions and Verified Answers| 2023/ 2024 Latest Update!!!

  • Exam (elaborations) • 20 pages • 2023
  • WGU C720 Operations and Supply Chain Management Exam| Questions and Verified Answers| 2023/ 2024 Latest Update!!! QUESTION A hospital administrator needs to determine how many beds to make available for exam rooms, operating rooms, and in-patient care. The hospital board announces they will be getting more patient referrals from specialists at a newly opened clinic. What should the administrator use to forecast how many beds to make available, given the increased number of patien...
    (0)
  • $10.99
  • + learn more