For roofing operations - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about For roofing operations? On this page you'll find 236 study documents about For roofing operations.
Page 3 out of 236 results
Sort by
-
G-60 Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.39
- + learn more
The pre-hot work check must be conducted by the responsible person... 
: Once per day 
Roofing operations should have a _______ fire extinguisher within _______ feet from 
where the hot-work is performed and where the fire guards are positioned. 
: 3-A:40-B:C, 30 
Piped gas lines should be... 
: Shut off if there is a fire 
Don't aim the fire extinguisher at... 
: center of the flame 
For hot-work operations, there should be an ___________ fire extinguisher nearby 
: 2-A:20-B:C 
When it is not...
-
FDNY G60 TEST Questions with 100% Correct Answers | Latest Version 2024 | Verified
- Exam (elaborations) • 5 pages • 2024
-
- $8.99
- + learn more
Sprinkler system must NOT be shut off or impaired while hot work is performed - Place damp cloth 
guards on individual sprinkler heads 
The person conducting the fire watch ______ have other duties - CANNOT 
A portable fire extinguisher with a rating of _________ is required and should be within ____ feet travel 
distance hot work area - 2-A:20-B:C///30 
For ROOFING OPERATIONS, a portable fire extinguisher with a minimum rating of ______ is required - 
3-A:40-B:C 
Fire watch on floors below is _...
-
AFSB 151 - Application Questions (Chapters 1-8)
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
AFSB 151 - Application Questions (Chapters 1-8) 
Akiem owns a small hardware business. He plans to hire a contractor to build a new 
retail building for his business. Akiem contacted his financial planner for advice on the 
type of bods he should require from the contractor to be assured that the work will be 
completed properly, according to the specifications and in compliance with city building 
codes. Akiem believes that personal suretyship, backed by his brother (the surety), 
would be suff...
-
FDNYC G60 Exam Practice Questions and Answers Latest Updated 2024 (Graded A+)
- Exam (elaborations) • 69 pages • 2024
-
Available in package deal
-
- $17.49
- + learn more
FDNYC G60 Exam Practice Questions and Answers Latest Updated 2024 (Graded A+) G-60: Use of oxygen and flammable gasses, or LPG or CNG for any hot work 
2. COF exception: Torch operations for jewelry 
3. FDNY permit: Storing using or handling 
oxygen and flammable gas 
in excess of 400scf (LPG, CNG or scetylene) 
oxidizing gass in excess of 504scf 
4. Portable LPG must not be stored when the capacity of the container is 
greater than?: 16.4 oz 
5. Portable CNG containers must not be stored then t...
-
Asbestos Supervisor-Project Manager Questions and Answers Graded A
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
Asbestos Supervisor-Project Manager Questions and Answers Graded A 
Friable Asbestos 
material that contains greater than 1% asbestos and that can be crumbled, pulverized or reduced to powder by hand pressure 
 
 
 
Diseases Associated with Asbestos 
Asbestosis, Lung Cancer, Mesthelioma 
 
 
 
Once asbestos is removed from a building and deposited in a landfill, most legal authorities believe it is the property of: 
The building owner 
 
 
 
The purpose of wearing protective clothing inside the ...
And that's how you make extra money
-
fdny g60 PRACTICE TEST QUESTIONS AND ANSWERS
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
fdny g60 PRACTICE TEST QUESTIONS AND ANSWERS 
 
Sprinkler system must NOT be shut off or impaired while hot work is performed - ANS Place damp cloth guards on individual sprinkler heads 
 
The person conducting the fire watch ______ have other duties - ANS CANNOT 
 
A portable fire extinguisher with a rating of _________ is required and should be within ____ feet travel distance hot work area - ANS 2-A:20-B:C///30 
 
For ROOFING OPERATIONS, a portable fire extinguisher with a minimum ra...
-
SC State REAL ESTATE Exam Questions and Answers 100% Pass
- Exam (elaborations) • 41 pages • 2023
-
Available in package deal
-
- $10.99
- + learn more
SC State REAL ESTATE Exam Questions and Answers 100% Pass 
Which of the following scenarios best describes a net listing in South Carolina? 
-Carmel is selling her condo for $280,000 and is offering 6% commission to the listing broker. 
-Jason is listing his duplex for $400,000, but reserves the right to find his own buyer and not have to pay a listing commission. 
-Maeve wants to get at least $350,000 when she sells her property and tells her listing agent, Stan, that he can keep anything above...
-
Asbestos Test Study Guide Graded A+
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Category 1 nonfriable asbestos-containing material (AMC) - Answer-means asbestos-containing 
packages, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 
percent asbestos as determined using the method specified in appendix E, subpart E, 40 CRF part 
763, section 1, Polarized Light Microscopy 
Category II nonfiriable AMC - Answer-means any material, excluding Category I nonfirable AMC, 
containing more than 1 percent asbestos as determined using the method sp...
-
FDNY G60 Practice Test Questions And Answers Rated A+
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Sprinkler system must NOT be shut off or impaired while hot work is performed - answer-Place damp cloth guards on individual sprinkler heads 
 
The person conducting the fire watch ______ have other duties - answer-CANNOT 
 
A portable fire extinguisher with a rating of _________ is required and should be within ____ feet travel distance hot work area - answer-2-A:20-B:C///30 
 
For ROOFING OPERATIONS, a portable fire extinguisher with a minimum rating of ______ is required - ...
-
FDNYC G60 Exam Review Questions and Answers Latest Updated 2023-2024 (Graded 100%)
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $17.99
- + learn more
FDNYC G60 Exam Review Questions and Answers Latest Updated (Graded 100%). Portable LPG must not be stored when the capacity of the container is 
greater than?: 16.4 oz 
5. Portable CNG containers must not be stored then the capacity is greater 
than?: 8.7 SCF 
6. Single standard portable LPG containers must not exceed?: 100LBs in 
weight 
7. Single CNG containers must not exceed?: 381 SCF 
8. LPG 
400 SCF is approximately: 47 lbs 
2 / 28 
9. Types of FDNY permits: Site specific permits 
City wi...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia