De energized - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about De energized? On this page you'll find 659 study documents about De energized.
Page 3 out of 659 results
Sort by
-
NATE Practice Exam CORRECT 100%
- Exam (elaborations) • 36 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
A suction line accumulator should be used in a residential heating pump only when recommended by the manufacturer if: 
 
a. Long refrigerant lines increase system charge over recommended maximum charge 
 
b. added oil dilution is required to maintain proper lubrication 
 
c. the system has low vapor line pressure drop and accumulator is added to improve efficiency 
 
d. the system does not include a high pressure switch or time delay - ANSWERA. Long refrigerant lines increase system charge ove...
-
NCCCO MOBILE CRANE TESTS 2024 | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. T...
-
Electrical Wiring Questions and Answers Graded A+
- Exam (elaborations) • 9 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
Electrical Wiring Questions and Answers 
 
Graded A+ 
 
What is the role of a relay in electrical circuits? 
A relay acts as an electrically operated switch, allowing a low-power signal to control a 
higher power circuit. 
 
How does the polarity of wires affect electrical devices? 
Correct polarity ensures that devices function properly; reversing the polarity can cause 
malfunction or damage. 
 
What are the common colors used to identify wires in residential wiring? 
Common wire colors includ...
-
NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
-
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.89
- + learn more
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A 
 
 
What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - ANSWER Boom up 
 
 
 
When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? - ANSWER 1% 
 
 
 
Th...
Too much month left at the end of the money?
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 100% CORRECT
- Exam (elaborations) • 21 pages • 2024
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 100% CORRECT 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom Answer- c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% Answer- a...
-
NCCCO MOBILE CRANE QUESTIONS WITH 100% VERIFIED CORRECT ANSWERS 2024/2025
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
NCCCO MOBILE CRANE QUESTIONS WITH 100% VERIFIED CORRECT ANSWERS 2024/2025 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Correct Answer c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% ...
-
Massachusetts 2a Hoisting License Questions And Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Massachusetts 2a Hoisting License Questions And Answers Latest Updated 2024/2025 | Scored A+. What is the purpose of the swing gear on an excavator: answer- It 
connects the car body to the tracks 
2. Who is responisble for inspecting a trench before anyone goes in it: 
answer- The equipment operator 
3. What is the prefered sling angle: answer- 60* 
4. The top of the spoil pile is called: answer- The crown 
5. A four footbdeep trench requires an additional ladder for each _ of open 
trench: ans...
-
NCCER Review Questions And Answers 2024-2025
- Exam (elaborations) • 41 pages • 2024
- Available in package deal
-
- $15.99
- + learn more
NCCER Review Questions And Answers 
The density of a liquid affects the displacer's: 
length 
height 
buoyancy - ANS-buoyancy 
What mode MUST the controller be in before any changes are made to the process variable? 
automatic 
manual 
shut-down 
power off - ANS-manual 
Bills of material are found in: 
general arrangement drawings 
P&ID 
piping orthographics 
instrument detail drawings - ANS-general arrangement drawings 
When bench calibrating a temperature RTD transmitter, the ...
-
NCCCO MOBILE CRANE Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 17 pages • 2024
-
- $8.49
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% a. 
3. The load line of the crane you're operating contacts an energized power line. Ther...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia