CSLB C10 Test 1 question n answers graded A+ 2024/2025
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $13.49
- + learn more
CSLB C10 Test 1What is the minimum working clearance from an electrical panel under 600 V? - correct answer 36" 
 
Voltage drop in wire is a function of: - correct answer Wire gauge, Length of wire, Current flow in the wire 
 
A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day? - correct answer 156 
 
Where may you use nonmetallic-sheathed cable? - correc...
-
CSLB Contractor's Law practice test Part 2 question n answers 2024/2025
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CSLB Contractor's Law practice test Part 2When should you let your attorney see a construction contract? 
 A. Before you let the client see the contract 
 B. After the contract is prepared but before you sign it 
 C. After the building permit is obtained 
 D. After the contract is signed by you and the client - correct answer B. After the contract is prepared but before you sign it 
 
Which is the most correct statement as to what must be included in every home improvement contract? 
 A. Notice...
-
CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+.
- Exam (elaborations) • 7 pages • 2023
-
- $10.49
- + learn more
CSLB C10 TEST 1 / 120+ 
QUESTIONS AND CORRECT 
ANSWERS 2023/2024 / 
GRADED A+. 
CSLB C10 Test 1 
1. What is the minimum working clearance from an electrical panel under 600 
V?: 36" 
2. Voltage drop in wire is a function of:: Wire gauge, Length of wire, Current flow 
in the wire 3. A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell.The average daily on-time is 12 hours per day. How many watt-hours are 
consumed by the light on an average day?: 156 
4. Where may you...
-
CSLB C10 Test 1 | 120 Questions and Correct Solutions
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
CSLB C10 Test 1 | 120 Questions and Correct 
Solutions 
What is the minimum working clearance from an electrical panel under 600 V? 
36" 
Voltage drop in wire is a function of: 
Wire gauge, Length of wire, Current flow in the wire 
A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. The average daily on-time 
is 12 hours per day. How many watt-hours are consumed by the light on an average day? 
156 
Where may you use nonmetallic-sheathed cable? 
inside floors and w...
-
CSLB Practice Test Questions with Complete Solutions Graded A+
- Exam (elaborations) • 5 pages • 2024
-
- $12.49
- + learn more
CSLB Practice Test Questions with Complete Solutions Graded A+ 
Abandonment of contract - Answer-abandonment of contract to cease intending or attempting to perform without legal excuse of any construction project or operation engaged in or undertaken by the licensee as a contractor shall be cause for disciplinary action 
 
Abeyance - Answer-condition in which ownership is undetermined 
 
Abstract - Answer-A summary to the history of the legal title to a piece of property; summary of a document;...
Too much month left at the end of the money?
-
CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers)
- Exam (elaborations) • 24 pages • 2023
-
- $18.49
- + learn more
CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers). A general contractor has obtained bids from several subcontractors for a private 
project. He notices that one bid is substantially lower than the rest. Is it ethical and a 
good business practice for this contractor to inform the subcontractor that the bid is 
substantially lower than the bids of the other subcontractors? - Answer Yes. If the 
contractor has reason to believe that the subcontractor has made an error in ...
-
CSLB C10 Test 1: Exam Review Questions and answers, rated A+| latest update 2024/25|
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $9.49
- + learn more
CSLB C10 Test 1: Exam Review 
Questions and answers, rated A+ 
What is the minimum working clearance from an electrical panel under 600 V? 
36" 
Voltage drop in wire is a function of: 
Wire gauge, Length of wire, Current flow in the wire 
A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. The average daily on-time 
is 12 hours per day. How many watt-hours are consumed by the light on an average day? 
156 
Where may you use nonmetallic-sheathed cable? 
inside flo...
-
CSLB Contractor's Law practice test Part 2 | 54 Questions and Verified Solutions Latest Update
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
CSLB Contractor's Law practice test Part 2 | 
54 Questions and Verified Solutions Latest 
Update 
When should you let your attorney see a construction contract? 
A. Before you let the client see the contract 
B. After the contract is prepared but before you sign it 
C. After the building permit is obtained 
D. After the contract is signed by you and the client - Answer -B. After the contract is prepared but 
before you sign it 
Which is the most correct statement as to what must be included in ...
-
CSLB Contractor's Law practice test Part 2
- Exam (elaborations) • 12 pages • 2024
-
- $11.49
- + learn more
CSLB Contractor's Law practice test Part 2 
1. B. After the con- 
tract is prepared 
but before you 
sign it 
2. B. Contractor's li- 
cense number 
3. B. The name and 
home address of 
all the personnel 
listed on the li- 
When should you let your attorney see a construction 
contract? 
A. Before you let the client see the contract 
B. After the contract is prepared but before you sign it 
C. After the building permit is obtained 
D. After the contract is signed by you and the client 
Which is...
-
CSLB 2024-2025 Test Questions and Answers All Correct
- Exam (elaborations) • 2 pages • 2024
-
- $12.49
- + learn more
CSLB Test Questions and Answers All Correct 
 
Who's responsible for inspection costs and labor? - Answer-Permit puller / person calling for inspection. 
 
How do you determine the required size of a septic tank? - Answer-Number of bedrooms. 
 
What is the maximum height of the lip of a handicap urinal? - Answer-17 inches 
 
Every employer of X or more employees must keep written health and safety records for X years. - Answer-11 employees 5 years 
 