Cm 4100 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cm 4100? On this page you'll find 44 study documents about Cm 4100.

Page 3 out of 44 results

Sort by

CM 4101 Exam Questions Answered 100% Correct
  • CM 4101 Exam Questions Answered 100% Correct

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Work breakdown structure - Answer provides a framework for breaking a project down into successively greater detail by level and organizing activities that make up a project. wbs - Answer A ____ organizes the work of a project but does not address the sequencing and the scheduling of project activities. milestones - Answer are included in schedules to mark a particular point in time for reference or measurement
    (0)
  • $12.49
  • + learn more
CM 410 Final Exam Questions And Answers 100% Correct
  • CM 410 Final Exam Questions And Answers 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • 5 types of bonds* - ANSWERBid bond Performance bond Payment bond Warranty bond Green bond *A101* - ANSWERLUMP sum contract *A111* - ANSWERCOST OF THE WORK PLUS FEE *A121 CMc* - ANSWERCM @ Risk *A131 CMc* - ANSWERCM @ Management A141 - ANSWERDesign-build *A201* - ANSWERGeneral Conditions A401 - ANSWERAgreement between contractor and sub All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. Cover...
    (0)
  • $14.99
  • + learn more
LSU CM 4100 (Assignment) Multiple  Choice Questions 100% Verified Rated A.
  • LSU CM 4100 (Assignment) Multiple Choice Questions 100% Verified Rated A.

  • Exam (elaborations) • 12 pages • 2024
  • LSU CM 4100 (Assignment) Multiple Choice Questions 100% Verified Rated A.
    (0)
  • $12.49
  • + learn more
CM 4101 Exam Prep Questions Answered 100% Correc
  • CM 4101 Exam Prep Questions Answered 100% Correc

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • A significant difference between "planning" and "scheduling" is, - Answer Scheduling determines when to do, and planning determines what to do, how to and by whom. What is NOT true about an activity? - Answer An activity usually does not need to be measurable There is an activity, installing exterior sheathing. A crew can install 1,200 sf per day, and the total quantity is 3,200 SF. What is the duration of this activity? - Answer 3 days
    (0)
  • $11.99
  • + learn more
CM 410 Final Exam Questions & Answers 100% Correct
  • CM 410 Final Exam Questions & Answers 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • 5 types of bonds* - ANSWERBid bond Performance bond Payment bond Warranty bond Green bond *A101* - ANSWERLUMP sum contract *A111* - ANSWERCOST OF THE WORK PLUS FEE *A121 CMc* - ANSWERCM @ Risk *A131 CMc* - ANSWERCM @ Management A141 - ANSWERDesign-build *A201* - ANSWERGeneral Conditions A401 - ANSWERAgreement between contractor and sub All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. Cover...
    (0)
  • $11.99
  • + learn more
CM 4101 Midterm Exam Questions Solved 100% Correct
  • CM 4101 Midterm Exam Questions Solved 100% Correct

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • what is not true about an event - Answer an event usually consumes resources. an event usually takes time. major types of activities - Answer procurement, production/construction, management The conditions of limited resource availability dictate certain activities cannot be performed simultaneously. This is: - Answer resource constraint
    (0)
  • $11.49
  • + learn more
CM 4101 Exam Prep Test Questions Answered 100% Correct
  • CM 4101 Exam Prep Test Questions Answered 100% Correct

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Starting a new project in P6 you must first: - Answer File - Close All 3 Establishing Relationships - Answer Finish-to-start, Start-to-start, Finish-to-finish Finish-to-start (FS) - DEFAULT - Answer A finishes, B can start Start-to-start (SS) - Answer A starts, B can start
    (0)
  • $11.49
  • + learn more
CM 410 Final Exam Questions & Answers 100% Correct
  • CM 410 Final Exam Questions & Answers 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • *5 types of bonds* - ANSWERBid bond Performance bond Payment bond Warranty bond Green bond *A101* - ANSWERLUMP sum contract *A111* - ANSWERCOST OF THE WORK PLUS FEE *A121 CMc* - ANSWERCM @ Risk *A131 CMc* - ANSWERCM @ Management A141 - ANSWERDesign-build *A201* - ANSWERGeneral Conditions A401 - ANSWERAgreement between contractor and sub All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. Cove...
    (0)
  • $15.99
  • + learn more
Practice Exam for CEE 4100 Test 2 Questions and Answers
  • Practice Exam for CEE 4100 Test 2 Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Practice Exam for CEE 4100 Test 2 Questions and Answers Actual Cost of Work Performed (ACWP) - CORRECT ANSWER-Actual work hours or dollars to date represent what has been paid Banks Evaluation - CORRECT ANSWER-Contractors = high risk, so loan only thru inventories and partially complete with high interest rate Bid estimate - CORRECT ANSWER-Contractor prepares estimate of job's cost with markup for profit Budgeted Cost at Completion (BCAC) - CORRECT ANSWER-original project estimate Budgeted...
    (0)
  • $14.49
  • + learn more