Basic rigging review - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Basic rigging review? On this page you'll find 42 study documents about Basic rigging review.

Page 3 out of 42 results

Sort by

Mechanic Review Eligibility Course_100% A+ Graded with Updated and Correct Questions and Answers
  • Mechanic Review Eligibility Course_100% A+ Graded with Updated and Correct Questions and Answers

  • Exam (elaborations) • 15 pages • 2024
  • Mechanic Review Eligibility Course_100% A+ Graded with Updated and Correct Questions and Answers What percaution should you take before entering the step/treadway band of an escalator or moving walk? - CORRECT ANSWER-Lock out and tag out the mainline disconnect When pepering to install moving walks, you need to check th wellway-to-wellway. The print calls for a distance of 44044mm. What would the reading be using standard measurments? - CORRECT ANSWER-144' 6" What practices should be ...
    (0)
  • $5.94
  • + learn more
NCCER Basic Rigging Test Review Exam Questions With Verified Answers
  • NCCER Basic Rigging Test Review Exam Questions With Verified Answers

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • NCCER Basic Rigging Test Review Exam Questions With Verified Answers The main connection fitting for chain slings is the - answermaster link To form an endless-loop web sling, you must ----------- the ends together - answersplice A ---------- is the distance it takes for one strand of wire rope that makes a complete turn around the core. - answerone-rope lay A pulley system that has a mechanical advantage for lifting a load is a - answerhoist A -------------- is good for moving loads such...
    (0)
  • $10.49
  • + learn more
Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 (100% Verified)
  • Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 (100% Verified)

  • Exam (elaborations) • 16 pages • 2024
  • Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 (100% Verified) A floating crane with a capacity of 200,000lbs. is a crane.: Category 1 2. What is the category of a jib crane with a capacity of less than 20,000 pounds?: Category 3 3. An OET, Bridge crane with a capacity of 80,000lbs. is a crane.: Category 2 4. A commercial truck mounted crane with a capacity of 14,000 lbs. is a crane.: category 4 5. What types of power does a Category 1 or 4 crane genera...
    (0)
  • $15.49
  • + learn more
MODULE 6-----NCCER INTRODUCTION TO BASIC RIGGING TEST REVIEW 36------54.
  • MODULE 6-----NCCER INTRODUCTION TO BASIC RIGGING TEST REVIEW 36------54.

  • Exam (elaborations) • 4 pages • 2024
  • MODULE 6-----NCCER INTRODUCTION TO BASIC RIGGING TEST REVIEW 36------54.
    (0)
  • $13.99
  • + learn more
MODULE 6-----NCCER INTRODUCTION TO BASIC RIGGING TEST REVIEW 36------54.
  • MODULE 6-----NCCER INTRODUCTION TO BASIC RIGGING TEST REVIEW 36------54.

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • MODULE 6-----NCCER INTRODUCTION TO BASIC RIGGING TEST REVIEW 36------54.
    (0)
  • $13.99
  • + learn more
CPP Practice Test Questions and Answers 100% Pass
  • CPP Practice Test Questions and Answers 100% Pass

  • Exam (elaborations) • 11 pages • 2023
  • CPP Practice Test Questions and Answers 100% Pass William may make changes in the Procurement Department. what is his first step when considering a new process? a. Engaging in a process mapping activity b. Identifying a need for change c. Building a flowchart d. Creating a policy and procedures manual Identifying a need for change Sam's team in creating steps for requisition processing. Which of the statements describe why implementing processes is important? Use of processes promotes: a....
    (0)
  • $9.99
  • + learn more
Mechanic Review Eligibility Course_Study Guide Questions and Answers 100% A+
  • Mechanic Review Eligibility Course_Study Guide Questions and Answers 100% A+

  • Exam (elaborations) • 15 pages • 2024
  • Mechanic Review Eligibility Course_Study Guide Questions and Answers 100% A+ What percaution should you take before entering the step/treadway band of an escalator or moving walk? - CORRECT ANSWER-Lock out and tag out the mainline disconnect When pepering to install moving walks, you need to check th wellway-to-wellway. The print calls for a distance of 44044mm. What would the reading be using standard measurments? - CORRECT ANSWER-144' 6" What practices should be followed when initia...
    (0)
  • $5.74
  • + learn more
CIPS L4M8 Exam Questions and Answers (100% Guaranteed Pass)
  • CIPS L4M8 Exam Questions and Answers (100% Guaranteed Pass)

  • Exam (elaborations) • 58 pages • 2024
  • Stage 13: Assest management/end of life The procurement professional should evaluate whether the need is still current. If it is and unchanged, the procurement cycle process commences again but from a different stage as the need is already known and understood. If the need is not required the buyer should manage the end of life by reducing stock levels and informing the supplier Anti-bribery procedures -Proportionate procedures: should be in line with the ype of bribery risk and scale tha...
    (0)
  • $12.49
  • + learn more
CFE Exam 349 Questions with Verified Answers,100% CORRECT
  • CFE Exam 349 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 69 pages • 2024
  • CFE Exam 349 Questions with Verified Answers Falsified Hours & Salary Schemes - CORRECT ANSWER The most common method of misappropriating funds from the payroll is the overpayment of wages. For hourly employees, the size of a paycheck is based on two factors: the number of hours worked and the rate of pay. Therefore, for hourly employees to fraudulently increase the size of their paycheck, they must either falsify the number of hours they have worked or change their wage rate. Common ways ...
    (0)
  • $13.49
  • + learn more
COO Practice Written Exam Questions and Answers
  • COO Practice Written Exam Questions and Answers

  • Exam (elaborations) • 28 pages • 2024
  • What are some hazards for mobile cranes excavations? - Vibrations from other equipment, previously excavated soils When do you consider the weight of the wire rope to be part of the load for deductions? - Multi part reeve when extra line is not necessary to make the pick You never take the weight of the wire rope on top of the boom as a deduction? - True What best describes a luffing jib? - Boom with a dedicated winch that acts independent of the main boom. Where does most boom damage come f...
    (0)
  • $12.00
  • + learn more