CDT Exam Questions And Correct Answers
- Exam (elaborations) • 82 pages • 2023
-
Available in package deal
-
- $15.49
- + learn more
CDT Exam Questions And Correct 
Answers 
Select the entity which is generally assigned the following duties 
and responsibilities by the Conditions of the Contract: Protection 
of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 
Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 
10.4. Also see CCAPG 6.8; CCP...
-
CONS LAW Exam Questions with Correct Answers
- Exam (elaborations) • 26 pages • 2024
-
Available in package deal
-
- $13.39
- + learn more
CONS LAW Exam Questions with Correct Answers 
Which group does not have their own standard form construction contracts? 
A. American Institute of Architects (AIA) 
 B. Associated General Contractors of America (AGC) 
 C. American Institute of Constructions (AIC) 
 D. The Engineers Joint Contract Documents Committee (EJCDC) - Answer-American Institute of Constructions (AIC) 
 
A contract ______________________ . (Select one) 
 A. cannot be formed by actions alone 
 B. must be a written document 
...
-
CNST 2341 fInal Questions With 100% Correct Answers!!
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
`serve as one point of responsibility to who? - the owner 
`The 3 method of payment are ? - 1. Lump Sum 
2. Unit price 
3. Cost Plus 
`total float or simply "float" is also referred to as a what - "slack" 
`With OCIPs and CCIPs the disadvantages of the programs includes what? - increased 
administration burden by the owner or contractor 
`With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must 
what? - Be paid for with private the owner. 
A certifi...
-
DBIA 175 Exam Study Guide Questions with Complete Solutions
- Exam (elaborations) • 28 pages • 2024
-
- $10.49
- + learn more
DBIA 175 Exam Study Guide Questions with Complete Solutions 
DBIA Document 580 - Teaming Agreement - Correct Answers Between Design-Builder and teaming party 
 
Components of Teaming Agreement - Correct Answers qualifications, insurance, matrix of responsibilities, confidentiality and exclusivity, payment of stipend/honoarrium 
 
URS CORP v TRANSPO - does teaming agreement waiver survive if subcontract supersedes teaming agreement? - Correct Answers yes. subcontract was silent, waiver in prime f...
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
Make study stress less painful
-
Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions
- Exam (elaborations) • 16 pages • 2023
-
- $12.99
- + learn more
AIA Document C-401 refers to: correct answer: C. Architect-Consultant Agreement 
 
According to AIA Document C-401, The General Provisions (Articles 1.1 & 1.2), provide the following clarifications of the contract (Choose the one (1) which does not apply): correct answer: B. The architect can require the consultant to do whatever they believe is necessary. 
 
According to AIA Document C-401 (1.5), except as otherwise authorized by the Architect, all communications between the Consultant and th...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024
-
- $12.99
- + learn more
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
-
CDT Test Questions 2024 Graded A+
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $10.99
- + learn more
CDT Test Questions 2024 Graded A+ 
 
 
1. What establishes the relationship between the Contractor and the Architect/Engineer (A/E)? 
 
A - National laws 
B - Signed agreements 
C - Third-party obligations 
D - Special conditions - ANSWERSAnswer: C - Third-party obligations. The Contractor and the A/E do not have any signed agreements, the general terms and conditions of their respective contracts with the Owner provide them with third party obligations to each other. 
 
Reference: See PDPG Sect...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024
-
Available in package deal
-
- $12.02
- + learn more
CDT Exam Questions | 100% Correct Answers | 
 
Verified | Latest 2024 Version 
 
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10...
-
CDT Practice Exam Final questions and answers A-graded
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- $17.49
- + learn more
CDT Practice Exam Final questions and 
answers A-graded 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - CORRECT ANSWER-Answer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usua...