Underground utilities - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Underground utilities? On this page you'll find 286 study documents about Underground utilities.

Page 2 out of 286 results

Sort by

NCCCO / CCO Crane Exams BUNDLED TOGETHER (Latest 2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A
  • NCCCO / CCO Crane Exams BUNDLED TOGETHER (Latest 2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • NCCCO / CCO Crane Exams BUNDLED TOGETHER (Latest 2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A Q: Side loading may be caused by: Answer: Starting and stopping the swing rapidly Q: What is the best procedure to follow when underground utilities may be present? Answer: Contact local utility company Q: eccentric main boom tip reeving causes: Answer: Twisting of the boom Q: How many randomly broken wires in one lay, must there be to remove running wire rope from service? ...
    (0)
  • $7.99
  • + learn more
IMSA Traffic Signal Technician Level 1 | Questions and Verified Answers 100% Correct | Grade A | 2024 / 2025
  • IMSA Traffic Signal Technician Level 1 | Questions and Verified Answers 100% Correct | Grade A | 2024 / 2025

  • Exam (elaborations) • 29 pages • 2024
  • IMSA Traffic Signal Technician Level 1 | Questions and Verified Answers 100% Correct | Grade A | 2024 / 2025 Hazardous underground utilities: Works must be aware of what ? Correct Answer Of the location of utilities that cannot be readily seen, including what type they are and the potential for danger that they possess. "Accessible pedestrian signals usually include a ? Correct Answer Signal device that feature audible and/or vibrio tactile indications of the walk interval "Full vis...
    (0)
  • $7.98
  • + learn more
CMP 305 Final Exam Questions with Correct Answers
  • CMP 305 Final Exam Questions with Correct Answers

  • Exam (elaborations) • 18 pages • 2024
  • CMP 305 Final Exam Questions with Correct Answers What info needs to be collected for surface evaluation? - Answer-- Soil maps - Topographic maps - Aerial photos - USGS topographic quadrangle maps - USDA soil conservation maps What features can be observed from bird's eye view of maps? - Answer-- Land patterns - Sink holes - Drainage patterns (low areas) What things should you check when visiting a site? - Answer-- Water level - Existing wells - Water marks - Underground utilit...
    (0)
  • $12.49
  • + learn more
PPD Exam Questions & Answers 2024/2025
  • PPD Exam Questions & Answers 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • PPD Exam Questions & Answers 2024/2025 SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ANSWERSALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES - ANSWERSABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING - ANSWERSMINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW G...
    (0)
  • $8.49
  • + learn more
NCCCO core 343 Questions with 100% Verified Correct Answers
  • NCCCO core 343 Questions with 100% Verified Correct Answers

  • Exam (elaborations) • 28 pages • 2024
  • Available in package deal
  • NCCCO core 343 Questions with 100% Verified Correct Answers If taking sides strain on a boom what concerns the operator the most - Correct Answers Boom damage If a crane load chart has capacities listed in the shaded area this means that - Correct Answers If overloaded structural confidence will be compromised As the layers of rope on a drum increase the allowable line Pull wil - Correct Answers Decrease Of the following actions which one will most likely cause a side load condition - ...
    (0)
  • $10.49
  • + learn more
ARE 5.0 – PPD exam with 100% Correct | Latest Updated Graded A+
  • ARE 5.0 – PPD exam with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 13 pages • 2024
  • SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES - ABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING - MINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW GROUND 0.3% SITE DESIGN: UNDERGROUND ITEMS - STORM DRAINS COLLE...
    (0)
  • $9.49
  • + learn more
ARE 5.0 - PPD EXAM 2024/2025 WITH 100% CORRECT ANSWERS
  • ARE 5.0 - PPD EXAM 2024/2025 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 9 pages • 2024
  • SITE DESIGN: BLDG LOCATION/IMPROVEMENTS correct answersALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES correct answersABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING correct answersMINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW GROUND 0.3% SITE DESIGN:...
    (0)
  • $16.49
  • + learn more
California Contractor's License General Building (B)
  • California Contractor's License General Building (B)

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • The first step in any major construction job.? - correct answer-Clearing and Leveling Clearing the lot ensure.? - correct answer-That the various work crew will be able to perform their job efficiently Underground Service Alert.? - correct answer-A free service that provides damage prevention services What will the underground service alert review.? - correct answer-All excavation plans and will send a crew to mark to mark the location of the underground utilities that are entering the ...
    (0)
  • $11.99
  • + learn more
Nicet Highway Construction Level 2 Questions and Answers Already Passed
  • Nicet Highway Construction Level 2 Questions and Answers Already Passed

  • Exam (elaborations) • 14 pages • 2023
  • Nicet Highway Construction Level 2 Questions and Answers Already Passed What are the 5 types of bridge abutments? Closed Abutment, Stub or Perched Abutment, Pedestal or Spill-through Abutment, Integral End Bents, Mechanically Stabilized Abutment What is a "closed abutment"? A closed abutment is a full-height wall with wing walls on each side that retains the full height of the approach embankment. This type of abutment minimizes the required span length of the bridge. What is a stub or perc...
    (0)
  • $9.99
  • 1x sold
  • + learn more
Bicsi RTPM 002 section 1 Site Survey question correctly answered 2023
  • Bicsi RTPM 002 section 1 Site Survey question correctly answered 2023

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • Bicsi RTPM 002 section 1 Site Survey question correctly answered 2023Pathway Considerations In planning for OSP cabling, cable infrastructure must be determined irst. The choices are underground, direct-buried, and aerial. Underground plant most expensive system, has the highest cable placement capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost Direct-buried plant A lifespan of 30 years or shorter, depending on different conditions ...
    (0)
  • $8.99
  • 1x sold
  • + learn more