Tank vent shall terminate - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Tank vent shall terminate? On this page you'll find 73 study documents about Tank vent shall terminate.
Page 2 out of 73 results
Sort by
-
Mass oil burner / NFPA 31 & NORA Exam Practice Questions and Answers 100% Pass
- Exam (elaborations) • 20 pages • 2024
-
- $12.49
- + learn more
Mass oil burner / NFPA 31 & NORA Exam Practice 
Questions and Answers 100% Pass 
Cast iron fittings can be used in heating fuel systems? - Correct Answer ️️ -False 
Tank vent shall terminate - Correct Answer ️️ -Within 12 feet of the fill and visible from 
the fill 
Tanks exceeding 330 gallons must have - Correct Answer ️️ -Top supply connection 
Fuel return piping from an appliance shall - Correct Answer ️️ -Enter the top of the 
tank 
Oil appliances burning used oil shall only ...
-
IRC Plumbing Exam Quiz Prep With Answers
- Exam (elaborations) • 14 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
IRC Plumbing Exam Quiz Prep With Answers 
 
Storm drainage sump pumps shall be of a capacity and head appropriate to _______ use requirements. - ANS anticipated 
 
Electrical services within the scope of the IRC are limited to _____-volt, 0- to _____- ampere, single-phase systems. - ANS 120/240 & 400 
 
Boiler pressure-relief valve discharge shall be pipes to drains by gravity to within _____ inches of the floor or to an open receptor. - ANS 18 
 
Polyethylene tubing for hydronic p...
-
HVAC KY598 JOURNEYMAN EXAM PREP QUESTIONS AND VERIFIED CORRECT ANSWERS GRADED A+
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $9.49
- + learn more
HVAC KY598 JOURNEYMAN EXAM PREP QUESTIONS AND VERIFIED CORRECT ANSWERS GRADED A+ 
 
Soldering on a metal portion of a hydronic piping system shall be performed a minimum of ________ inches from any plastic to metal adapter in the same water line. 
18 
Where gas piping is required to be installed in conduit and one end terminates outdoors, the conduit must extend not less than ________ inches outside the building. 
4 
Domestic clothes dryer exhaust ducts shall be constructed of metal not less tha...
-
Plumbing Study Exam Questions With Complete Solutions
- Exam (elaborations) • 35 pages • 2023
-
Available in package deal
-
- $12.99
- + learn more
Building sewers shall be tested by completely filling the sewer with water from the ______ 
A. Lowest to highest point 
B. Lowest to at least 5' head 
C. Lowest to at least 10' head 
D. Lowest to at least ground level correct answer: C. Lowest to at least 10' head 
 
Hot and cold water piping may be tested with ____ 
A. 40 psi-150 psi water for 10 minutes 
B. 35 psi for at least 15 minutes 
C. 50 psi or the working pressure of the water in the system for at least 15 minutes 
D. 100 psi of ai...
-
Mass oil burner -NFPA 31 & NORA Exam Questions and Answers
- Exam (elaborations) • 16 pages • 2024
-
- $12.49
- + learn more
Mass oil burner -NFPA 31 & NORA Exam 
Questions and Answers 
Cast iron fittings can be used in heating fuel systems? - Answer️️ - False 
Tank vent shall terminate - Answer️️ - Within 12 feet of the fill and visible from the fill 
Tanks exceeding 330 gallons must have - Answer️️ - Top supply connection 
Fuel return piping from an appliance shall - Answer️️ - Enter the top of the tank 
Oil appliances burning used oil shall only be installed - Answer️️ - In commercial or industr...
Get paid weekly? You can!
-
Journeyman Oil Exam Questions and Answers | Verified & Updated| 100% Correct
- Exam (elaborations) • 30 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Journeyman Oil Exam Questions and Answers | 
Verified & Updated| 100% Correct 
The use of furnace cement or other materials to seal a cracked heat exchanger or parts which 
provide closure shall be for _________ repairs only. - Answer ️️ -Temporary repairs 
If a fuel storage tank is permanently removed from service for whatever reason, the tank and all 
the piping connected to it, including the outside fill and vent piping and any supply piping 
connected to the appliance, shall be: - Answer...
-
Journeyman Plumbing Test Study Guide - Q & A with Complete Solutions
- Exam (elaborations) • 23 pages • 2024
-
- $16.49
- + learn more
Journeyman Plumbing Test Study Guide - Q & A with Complete Solutions Water heater discharge piping serving a pressure relief valve, temperature relief valve or combination thereof shall terminate not more than ______ above and not less than ______ above the floor or flood level rim of the waste receptor. 6 inches two times the discharge pipe diameter Where a storage tank-type water heater or a hot water heater storage tank is installed in a location where leakage will cause damage, the tank sh...
-
Maine Gas Exam - with codes Questions and Answers New (2024/2025) Solved 100% Correct
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
A 10" natural gas main pipe is installed to supply a power plant; however, the pipe has a bad valve that 
must be replaced. How much of the 10" must be purged with inert gas before work can begin? - 
All of it 
NFPA 54 Table 8.3.1 
A 127 foot long gas line is being installed in metallic pipe. The system is undiluted LP gas with an inlet 
pressure of 11.0 in w.c., with a 0.5 in. w.c. pressure drop and a specific gravity of 1.50. The appliance 
requires 1,670 cubic BTU of LP gas. What size metal...
-
Oil Burner License Practice Questions and Answers 100% Pass
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Oil Burner License Practice Questions and 
Answers 100% Pass 
What is the first thing a tech should do when arriving at a no combustion call? - Correct 
Answer ️️ -Ask how many times the customer reset the unit. 
What is the best long term solution for preventing a clogged nozzle? - Correct Answer ️️ 
--Remove any underground storage tanks. 
-Install a quality oil filter. 
-Cut the suction line 10" above the tank outlet to prevent sludge. 
Hot water and steam valves are interchangeable....
-
Oil Burner License Exam Questions With Verified Answers
- Exam (elaborations) • 18 pages • 2024
-
- $11.49
- + learn more
Oil Burner License Exam Questions With 
Verified Answers 
What is the first thing a tech should do when arriving at a no combustion call? - answerAsk 
how many times the customer reset the unit. 
What is the best long term solution for preventing a clogged nozzle? - answer-Remove any 
underground storage tanks. 
-Install a quality oil filter. 
-Cut the suction line 10" above the tank outlet to prevent sludge. 
Hot water and steam valves are interchangeable. - answerFalse 
When in the presence o...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia